Indkøb: Maskiner og apparater til filtrering eller rensning af gasser

>20 arkiverede indkøb

De seneste indkøb af maskiner og apparater til filtrering eller rensning af gasser i Danmark

2023-07-07   Procurement of M/R station Smorup (Energinet Gastransmission A/S)
The Contracting Authority wants to purchase a M/R station (Measuring & Regulating Station). The station is to be used for pressure reduction of natural gas between the transmission pipeline (80-55 barg) and the distribution pipeline (35-55 barg). The M/R station is part of FTB (Fast track Biogas) project, in which the gas from the distribution line pressurizes and deodorizes the gas to the transmission line. This will enable flow of biogas both ways, making it possible to distribute gas national in … Se udbuddet »
2023-04-14   Framework Agreement for deodorization units with THT analyser (Energinet)
In Denmark, the amount of biogas in the distribution grids increases. When bio natural gas (biomethane) from distribution grids is fed into the transmission grid, the concentration of odorant present in the gas needs to be reduced to accepted trace amounts max (1.0 mg THT/Nm3). The removal of the odorant, tetrahy-drothiophene (THT), will be executed by a deodorization unit, at the place of injection into the transmission system. The Framework Agreement covers purchase of a number of deodorizing units for … Se udbuddet »
2023-03-13   Framework agreement for deodorization units with THT analyses (Energinet)
In Denmark, the amount of biogas in the distribution grids increases. When bio natural gas (biomethane) from distribution grids is fed into the transmission grid, the concentration of odorant present in the gas needs to be reduced to accepted trace amounts max (1.0 mg THT/Nm3). The removal of the odorant, tetrahy-drothiophene (THT), will be executed by a deodorization unit, at the place of injection into the transmission system. The Framework Agreement covers purchase of a number of deodorizing units for … Se udbuddet »
2022-11-01   Udbud af filter til ventilationsanlæg (Syddansk Universitet)
Formålet med udbuddet er skaffe SDU de, efter bedste forhold mellem pris og kvalitet, rigtige filtrer til ventilationsanlæggene på SDU. Det er derfor afgørende for Ordregiver, at Tilbudsgiverne i deres tilbud fokuserer på de krav og evalueringskrav, som Tilbudsgiver har skrevet. Se udbuddet »
Nævnte leverandører: Safematic A/S
2022-10-04   Udbud af filter til ventilationsanlæg (Syddansk Universitet)
Formålet med udbuddet er skaffe SDU de, efter bedste forhold mellem pris og kvalitet, rigtige filtrer til ventilationsanlæggene på SDU. Det er derfor afgørende for Ordregiver, at Tilbudsgiverne i deres tilbud fokuserer på de krav og evalueringskrav, som Tilbudsgiver har skrevet. Se udbuddet »
2022-08-15   Carbon Capture (I/S Vestforbrænding)
I/S Vestforbrænding (hereinafter ’VF’) hereby calls for tenders for a design and build contract regarding a Carbon Capture Plant to be installed at VF’s existing incineration plant at Ejby Mosevej 219, 2600 Glostrup, Denmark. The scope of the contract is: • A complete carbon capture plant including separation and compression of CO2 and utilization of surplus heat for district heating by means of heat pumps. • All necessary flue gas channels from battery limits. • If necessary, a wastewater treatment for … Se udbuddet »
2022-01-20   Framework Agreement concerning M/R stations for Green Gas Lolland-Falster-, Kildedal- and West Funen projects (Energinet Teknik og Anlæg A/S)
The Contracting Authority wants to establish a framework agreement concerning M/R-stations (Measuring & Regulating Stations). The stations are to be used for pressure reduction of natural gas between the transmission pipeline (80-46 barg) and the distribution pipeline (55-12 barg). The three stations might need to be delivered simultaneously. The framework agreement concerns potentially three M/R-station for three different projects. The three projects are: - Green Gas Lolland-Falster: M/R-station … Se udbuddet »
Nævnte leverandører: Bohlen & Doyen Bau GmbH
2021-11-26   Indkøb af VHP kammer (1) (Statens Serum Institut)
Ordregiver har behov for et nyt VHP dekontamineringskammer inklusive en 5-årig serviceaftale. Udbuddet gennemføres som et offentligt udbud efter udbudslovens afsnit II. Udbuddet omfatter alene en tilbudsfase. For yderligere oplysninger om processen og kontraktens omfang henvises til udbudsmaterialet. Se udbuddet »
2021-10-15   Forbrugsvarer til anæstesi og intensiv (Region Nordjylland)
Region Nordjylland og Region Sjælland udbyder et fællesudbud med forbrugsvarer til anæstesi og intensiv. Region Nordjylland er tovholder. Der udbydes forbrugsvarer til anæstesi og intensiv, herunder blandet andet: spinalkanyler, epiduralkanyler, larynxmasker, endotrachealtuber, tracheostomier og tilbehør, cirkelsystemer, slanger til aktiv fugtning, respiratorfiltre, anæstesimaskiner, NIV maskiner, sugekatetre, ultralydscovers, regional anæstesi nåle, ventilationssæt, resucitatorer, SpO₂ sensore, … Se udbuddet »
Nævnte leverandører: Ambu Ambu A/S B. Braun Medical A/S ConvaTec Denmark A/S Dräger Danmark A/S Fisher & Paykel Healthcare Furine ApS GM Medical A/S H. Dam Kærgaard A/S Intersurgical, Filial af Intersurgical AB, Sverige Intersurgical, Filial af Intersurgical... Medidyne A/S Mediplast A/S Mediq Danmark A/S Medtronic Danmark A/S Secma ApS Smiths Medical Danmark ApS Smiths Medical Danmark ApS. Surcon Care Line ApS William Cook Europe ApS
2021-09-17   Filter til Ventilationsanlæg (Danmarks Tekniske Universitet - DTU)
DTU ønsker at indgå en rammeaftale på det samlede indkøb af filtre og kileremme til ventilationsanlæg til henholdsvis Lyngby, Ballerup og Risø.. Rammeaftalen udbydes som en 2 årig aftale der omfatter også ”grønne filtre” med fokus på energiforbruget. Se udbuddet »
Nævnte leverandører: AAF/Dinair Aps
2021-03-05   Deodorization Units for Tetrahydrothiophene (THT) Removal from Bio Natural Gas (Energinet Teknik og Anlæg A/S)
In Denmark, the amount of biogas on the distribution grids increases. When bio natural gas (biomethane) from distribution grids is fed into the transmission grid, the concentration of odorant present in the gas needs to be reduced to trace amounts before the gas enters the transmission grid. The removal of the odorant, tetrahydrothiophene (THT), will be executed by a deodorization unit, at the place of injection into the transmission system. The tendered assignment is the supply and installation of one … Se udbuddet »
2021-02-01   Røggasrensningsanlæg til Sejerøbugtens færger, Kalundborg Kommune (Kalundborg Kommune)
Udbuddet vedrører indkøb af røggasrensningsanlæg samt installering af røggasrensningsanlæg for MF Sejerøfærgen samt option for MF Nekseløfærgen. Se udbuddet »
2020-05-29   Nyt gasmotoranlæg, Esbjerg Renseanlæg Øst (DIN Forsyning A/S)
Projektering og etablering af nyt gasmotoranlæg, herunder bl.a. gasmotor, udstødningsvekslersystem, maskinkomponenter, motorstyretavleanlæg og gaskedel med skorsten samt service for gasmotor. Se udbuddet »
Nævnte leverandører: Krebs A/S
2020-05-27   Deodorisation Unit for Tetrahydrothiophene (THT) Removal from Bio Natural Gas (Energinet Teknik og Anlæg A/S)
In Denmark, the amount of bio gas on the distribution grids increases. When bio natural gas (biomethane) from distribution grids is fed into the transmission grid, the concentration of odorant present in the gas needs to be reduced to trace amounts before the gas enters the transmission grid. The removal of the odorant, tetrahydrothiophene (THT), will be executed by a deodorisation unit at the place of injection into the transmission system. The tendered assignment is the supply and installation of a … Se udbuddet »
Nævnte leverandører: Bilfinger EMS GmbH
2020-05-11   Negotiated Procedure of Lot E: Wood Chips Boiler Line incl. Day Silo, Flue Gas Condensation and Ash Handling for DIN... (DIN Forsyning A/S)
This invitation to tender concerns the procurement of Lot E: Wood chips boiler line incl. day silo, flue gas condensation and ash handling for DIN Forsyning Varme A/S. Se udbuddet »
Nævnte leverandører: KPA Unicon Oy
2020-04-30   Gasmotoranlæg til Esbjerg Renseanlæg Øst (DIN Forsyning A/S)
Projektering og etablering af nyt gasmotoranlæg, herunder bl.a. gasmotor, udstødningsvekslersystem, maskinkomponenter, motorstyretavleanlæg og gaskedel med skorsten samt service for gasmotor. Se udbuddet »
2019-12-19   Deodorization Units for Tetrahydrothiophene (THT) Removal from Bio Natural Gas (Energinet Teknik og Anlæg A/S)
In Denmark, the amount of biogas on the distribution grids increases. When bio natural gas (biomethane) from distribution grids is fed into the transmission grid, the concentration of odorant present in the gas needs to be reduced to trace amounts before the gas enters the transmission grid. The removal of the odorant, tetrahydrothiophene (THT), will be executed by a deodorization unit, at the place of injection into the transmission system. The tendered assignment is the supply and installation of 2 … Se udbuddet »
Nævnte leverandører: Bilfinger EMS GmbH
2019-07-15   Contract for Procurement of Gas Preheaters and Gas Filters for Nybro Gas Installation (Energinet Gas TSO A/S)
The Contracting Authority wants to purchase three (3) Gas Pre-Heaters (heat exchange units) and three (3) Gas Filters incl. commissioning support, spare parts and storage cost in total for installation at Nybro Gas Terminal. The scope is divided into 2 product groups. Each of the 2 product groups (preheaters/heat exchanges and gas filters) listed above will be described in separate lot. The technical specification for the gas preheaters consists of the following documents: — Appendix 2A.1: Data Sheet: … Se udbuddet »
Nævnte leverandører: FILTAN Bau- und Anlagentechnik GmbH
2019-06-12   Contract for Procurement of Gas Pre-Heaters and Gas Filters for Nybro Gas Installation (Energinet TSO Gas A/S)
The Contracting Authority wants to purchase three (3) gas pre-heaters (heat exchange units) and three (3) gas filters incl. commissioning support, spare parts and storage cost in total for installation at Nybro Gas Terminal. The scope is divided into 2 product groups. Each of the 2 product groups (pre-heaters/heat exchanges and gas filters) listed above will be described in separate lot. The technical specification for the gas pre-heaters consist of the following documents: — Appendix 2A: Data Sheet: … Se udbuddet »
2019-06-11   Indkøb af HEPA filter systemer til den Veterinære Beredskabsbygning på Statens Serum Institut (1) (Statens Serum Institut)
Koncernindkøb i Sundheds- & Ældreministeriet udbyder på vegne af Statens Serum Institut (SSI) aftale om indkøb af HEPA filter systemer til den Veterinære Beredskabsbygning på Artillerivej 5, 2300 København S til levering den 1.2.2020. Anskaffelsen omfatter: Levering, opstilling, dokumentation, test, mm. Udbuddet er et genudbud af Udbud 2019/S 075-177400, som blev annulleret med udbudsbekendtgørelse 2019/S 103-249387. Se udbuddet »
Nævnte leverandører: Camfil A/S
2019-04-12   Indkøb af HEPA filter systemer til den Veterinære Beredskabsbygning på Statens Serum Institut (Statens Serum Institut)
Indkøb af HEPA filter systemer til den Veterinære Beredskabsbygning på Statens Serum Institut. Statens Serum Instituts leverandør af ventilationsydelser vil stå for installationen af HEPA filter systemerne. Den Veterinære Beredskabsbygning er designet for indeslutningsforanstaltning klasse BSL 2-3 samt OIE3-OIE4. Der er også lokale klassificeret som GMO2. Se udbuddet »
2018-12-13   Anæstesi og Intensiv (Region Midtjylland)
Utensilier til anæstesi og intensiv, herunder: varmtvandsfugtning, cirkelsystemer, div. slanger, ventilationsposer og sæt, filtre, traceostomituber samt tilbehør, endotrachealtuber samt tilbehør, laryngealmasker, NIV masker og sugekatetre. Se udbuddet »
Nævnte leverandører: Ambu A/S ApodanNordic A/S ConvaTec Denmark A/S Dräger Danmark A/S Fisher & Paykel Healthcare GM Medical A/S Intersurgical, Filial af Intersurgical AB, Sverige KeboMed A/s Lohmann & Rauscher A/S Medidyne A/S Mediplast A/S Mediq Danmark A/S Medtronic Danmark A/S Nowus Healthcare A/S Philips Danmark Smiths Medical Denmark
2018-07-13   Udvidelse af Biogasanlæg, entreprise B, D og E (Aarhus Universitet)
Udvidelse af biogasforsøgsanlæg for Aarhus Universitet i Foulum, øst for Viborg. Efter udvidelsen vil biogassen blive anvendt til el-produktion i et brændselscelleanlæg og varmeproduktionen herfra skal udnyttes til intern varmeforsyning af såvel biogasanlæg som AU Foulum. Der skal etableres en varmetransmissionsledning fra brændselscelleanlægget til eksisterende kraftvarmeanlæg samt etableres en tilslutning til det nuværende varmesystem på biogasanlægget. Der skal etableres nye bygninger og … Se udbuddet »
2018-07-03   AK003 - Filter press 2 (I/S Vestforbrænding)
Vestforbrænding will install a filter press as part of the Halosep project at Vestforbrænding. The filter press system will be part of an entirely new indoor separation process for handling of fly ash at a Waste to Energy plant for household and industrial waste. In connection with this, the Employer intends to order a complete functional delivery consisting of a skid-mounted filter press system. It is consisting of but not limited to include local control system, motor cabinets, internal cabling and … Se udbuddet »
Nævnte leverandører: Matec Srl
2018-07-02   AK002 - Filter press 1 (Vestforbrænding)
Vestforbrænding will install a filter press as part of the Halosep project at Vestforbrænding. The filter press system will be part of an entirely new indoor separation process for handling of fly ash at a Waste to Energy plant for household and industrial waste. In connection with this, the Employer intends to order a complete functional delivery consisting of a skid-mounted filter press system. It is consisting of but not limited to include local control system, motor cabinets, internal cabling and … Se udbuddet »
Nævnte leverandører: Matec Srl
2018-06-29   Replacement of Gas / Gas Heater (ARGO I/S)
Replacement of Gas / Gas Heater. Se udbuddet »
Nævnte leverandører: Flucorrex AG
2018-06-27   Band filter 4 (I/S Vestforbrænding)
I/S Vestforbrænding will install a band filter system as part of the Halosep project at Vestforbrænding. The band filter system will be part of an entirely new indoor separation process for handling of fly ash at a waste to energy plant for household and industrial waste. In connection with this, the Employer intends to order a complete functional delivery consisting of a skid-mounted band filter system. Se udbuddet »
Nævnte leverandører: BHS-Sonthofen GmbH
2018-06-25   Band filter 1 (I/S Vestforbrænding)
I/S Vestforbrænding will install a band filter system as part of the Halosep project at Vestforbrænding. The band filter system will be part of an entirely new indoor separation process for handling of fly ash at an incineration plant for household waste. Se udbuddet »
Nævnte leverandører: BHS-Sonthofen GmbH
2018-04-23   Band filter 4 (Vestforbrænding)
Vestforbrænding will install a band filter system as part of the Halosep Project at Vestforbrænding. The band filter system will be part of an entirely new indoor separation process for handling of fly ash at a Waste to Energy plant for household and industrial waste. In connection with this, the Employer intends to order a complete functional delivery consisting of a skid-mounted band filter system as specified in the following. It is consisting of but not limited to include local control system, motor … Se udbuddet »
2018-04-09   Filter press 3 (Vestforbrænding)
I/S Vestforbrænding will install a band filter system as part of the Halosep project at Vestforbrænding. The filter press system is part of an indoor separation processes for handling of fly ash at a Waste to Energy plant processing household and industrial waste. In connection with this, the Employer intends to order a complete functional delivery consisting of a skid-mounted filter press system as specified in the following. It is consisting of but not limited to include local control system, motor … Se udbuddet »
2018-04-06   Filter press 2 (Vestforbrænding)
The filter press system is part of an indoor separation processes for handling of fly ash at a plant processing household waste. In connection with this, the Employer intends to order a complete functional delivery consisting of a skid-mounted filter press system as specified in the following. It is consisting of but not limited to include local control system, motor cabinets, internal cabling and piping, etc. Se udbuddet »
2018-03-15   Band Filter 1 (Vestforbrænding)
I/S Vestforbrænding will install a band filter system as part of the Halosep project at Vestforbrænding.The band filter system will be part of an entirely new indoor separation process for handling of fly ash at an incineration plant for household waste. In connection with this, the Employer intends to order a complete skid-mounted package unit band filter system as specified, fully operational in island mode with local control system, motor cabinets, internal cabling and piping, etc. Se udbuddet »
2017-03-27   Straw Preparation System (Fjernvarme Fyn A/S)
Fjernvarme Fyn power station is located in Odense, a few kilometres from the city centre. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant. Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant. To successfully co-fire the straw the size of the straw needs to be reduced to a size below 50 mm. This call for tender addresses LOT M2. The purchase includes four identical straw preparation lines each consisting of … Se udbuddet »
2015-10-12   Establishment of flue gas condensation plant on existing waste-to-energy facility (Energnist)
Retrofit of a flue gas condensation plant with direct condensation to an existing wet flue gas cleaning plant on a Waste-to-Energy facility. The flue gas condensation shall be based on a condensing scrubber and include condensate water treatment and inhouse connection to the district heating system. The Works consists of overall process layout, calculations, design, manufacturing and delivery, installation, commissioning and hand over of all machinery, controls and electrical systems. Se udbuddet »
Nævnte leverandører: Götaverken Miljö
2015-09-25   Framework agreement for Biogas Upgrading Plants (NGF Nature Energy Biogas A/S)
The Tenderers of BUPs are to provide their standard (off-the-shelf) Biogas Upgrading Plants (BUP) in the nominal capacity range of 200-5 000 Nm³/h of raw biogas volumetric flow rate at normal conditions (0 °C at 1 013 mbar) under Framework Agreement NE-FWA005-2015. The BUPs shall all be located in Denmark, but the exact number of BUPs and their location is not yet decided. This is subject to, amongst other, the number of biogas plants that will be developed in Denmark and their commercial rate of return … Se udbuddet »
Nævnte leverandører: Ammongas A/S
2015-04-14   HØK — Biomass-fired CHP plant — Helsingør — Electromechanical equipment (Helsingør Kraftvarmeværk A/S)
Helsingør Kraftvarmeværk A/S (HØK A/S) is planning a renewal of Helsingør CHP (HØK), establishing a biomass-fired boiler which produces steam to the already existing steam turbine. The fuel is expected to be primary wood chips, but other sustainable biomass resources may also be used. The existing CHP plant will still be able to operate and act as back-up for the new plant as long as appropriate. The total estimate for the Works is approximately 520 000 000 DKK. Helsingør Kraftvarmeværk A/S is owned by … Se udbuddet »
2015-04-01   Lot M6: Flue gas treatment system Lot M7: Flue gas condensing system (HOFOR Energiproduktion A/S)
Lot M6 — Flue gas treatment system. Full functional plant for dry flue gas cleaning consisting of bag filter with absorbent dosing for treatment of flue gases from a 500 MWth biomass CFB-boiler. Downstream of the flue gas treatment system (lot M6) a flue gas condensing system (lot M7) will be installed. The lot M6 supply includes one or several bag filter units, ducts, ID fan(s), silencer(s), silos and transport systems for absorbent and residues, electrical installations, insulation and cladding, … Se udbuddet »
2013-12-12   Biomassefyret Kraftvarmeværk i Lisbjerg, Boiler and Flue gas cleaning (AffaldVarme Aarhus, Teknik og Miljø, Aarhus Kommune)
The Purchase includes a strawfired steam boiler 540 C/110bar/approx 110MWth-input including auxilary equipment, feedwaterpumps, baghouse filter, flue gas condenser, condensate treatment, heat recovery and flue gas cleaning. The Purchase also includes buffersilos and dosing equipment for woodchips. The Purchase includes design, manufacturing, supply, installation, testing and commissioning. Se udbuddet »
Nævnte leverandører: Burmeister & Wain Energi A/S og STF
2013-10-16   Service på mekaniske ventilationsanlæg og centrale udsugningsanlæg under Jysk Fællesindkøb (Mariagerfjord Kommune)
Udbuddet omfatter udførelse af serviceeftersyn, udførelse af løbende reparationer under 5 000 DKK og vedligeholdelse, levering af reservedele i forbindelse hermed samt remme og filtre. Udbyder kan vælge at benytte aftalen enten som en årlig serviceaftale eller efter behov. Det fremgår af kolonne »serviceaftale« i Bilag 5 – Tilbudslisten, hvilke anlæg udbyder ønsker at tegne en årlig serviceaftale på. Udbuddet omfatter ikke køleanlæg, samt levering og udskiftning af mekaniske ventilationsanlæg og centrale … Se udbuddet »
2013-01-18   LOT M5: Upgrading of control and refurbishment of existing ElectroStatic Precipitator (ESP) for wood pellets (Vattenfall A/S)
LOT M5: Upgrading of control and refurbishment of existing Electro Static Precipitator (ESP) for wood pellets. Se udbuddet »
2012-12-20   Tail end (low dust) SCR system for Fynsværket unit 8 (Vattenfall A/S)
The purpose of the Qualification System is to establish a list of qualified Suppliers for a tail end (low dust) SCR system. The entire DeNOx system will require re-heating of the flue gas before the SCR-system and recovering the energy from the warm flue gas after the SCR-system by use of heat exchanger. The Works include design, manufacturing, supply, testing and commissioning. Flue gas flow: Approx 160.000 Nm3/h Fuel: Biomass (straw and wood chips) The SCR plant will be installed in a bio fired … Se udbuddet »
2011-10-06   Turn key SCR deNOx system for gas turbine boiler at DONG Energy Horsens CHP (combined heat and power) plant A/S (Horsens CHP Plant A/S. c/o DONG Energy Power A/S)
The main data of the existing plant are as follows: 1. Flue gas amount: 71,5 kg/s; 2. Gas turbine, model GE LM250PE; 3. Degasification type: Aalborg Ciserv A/S LV24; 4. Current NOx level, both with and without water injection: a) Without water injection: 1 100 mg/Nm3; b) With water injection: 680 mg/Nm3. The new SCR (selective catalytic reduction) plant must comply with the following requirements: 5. The following emissions must as a minimum be observed after installation and commissioning. When … Se udbuddet »
Nævnte leverandører: Industrivarme
2011-09-09   Tårnby Renseanlæg - Ombygning og renovering (Tårnbyforsyning Spildevand A/S)
Udbudet omfatter ombygning og renovering på Tårnby Renseanlæg i totalentreprise indeholdende projektering, levering, montage, idriftsættelse mv. Service og garantier i forbindelse med procesindkøring og -aflevering vil indgå i aftalen, og de nærmere vilkår vil fremgå af udbudsmaterialet. Bygge- og anlægsarbejdet opdeles i 4 delaftaler der bl.a. omfatter etablering af nye efterklaringstanke, nedrivning af gl. tanke, etablering af ny parkeringsplads, etablering af nyt luftrenseanlæg med 25 m skorsten, … Se udbuddet »
2011-08-31   Levering og installering af SCR deNOx anlæg på Horsens Kraftvarmeværk A/S - Gasturbinekedel (Horsens Kraftvarmeværk A/S. c/o DONG Energy Power A/S)
Levering og installering af Turn Key SCR deNOx anlæg på Horsens Kraftvarmeværk A/S - Gasturbinekedel. Det eksisterende anlægs hoveddata er som følger: 1. Røggasmængde: 71,5 kg/s 2. Gasturbine, model: GE LM250PE 3. Afgaskedeltype: Aalborg Ciserv A/S LV24 4. Nuværende NOx niveau, både med og uden vandindsprøjtning: a) Uden vandindsprøjtning: 1100 mg/Nm3 b) Med vandindsprøjtning: 650 mg/Nm3 Det nye SCR anlæg skal opfylde følgende krav: 5. Følgende emissioner skal som minimum opfyldes efter installation og … Se udbuddet »
2011-05-17   Mechanical and electrical technology supplies for a new combined heat and power producing waste incineration line in... (I/S Nordforbrænding)
Mechanical and electrical works for a new combined heat and power producing waste incineration line with a capacity of 10 tonnes waste per hour, with one common turbine/generator system. The waste incineration line is based on a moving grate concept, steam boiler with SNCR, followed by semi-dry flue gas treatment, including electrical system, control and monitoring system and all necessary auxiliary systems. The works are divided in 3 lots: Lot A: one waste incineration unit including incinerator based … Se udbuddet »