The main data of the existing plant are as follows:
1. Flue gas amount: 71,5 kg/s;
2. Gas turbine, model GE LM250PE;
3. Degasification type: Aalborg Ciserv A/S LV24;
4. Current NOx level, both with and without water injection:
a) Without water injection: 1 100 mg/Nm3;
b) With water injection: 680 mg/Nm3.
The new SCR (selective catalytic reduction) plant must comply with the following requirements:
5. The following emissions must as a minimum be observed after installation and commissioning. When determining the level of NOx emission, all NOx must be converted into NO2. In practise, the emission of NO and NOx is measured in ppm. The found values must be added up and the sum must be converted into mg/normal m3 NO2 by the use of the conversion factor for NO2.
— The NOx emission must be kept under 150mg/Nm3 (reference state: 5 % 02, 0 degrees Celsius, 101.3 kPa, dry gas under all operational conditions,
— The ammonia emission must be kept under 12mg/Nm3 (reference state: 5 % 02, 0 degrees Celsius, 101.3 kPa, dry gas under all operational conditions.
The following is included in the supply:
— The existing ammonia storage must be used (24 % dissolution, (NH3) in connection with the installation of the plant,
— Pipe routing, pumps and electrical installation as regards connection to existing ammonia storage,
— Assembly and installation in the time frame (May 2012, June 2012, July 2012),
— Commissioning in the time frame (August 2012). Must be able to comply with emission requirements as of 1.9.2012,
— Scaffolding, insulation in connection with assembly and installation,
— Commissioning,
— Documentation Electronic + 2 x hard copy,
— Operational description (maintenance manuals) electronic + 2 x hard copy,
— C&I concept for control system (Siemens T-3000),
— Third party control and verification of emissions in connection with commissioning,
— KKS numbering of drawings, components, pipe routing and cables.
Deadline
Fristen for modtagelse af bud var på 2011-10-31.
Indkøbet blev offentliggjort på 2011-10-06.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Udbudsbekendtgørelse (2011-10-06) Objekt Omfanget af udbuddet
Titel: Maskiner og apparater til filtrering eller rensning af gasser
Mængde eller omfang:
“Please refer to II.I.5.” Bekendtgørelsens metadata
Originalsprog: engelsk 🗣️
Dokumenttype: Udbudsbekendtgørelse
Kontraktens art: Varer
Forordning: Den Europæiske Union, med deltagelse af GPA-lande
Fælles glossar for offentlige kontrakter (CPV)
Kode: Maskiner og apparater til filtrering eller rensning af gasser📦
Procedure
Procedureform: Udbud efter forhandling
Bud-type: Indsendelse gældende for alle delaftaler
Kriterier for tildeling
Det økonomisk mest fordelagtige bud
Ordregivende myndighed Identitet
Land: Danmark 🇩🇰
Type af ordregivende myndighed: Forsyningsvirksomhed
Navn på ordregivende myndighed: Horsens CHP Plant A/S. c/o DONG Energy Power A/S
Postadresse: Nesa Allé 1
Postnummer: 2820
Postby: Gentofte
Kontakt
Internetadresse: http://www.dongenergy.dk🌏
E-mail: jakfr@dongenergy.dk📧
Telefon: +45 99557396📞
“This notice is a call for pre-qualification. In order to be pre-qualified, it is important that all information requested under III.2) Conditions for...”
This notice is a call for pre-qualification. In order to be pre-qualified, it is important that all information requested under III.2) Conditions for participation, is included in the request.
Vis mere
Kilde: OJS 2011/S 195-318428 (2011-10-06)
Supplerende oplysninger (2011-10-14) Objekt Bekendtgørelsens metadata
Dokumenttype: Supplerende oplysninger