2017-06-15M-03b Condensate Pumps (DONG Energy Thermal Power A/S)
The lot comprises of supply of 5 condensate pumps for a 1:1 replacement of existing pumps. The lot includes necessary re-design, manufacturing, workshop assembly, tests in manufactures test facility and delivery at Site, including documentation.
The supply must comprise in its entirety all components and services within the supply limits, which are in detailed described in the Tender Documents, incl. the document “5.1 Purchasers Requirements”.
Se udbuddet »
2017-04-10Dilution refrigerator for quantum optomechanics (Danmarks Tekniske Universitet / Technical University of Denmark)
The cryostat shall consist of a cryogen-free dilution refrigeration system vertically suspended from a floor mounted vibration isolation frame. A hermetically sealed sample chamber with He-4 filling and pumping lines shall be mounted on the mixing chamber plate and optical access to the sample chamber shall be provided via both free space viewports and optical fibers. The cryostat must be integratable with an optical table. The total clear height required for the system including installation and …
Se udbuddet » Nævnte leverandører:BlueFors Cryogenics
2017-02-03Framework agreement for Gas Flow Meters (Energinet.dk)
The Contracting authority wants to purchase Gas Flow Meters for both Energinet.dk and Dansk Gas Distribution. The Contracting authority wishes to purchase gas flow meters on 2 lots with 1 supplier for each lot. The Framework agreement is divided into 2 lots.
For lot 2 the object of this framework agreement is to purchase the following type of meters: Diaphragm meters for Dansk Gas Distribution.
Se udbuddet » Nævnte leverandører:Elster-Instromet A/S
2016-12-20HØK — Renewal of CHP plant — Helsingør (Helsingør Kraftvarmeværk A/S)
Helsingør Kraftvarmeværk A/S is operating a gas-fired combined cycle plant at the site of Energivej 19 in
Helsingør. A decision has been made to renew the existing plant by establishing a biomass-fired boiler at the
site.
The existing turbine condensers (district heating) to the existing steam turbine (combined cycle) will be utilised
for the new steam turbine. Only one steam turbine will be in operation at a time. It will not be possible to run
combined cycle plant and bio boiler plant in parallel. The …
Se udbuddet » Nævnte leverandører:MAN Diesel and Turbo SE
2016-11-29Bygge- og anlægsopgaver i forbindelse med om,- og tilbygning af Roskilde Badet (Roskilde Kommune)
Byggeriet omfatter: Bygge- og anlægsopgaver i forbindelse med om,- og tilbygning af Roskildebadet. Den eksisterende svømmehal udbygges med nyt 50-meter bassin, wellnessområde, varmvandsbassin og aktivitetsbassin. Der udføres nyt kontor, samt ny indgang og foyer/cafe.
Eksisterende omklædningsrum udbygges og renoveres. Alle tilbygninger udføres i 1 etage, dog udføres 50-meter bassin i dobbelthøjde over vandarealet med taghat. Der udføres ny rambla til ny hovedtrappe, ved indgang til svømmehallen. …
Se udbuddet »
2016-11-14ASV8 Superheater (DONG Energy Thermal Power A/S)
The purpose of the project is to replace the electrical superheater belonging to the 98 MW steam boiler, which is backup for the steam supply from Asnaesvaerkets unit 2 and unit 5. The scope of the agreement is basically engineering, manufacturing and shipping of superheater and power modulation unit.
Se udbuddet »
2016-09-16Udbud af engineering, fremstilling, levering og idriftsætning af absorptionsvarmepumpe drevet af hedtvand (Fjernvarme Horsens A/S)
Fjernvarme Horsens opfører et nyt træflisfyret fjernvarmekedelanlæg på samlet 30 MW indfyret effekt. Projektet omfatter alt fra træflis-kedeltragt til skorstensindløb, dvs. hedtvandskedel, miljøanlæg samt el og SRO (et komplet bio- og fjernvarmeanlæg).
Den udbudte leverance omfatter engineering, produktion, levering og idriftsættelse af en absorptionsvarmepumpe drevet af hedtvand, samt CE-mærkning og div. godkendelse heraf.
Se udbuddet »
2016-07-07Negotiated procedure of Wind Turbine Blade Testing for DTU Wind Energy (Danmarks Tekniske Universitet — DTU)
Technical University of Denmark (DTU) is establishing a completely new test facility for testing large structures with focus on wind turbine blades. For this new facility DTU is in need of advanced static and fatigue testing solutions for 15 and 45 m wind turbine blades. The total contract value is fixed at 13 000 000 DKK, VAT not included. The contract value is inclusive of customs, duties and all expenses on the part of the contractor. The contract value also comprises the Tenderers fixed price …
Se udbuddet » Nævnte leverandører:Moog Industrial Group
2016-06-23Konvertering af Lygten Varmecentral (HOFOR A/S)
Som en del af dampkonverteringen, skal Lygten Varmeværk (LVV) ombygges til at kunne levere fjernvarmevand i stedet for damp. Dampkonvertering kræver, at der senest 1.12.2017 kan leveres 99 MW fjernvarmevand fra LVV, hvoraf de 50 MW kan leveres fra en eksisterende dampkedel via en damp/vand veksler og at alle 99 MW fjernvarmevand senest ultimo 2018 kan leveres fra nye kedler. De 3 eksisterende spids- og reservelastkedler på LVV er over 47 år gamle og står dermed overfor at skulle skrottes indenfor de …
Se udbuddet » Nævnte leverandører:Varmodan A/S
2016-04-28Bygge- og anlægsopgaver i forbindelse med om,- og tilbygning af Roskilde Badet (Roskilde Kommune)
Byggeriet omfatter: Bygge- og anlægsopgaver i forbindelse med om,- og
tilbygning af Roskildebadet. Den eksisterende svømmehal udbygges med nyt
50-meter bassin, wellnessområde, varmvandsbassin og aktivitetsbassin. Der
udføres nye kontor og mødefaciliteter, samt ny indgang og foyer/cafe.
Eksisterende omklædningsrum udbygges og totalrenoveres. Alle tilbygninger
udføres i 1 etage, dog udføres 50-meter bassin i dobbelthøjde over vandarealet
med taghat. Der udføres ny rambla til ny hovedtrappe, ved indgang …
Se udbuddet »
2016-03-18HCV Peak Load Boiler Plant — M-05 Valves (DONG Energy Thermal Power A/S)
DONG Energy is planning to increase the district heating peak load capacity in Copenhagen.
At H.C. Ørstedværket (HCV) 50-100 MJ/s new gas-fired hot water boiler capacity will be installed together with a new 200 MJ/s steam-water heat exchanger.
In addition, a new concept for operation of the CTR-pump station at HCV will be incorporated.
Finally, at Svanemølleværket new electrical hot water boiler of total 80 MJ/s capacity will be installed.
This Contract notice regards the design, testing and delivery of …
Se udbuddet » Nævnte leverandører:Grønbech & Sønner A/SPentair Valves & Controls Denmark A/S
2015-12-23MR station Artillerivej (Energinet.dk)
The Municipality of Copenhagen and CPH City & Port has decided to establish homes and offices in the former industrial area between HC Ørsted Power Plant and the harbor at Enghave Brygge. In this context, the natural gas transmission line from Amager to HC Ørstedsværket shall be redirected.
This contract notice concerns the project to plan, design and build a new MR station that can feed Energinet.dk‘s re-engineered gas pipeline. The new MR Station shall be delivered as a turnkey delivery.
The MR station …
Se udbuddet » Nævnte leverandører:Bohlen & Doyen GmbH
2015-12-22Leje af entreprenørmateriel (Fredensborg Kommune)
Udbuddet vedrører leje af entreprenørmateriel til Nordsjællands Park og Vej. Rammeaftalen omfatter lifte, gravemaskiner, læssemaskiner, beton- og jordflytningsdumpere, traktorer, mandskabsvogne, affugtere, fliseløftere, småmaskiner m.v.
Procedure:
Ordregiver har valgt at gennemføre denne opgave digitalt igennem Mercell Danmark A/S.
For at deltage i opgaven kopieres dette link til din internet browser: http://permalink.mercell.com/55484661.aspx Her tilmelder du dig opgaven ved at trykke på ikonet foroven: …
Se udbuddet » Nævnte leverandører:Ramirent A/S
2015-12-21Rammeaftaler for brønde, pumper og styreskabe 2016-2020 (Stevns Spildevand A/S)
Udbuddet omfatter følgende tre delaftaler:
Delaftale 1: Rammeaftale på levering af brønde (uden pumpe)
Delaftale 2: Rammeaftale på levering og montering af pumper
Delaftale 3: Rammeaftale på levering af styreskabe
Rammeaftalerne udbydes som tre selvstændige delaftaler På hver delaftale (rammeaftale) vil der blive indgået rammeaftale med én leverandør (leverandøren kan være den samme på to eller alle delaftalerne). Bemærk: Virksomheder, der prævalificeres på flere delaftaler, vil i forbindelse med …
Se udbuddet »
2015-12-18HCV Peak load Boiler Plant M-01 Gasboilers (DONG Energy Thermal Power A/S)
Design, manufacturing, delivery, installation and commissioning of complete natural gas fired hot water boiler plant(s). Total capacity (output to district heating system): 50 MJ/s. The delivery includes:
1. Boiler(s);
2. Flue gas ducts from boiler(s) to existing chimney on top of the boiler building;
3. Modification of existing chimney;
4. Natural gas piping;
5. Internal district heating piping.
Se udbuddet »
2015-12-17Nyt biomassefyret varmeværk i Grenaa, Maskinentreprisen (Grenaa Varmeværk A.m.b.A)
Grenaa Varmeværk a.m.b.a. har besluttet at opføre en ny flisfyret fjernvarmecentral på Bredstrupvej i Grenaa. Udbuddet omfatter levering og udførelse af maskinanlæg, der i hovedtræk omfatter to ca. 15 MW kedelanlæg, inklusiv traverskran for flistransport, indfyringssystem, veksleranlæg, røggasrensning, skorsten, fjernvarmepumper, brovægt samt el- og SRO-anlæg.
Ud over denne maskinentreprise forventes der udbudt en samlet entreprise for bygge og anlægsarbejder og en entreprise for varmepumper. I …
Se udbuddet »
2015-12-10RSC Cure NL Lot 3 (DONG Energy Thermal Power A/S)
Cure DONG Energy REnescience B.V. has decided to establish a plant for a complete handling of unsorted household waste (Municipal Solid Waste — MSW).
DONG Energy Thermal Power A/S will be responsible for the execution of the project on behalf of Cure DONG Energy REnescience B.V.
The project, RSC Cure NL will be based on DONG Energy's REnescience Technology, which is a technology for treatment of unsorted household waste. The purpose of the process is sorting and refining the waste for utilization in the …
Se udbuddet »
2015-10-28Acquisition of 4 trailer mounted diesel driven cooling carts for F-16 aircrafts (Danish Defence Acquisition and Logistic Organization)
Due to deployment of the Royal Danish Air Force F-16 aircrafts to warm climatic zones (for example A1) the Danish Defence Acquisition and Logistics Organization (hereafter ‘DALO’) wishes to procure four cooling carts with sufficient cooling capacity to sustain F-16 operations under these climatic conditions.
The cooling carts shall consist of a cooling system mounted on a 4-wheeled trailer.
The cooling carts shall be driven by a diesel cycle combustion engine. This engine shall — during deployment – be …
Se udbuddet » Nævnte leverandører:ITW GSE — Military
2015-10-08HØK — Renewal of CHP plant — Helsingør (Helsingør Kraftvarmeværk A/S)
The existing natural gas fired combined cycle unit was built in 1993 and has an electricity output of 60 MW and district heating output of 60 MW. The configuration is a single shaft arrangement with a gas turbine with HRSG, a steam turbine and 1 generator in common for the gas turbine and steam turbine.
The combined cycle unit shall be modified in order to use the existing steam turbine and generator without operating the gas turbine, i.e. by steam supply to the steam turbine from the new bio-mass …
Se udbuddet »
2015-08-05Silkeborg Varme A/S, Nye Produktionanlæg — Røggaskondenseringsanlæg (Silkeborg Varme A/S)
Silkeborg Varme A/S skal etablere røggaskondensering på det eksisterende 110 MW gasfyrede kraftvarmeværk med det formål at øge varmeproduktionen med ca. 30 MJ/s. Kontrakten vil blive baseret på et funktionsudbud med et leveringsomfang, der omfatter levering af følgende udstyr og systemer: røggaseconomisere, røggaskondenseringskedler, system til afledning af kondensat, absorptionsvarmepumper, hedtvandsystem til forsyning af varmepumper, gasfyret hedtvandskedel og diverse rørsystemer.
Se udbuddet » Nævnte leverandører:Midroc Automation AB
2015-08-04Maintenance and service for electric-driven MOPICO compressors with associated equipment (Energinet.dk)
Energinet.dk hereby invites interested applicants to apply for prequalification for a three-year framework agreement concerning maintenance and service for the four separate MAN Turbo, MOPICO RM40 electric-driven compressor units installed at the Energinet.dk compressor station in Egtved, Denmark. The compressor units are installed with separate MAN M33 drives as well as associated equipment from sub-suppliers.
Se udbuddet » Nævnte leverandører:MAN Diesel & Turbo Schweiz AG
2015-07-23Ny Pumpestation Kløvermarksvej — Ventilleverance (HOFOR A/S)
Der skal i København etableres en ny pumpestation for pumpning af spildevand fra Kløvermarksvej på Amager til Renseanlæg Lynetten. Pumpestationen skal pumpe urenset spildevand (ingen fraktioner er fjernet), og den maksimale kapacitet vil være 8,5 m/sec ved et modtryk på ca. 28 meters vandsøjle.
Se udbuddet »
2015-07-02Brønderslev Varme — Biomass fired CHP plant — Mechanical utillity (Brønderslev Varme A/S)
The biomass-fired CHP plant must include design, supply, installation and commissioning of a complete biomass-fired CHP plant having a thermal power output of approximately 20 MW power (including flue gas condensation). The plant must be able to treat and burn wood chips with a moisture content from 30 % to 55 %. The plant must produce both electricity and heat. The system is established with ORC and exhaust gas condensing. The contract covers the total mechanical installation including cranes, batching …
Se udbuddet » Nævnte leverandører:Euro Therm A/S
2015-05-22Rammeaftale 50.95 Sygeplejeartikler (Statens og Kommunernes Indkøbs Service A/S)
SKI forventer at udbyde en rammeaftale om levering af sygeplejeartikler. Rammeaftalen vil være en forpligtende rammeaftale, som vil blive udbudt på vegne af de SKI kunder, der forud for udbuddet bindende forpligter sig til at anvende rammeaftalen. Rammeaftalen retter sig mod SKI's kommunale kunder, men øvrige kunder kan tilslutte sig aftalen. Når udbudsmaterialet offentliggøres, vil det heraf fremgå, hvilke kunder, der har forpligtet sig til at anvende rammeaftalen samt omfanget af forpligtelsen. SKI …
Se udbuddet »
2015-05-05Framework agreement for compressors for injection of upgraded biogas into DONG Gas Distributions A/S' natural gas... (Dong Gas Distribution A/S)
DONG Energy Sales & Distribution A/S' intends to install a number of compressors for injection of upgraded biogas into DONG Gas Distributions A/S' natural gas grid in Denmark.
The compressor package under the agreement will have different requirements to capacity range as well as pressure range.
Basically the package shall cover the capacity range from 150 Nm3/h to 10.000 Nm3/h, with an inlet pressure of 2.0 - 10.0 barg and an outlet pressure of 19 - 40 barg.
It is op to the manufacturer to decide the …
Se udbuddet »
2015-05-05Rammeaftale vedrørende anskaffelse af påhængsmotorer (Forsvarsministeriets Materiel- og Indkøbsstyrelse)
Forsvaret udbyder en rammeaftale på anskaffelse af påhængsmotorer. Påhængsmotorerne skal anvendes på forsvarets motorgummibåde og Rigid Inflatable boat (RIB), hvor disse monteres både som single og twin montering.
Da forsvarets motorgummibåde og RIB anvendes både som arbejdsfartøj og mand over bord båd skal de fleste påhængsmotorer leveres i henhold til SOLAS MED direktiv, rat mærkede.
Udbuddet omfatter levering af påhængsmotorer fra 9,9 hk til 100 hk samt levering af reservedele til brugervedligeholdelse.
Se udbuddet » Nævnte leverandører:Pro-Safe A/S
2015-04-14HØK — Biomass-fired CHP plant — Helsingør — Electromechanical equipment (Helsingør Kraftvarmeværk A/S)
Helsingør Kraftvarmeværk A/S (HØK A/S) is planning a renewal of Helsingør CHP (HØK), establishing a biomass-fired boiler which produces steam to the already existing steam turbine. The fuel is expected to be primary wood chips, but other sustainable biomass resources may also be used. The existing CHP plant will still be able to operate and act as back-up for the new plant as long as appropriate.
The total estimate for the Works is approximately 520 000 000 DKK.
Helsingør Kraftvarmeværk A/S is owned by …
Se udbuddet »
2015-04-01Lot M4: Steam turbine, Generator and District Heating Systems (HOFOR Energiproduktion A/S)
Lot M4: Steam turbine, Generator and District Heating Systems.
A full functional unit for Steam turbine, Generator and District Heating Systems.
Scope of Supply includes:
— Backpressure non reheat steam turbine (estimated steam data 560C / 140 bar / approx. 190 kg/s and approx. output 150 MWe/400MWth) as well as auxiliaries (lube oil, control fluid and vibration monitoring, etc.)
— Synchronous generator and auxiliary systems (CT/VT, generator busbars, protection, excitation system and synchronization, …
Se udbuddet » Nævnte leverandører:Doosan Skoda Power s.r.o.
2015-04-01Lot M3: Boiler and auxiliary systems (HOFOR Energiproduktion A/S)
Lot M3: Boiler and auxiliary and systems.
The Works includes design, engineering, documentation, fabrication, transportation, construction and commissioning of a complete functional bio-mass fired CFB-boiler plant with nominal fuel input of 500 MW inclusive boiler building and auxiliary and service systems. Fuel is clean woodchips.
Boiler.
Boiler including installations for fuel feeding, deNOx, feed water pumps, ash handling and high pressure piping for steam and feed water.
Auxiliary systems.
Low …
Se udbuddet » Nævnte leverandører:Valmet Technologies Oy
2015-03-25Ny Pumpestation Kløvermarksvej — Pumpeleverance (HOFOR A/S)
Der skal i København etableres en ny pumpestation for pumpning af spildevand fra Kløvermarksvej på Amager til Renseanlæg Lynetten. Pumpestationen skal pumpe urenset spildevand (ingen fraktioner er fjernet), og den maksimale kapacitet skal være 8,5 m³/sec ved et modtryk på ca. 28 meters vandsøjle. Kapaciteten skal fordeles på 8 pumper, som skal opstilles horisontalt i tør pumpekælder.
Se udbuddet » Nævnte leverandører:Hidrostal A/S
2015-03-17Opførelse af ny Regional Sterilcentral Herlev på Herlev Hospital. Storentreprise: E05, Dampcentral (Herlev Hospital)
Opførelse af ny sterilcentral på ca. 12 400 etagemeter fordelt på 5 niveau hvoraf de 2 nederste er kældre. Arealer og funktionerne er følgende:
Niv. 1: ca. 30 m²: Forbindelse af ingeniørgang under Servicebygningens udvidelse med RSH. Niv. 2: ca. 3 160 m²: Kølecentraler, transformere, sterildepot, der strækker sig over niv. 2 og 3, vogntømning og bufferområde for vogne. Niv. 3: ca. 2 870 m²: Autoklaver, sterildepot, grovvarelager, vognvaskeanlæg, kontorer og div. fællesfunktioner. Niv. 4: ca. 3 160 m²: …
Se udbuddet »
2015-03-12Regional Sterilcentral og Godsterminal - Rigshospitalet. Stor-entreprise E01, E02, E03, E04 og E05 (Rigshospitalet)
Den Regionale Sterilcentral og Godsterminal skal opføres på Rigshospitalets nordlige hjørne, afgrænset af Edel Sauntes Allé, Frederik V's Vej og Henrik Harpestrengs Vej. På byggefeltet opføres nyt parkerings hus, RKB_P-hus, under anden entreprise. Efter endt færdiggørelse af P-huset, opføres den ny bygning der er omfattet af nærværende kontrakt og indeholder sterilcentral og godsterminal. Bygningen sammenbygges med P-huset via fælles fundamenter og fælles væg langs bygningens nordøstlige …
Se udbuddet »