Indkøb: Maskiner til produktion og udnyttelse af mekanisk energi (side 6)

2013-02-26   F2-07-00 - DNU - Forsyningsanlæg for trykluft og vakuum (genudbud) (Region Midtjylland, Det Nye Universitetshospital, Projektafdelingen)
Nærværende kontrakt omfatter etablering af forsyningsanlæg for: medicinsk trykluft, medicinsk vakuum, anæstesi-afkast, laboratorieteknisk trykluft og laboratorieteknisk vakuum. Forsyningsanlæggene etableres som fire centraler, der er placeret i hvert deres udbudsområde, S1, S3, N2 og N5, og udgør det samlede forsyningsanlæg for DNU. Anlæggene leveres successivt i takt med udførelsen af de fire udbudsområder. Forsyningsanlæg for medicinsk trykluft består af 4x2 kompressorer på ca. 90 l/s. Forsyningsanlæg … Se udbuddet »
2013-02-22   Framework agreement for compressors for injection of upgraded biogas into DONG Gas Distributions A/S' natural gas... (Dong Gas Distribution A/S)
DONG Gas Distribution A/S' intends to install a number of compressors for injection of upgraded biogas into DONG Gas Distributions A/S' natural gas grid in Denmark. The compressor packages will have different requirements to capacity range as well as pressure range. Basically the units shall cover the capacity range from 150 Nm3/h to 3500 Nm3/h, with an inlet pressure of 2.0 - 6.5 barg and an outlet pressure of 19 - 40 barg. The compressor units shall be delivered as packaged units delivered in a … Se udbuddet »
Nævnte leverandører: Neuman & Esser GmbH & Co. KG
2012-12-19   LOT M1: Continuous Ship Unloader (CSU) for wood pellets; LOT M2: Transport and silo discharge equipment for wood... (Vattenfall A/S)
The purchase will be divided into four (4) different lots as described in the following. These may either be ordered as four (4) separate contracts or be freely combined into common contracts. LOT M1: Continuous Ship Unloader (CSU) for wood pellets. Supply of one Continuous Ship Unloader (CSU) for wood pellets at Amager Power Station located in the city of Copenhagen. The supply includes engineering, purchase, manufacturing, installation, commissioning, testing and documentation of one Continuous Ship … Se udbuddet »
2012-12-19   Fuel feeders for Avedøre Power Plant unit 1 (DONG Energy Thermal Power A/S)
Four gravimetric fuel feeders and four bunker shut-off gate valves for Avedøre Power Plant unit 1. The fuel feeders must be able to handle coal and biomass. The capacity of each fuel feeder must be designed for approximately 40 ton/h (both for coal and biomass). The installation is expected to take place second half 2013. Se udbuddet »
Nævnte leverandører: Tekfa A/S
2012-11-28   Gas Compressor Stations for Upgraded Biogas (HMN Naturgas I/S)
Complete compressor stations for upgraded biogas mounted in containers for plug-in installation, including swichboard and remote operation. Two standard sizes are foreseen, 600 and 1200 cubic meters per hour, respectively. Inlet pressure 5 bar(g), outlet pressure 45 bar(g). Oil free compressors with frequency regulation and gas cooling included. Se udbuddet »
Nævnte leverandører: Fornovo Gas Srl
2012-11-05   Contract concerning the purchase af Plasma-Enhanced Chemical Vapor Desposition (Aarhus Universitet)
Aarhus University (the Contracting Authority) is purchasing a Plasma-Enhanced Chemical Vapor Deposition. The 3 chamber cluster tool is required for the production of state of art quality semiconductor (silicon and its different alloys) thin films especially amorphous and microcrystalline silicon thin films for solar cell research and applications. Se udbuddet »
Nævnte leverandører: Polyteknik A/S
2012-10-31   Kapacitetsudvidelse af spids- og reservelastkedel (Gauerslund Fjernvarme a.m.b.a)
Formålet med projektet er at udvide Gauerslund Fjernvarmes standbykapacitet. Tre eksisterende gasoliekedler på i alt 9,5 MW erstattes med en ny gasoliekedel på ca 15 MW til spidslast. Skorstenen ønskes bibeholdt. Se udbuddet »
2012-10-05   F2-07-00 - DNU - Forsyningsanlæg for trykluft og vakuum (Region Midtjylland, Det Nye Universitetshospital, Projektafdelingen)
Nærværende kontrakt omfatter etablering af forsyningsanlæg for: medicinsk trykluft, medicinsk vakuum, anæstesi-afkast, laboratorieteknisk trykluft og laboratorieteknisk vakuum. Forsyningsanlæggene etableres som fire centraler, der er placeret i hvert deres udbudsområde, S1, S3, N2 og N5, og udgør det samlede forsyningsanlæg for DNU. Anlæggene leveres successivt i takt med udførelsen af de fire udbudsområder. Forsyningsanlæg for medicinsk trykluft består af 4x2 kompressorer på ca. 90 l/s. Forsyningsanlæg … Se udbuddet »
2012-10-05   F2-06-00 - DNU - Køle- /varmeproduktionsanlæg (Region Midtjylland, Det Nye Universitetshospital, Projektafdelingen)
Nærværende kontrakt omhandler levering og etablering af et køle- og varmeproduktionsanlæg i forbindelse med byggeriet af Det Nye Universitetshospital DNU i Århus. Arbejdet består i hovedtræk i etablering af: — Komplet kølecentral med varmepumper, køleeffekt ca. 5 MW, 1 500 m3 akkumuleringstank og frikølere, — El og SRO til maskinanlæg, — 4 stk. hovedfordelingstavler á 1.250 A til teknikbygning, — Ventilation af teknikrum. Bygnings- og anlægsarbejder er ikke indeholdt i entreprisen. Baggrunden for … Se udbuddet »
2012-09-09   Rammeaftale (Esbjerg Forsyning A/S)
Nærværende udbud omfatter leverance af PE-vandrør med tilhørende komponenter for renovering, reparation af eksisterende ledningsnet samt nyanlæg af hoved- og stikledninger i Esbjerg kommune. Se udbuddet »
Nævnte leverandører: AO Vaga Teknik A/S Ulefos NV A/S
2012-08-31   Flue gas cooler for a biomass co-firing plant for wood pellets (Vattenfall A/S)
The supply includes a flue gas cooler including ducts to be installed at an existing coal fired power plant located at Nordjyllandsværket in the city of Aalborg. The flue gas cooler will be established as a part of a biomass co-firing project. The supply includes process design and mechanical design incl. CFD calculations, manufacturing, supply, installation, testing and commissioning. The flue gas cooler shall have a thermal capacity of 25 MW and shall be connected to the existing flue gas ducts in … Se udbuddet »
2012-08-30   HEV steam turbine and generator major overhaul (DONG Energy Thermal Power A/S)
The 89 MW BBC single cylinder steam turbine was commissioned in 1982. It operates at a live steam pressure of 115 bar at 525°C. The steam flow is 120 kg/s. It’s at back pressure turbine supplying district heating to the city of Herning. The generator is an air/water cooled BBC type wx18L-083LLT of 111 MVA/50Hz. Se udbuddet »
2012-08-21   Nørre Uttrup Varmecentral (NUV), B. Kedelleverance (Aalborg Forsyning Service A/S, Indkøbsaftalefunktionen)
Dette udbud er en del af et samlet projekt der omfatter etablering af en reservevarmecentral på Teglværket 12, 9400 Nørresundby. Centralen betegnes af Aalborg Forsyning, Varme,som "Nørre Uttrup Varmecental (NUV)". Bygningsentreprisen er allerede udbudt og bygningen hvori kedlerne skal opstilles er under opførelse på nuværende tidspunkt. Dette nærværende udbud omfatter: Levering, montering, idriftssættelse og aflevering af 3 stk. varmtvandskedler, effekt ca. 25 MW pr. kedel, med brændere incl. … Se udbuddet »
2012-07-04   Overhaul of train engines (LINT 41) - Supply contracts (Lokalbanen A/S)
The Contracting Authority is planning a successive overhaul of the engines of 25 train sets, each containing 2 engines, over the duration of approximately 24 months beginning in November 2012. Each successive overhaul shall be completed in three weeks. Accordingly, please note that it will be a contractual requirement that deliveries take place successively as each train set is disassembled. A time plan will appear from the tender documents. The Contracting Authority will itself perform disassembly and … Se udbuddet »
Nævnte leverandører: EVZ Transmission A/S, CVR no. 27155987
2012-06-12   Replacement of HP-Bypass Valves, Avedøre power plant unit 1 (Avedøreværket)
Replacement of HP-Bypass Valves, Avedøre power plant unit 1. — Design and manufacturing of 2 ea. Safety valves including control station, valves, measurements and all other needed accessories for regulation of the HP-Bypass system, — Design data steam: Flow 1003 m3/h, Temperature 170 °C, Pressure 314 baro, Setting press safety valve 275 bar, — Dimension of safety valves: Inlet (ODxID) 280 x 140 mm, Outlet (ODxID) Approx. 376 x 295 mm. Se udbuddet »
2012-05-24   Central Egelund - Halmkedelcentral (Aabenraa Fjernvarme a.m.b.a.)
Totalentreprise for projektering, levering og opførelse af en komplet 36 MW (3x12MW) halmfyret kedelcentral for hedtvand, inkl. ca. 5 300 m2 bygninger og div. hjælpeanlæg samt forsyningsanlæg. Træpiller skal indarbejdes som supplerende brændselskilde. Se udbuddet »
Nævnte leverandører: Weiss A/S
2012-05-23   Modification of burners for a biomass co-firing plant for wood pellets (Vattenfall A/S)
The supply includes modification of existing coal fired burners for a biomass co-firing plant for wood pellets located at Nordjyllandsværket in the city of Aalborg. The supply includes design, manufacturing, supply, installation, testing and commissioning of modifications of four existing coal dust burners at the unit 3 at Nordjyllandsværket in the city of Aalborg. The unit 3 is an 845 MW thermal super critical coal dust fired boiler with sixteen burners where four burners shall be modified to be able to … Se udbuddet »
2012-05-23   Modification of coal mill and dosing bin for a biomass co-firing plant for wood pellets (Vattenfall A/S)
The supply includes a dosing bin and modification of an existing coal mill for milling wood pellets for a biomass co-firing plant located at Nordjyllandsværket in the city of Aalborg. Se udbuddet »
2012-05-21   Bundbeluftningssystem til Viby Renseanlæg (Aarhus Vand A/S)
Arbejdet omfatter nedenstående arbejder og leverancer som beskrevet: 1) Projektering, levering, montage og indkøring af turbokompressorer/kapselblæsere/skruekompressorer, luftforsyningsledninger, reguleringsventiler, diffusorbatterier til tre beluftningstanke med en samlet iltningskapacitet på min. 330 kg O2/h. Se udbuddet »
Nævnte leverandører: Watergroup A/S
2012-05-21   Bundbeluftningssystem Åby Renseanlæg (Aarhus Vand A/S)
Arbejdet omfatter nedenstående arbejder og leverancer som nærmere beskrevet i det følgende: Delaftale 1: Projektering, levering, montage og indkøring af min 2 stk. beluftningsmaskiner (turbokompressorer/kapselblæsere/skruekompressorer) med en samlet kapacitet på ca. 8 000-9 000 Nm3/h, inkl. lyddæmpning og kølingsystem. Delaftale 2: Projektering, levering, montage og indkøring af luftforsyningsledninger, reguleringsventiler, diffusorbatterier til fire beluftningstanke med en samlet iltningskapacitet på … Se udbuddet »
Nævnte leverandører: Xylem Water Solutions Denmark Aps
2012-04-27   Urban Mediaspace Aarhus - udbud 2012 - E5.14 Sluse- og pumpeentreprisen (Aarhus Kommune)
Urban Mediaspace Aarhus er en del af omdannelsen af Aarhus inderhavn fra industrihavn til byrum. Projektet realiseres af Aarhus Kommune i samarbejde med Realdania og Realdania Byg. Aarhus Kommune er bygherre for projektet. Projektet omfatter: ANMARK— Multimediehuset indeholdende Hovedbibliotek, Borgerservice og udlejningsarealer. — Et fuldautomatisk p-anlæg med ca. 1000 pladser, der etableres under Multimediehuset, — Nye havnepladser, — Frilægning af den sidste del af Aarhus Å, — Omlægning af trafikken … Se udbuddet »
Nævnte leverandører: Sulzer Pumps Wastewater Denmark A/S
2012-04-27   Nyt biogasmotoranlæg til Viby renseanlæg (Aarhus Vand A/S)
Arbejdet omfatter nedenstående arbejder og leverancer som nærmere beskrevet i det følgende: 1. Projektering, levering, montering og indkøring af 1 stk. ny komplet biogasmotor kraftvarme anlæg (250 KW el-effekt) inklusive gasbooster, generator, høj temperatorveksler, nødkølevandssystem, automatiske oliepåfyldnings- og spildoliesystem samt røggassystemer samt kabler og kontroltavler mv. 2. Projektering, levering, montering og indkøring af 1 stk. ny gasfyr varme anlæg (600 KW) inklusive kølevands- og … Se udbuddet »
Nævnte leverandører: Averhoff Energi Anlæg A/S
2012-03-28   Multi Purpose Light Rescue Vehicles, mobile pump, generator and water vacuum equipment and mobile dam and self... (Copenhagen Fire Brigade)
Lot 1: Multipurpose Light Rescue Vehicles. Generel concept. The Multipurpose Light Rescue Vehicle concept consists of a fleet of standard vehicles with a common basic configuration and with a number of self contained mission specific equipment “modules” which can be loaded and unloaded the vehicle cargo compartment. The vehicle will perform a wide range of missions in the city of Copenhagen, among other fire preventing activities such as advising, education and training of company and institution … Se udbuddet »
2012-03-27   Purchase of apparatus and instruments etc (Aarhus University)
The Contracting Authority wants to consolidate all purchases of apparatus and instruments as well as laboratory furniture and related consumables, including software, after-sales services and service agreements in a number of framework agreements. These agreements will substitute the agreements that the Contracting Authority currently holds with a number of suppliers based on two tenders, with a total of 25 lots, conducted and awarded in 2010. Furthermore the Contracting Authority will in this tender … Se udbuddet »
2012-03-14   Supply, installation and commissioning of natural gas conversion and superheater reduction at H.C. Ørstedværket... (DONG Energy Power A/S)
DONG Energy Power A/S has 2 identical light fuel oil fired boilers at H.C. Ørstedværket in Copenhagen. The to boilers of make Mehldau & Steinfath Feuerungstechnik GmbH are operated as peak load supply of steam for the district heating grid in the city of Copenhagen. The 2 boilers are designated HCV21 and HCV22. The heat input max. per boiler on oil mode is 112 MW. The heat input max. per boiler on gas mode is 107 MW. The project is divided in two separate projects/lots: Lot 1: modification of the fuel … Se udbuddet »
2012-03-01   Urban Mediaspace Aarhus - udbud 2012 - E5.14 Sluse- og pumpeentreprisen (Aarhus Kommune)
Urban Mediaspace Aarhus er en del af omdannelsen af Aarhus inderhavn fra industrihavn til byrum. Projektet realiseres af Aarhus Kommune i samarbejde med Realdania og Realdania Byg. Aarhus Kommune er bygherre for projektet. Projektet omfatter: — Multimediehuset indeholdende Hovedbibliotek, Borgerservice og udlejningsarealer. — Et fuldautomatisk p-anlæg med ca. 1 000 pladser, der etableres under Multimediehuset. — Nye havnepladser. — Frilægning af den sidste del af Aarhus Å. — Omlægning af trafikken … Se udbuddet »
2012-02-16   Central Marstrup (Haderslev Fjernvarme a.m.b.a.)
Totalentreprise for projektering, levering, montering og idriftsættelse af en komplet 20 MW flis-fyret kedelcentral (2 linjer a´ 10 MW) inkl. ca. 1 925 m2 bygninger og div. hjælpeanlæg. Se udbuddet »
2012-02-14   Purchase and supply of new pumps for raw wastewater for Vallensbæk and Ejby pumping station, Spildevandscenter... (Spildevandscenter Avedøre I/S)
The contract includes purchase and delivery of pumps for raw wastewater for two existing pumping stations in Denmark. Ejby pumping station: Delivery of 5 pumps for raw wastewater, submersible, centrifugal pumps, horizontal installation for dry well service: — 2 pumps, each with flow 440 l/s at a total pressure loss up to 17.5 total head, — 3 pumps, each with flow 830 l/s at a total pressure loss up to 17.6 total head. All pumps are supplied with frames and suitable for frequency converter. For Vallensbæk … Se udbuddet »
2011-12-07   Hjørring Varmeforsyning - Multibrændselsanlæg - Maskinentreprise (Hjørring Varmeforsyning)
Multibrændselsanlægget omfatter projektering, levering, montering og opstart af et komplet multibrændselsanlæg, med en ydelse på 25 MW (inkl. røggaskondenseringen), til varmeproduktion baseret på forskellige typer brændsel (f.eks. savsmuld, træpiller, pileflis, flisede trærødder, skovflis, m.m.). Brændslerne vil kunne variere i vandindhold fra 10 – 70 %. Multibrændselsanlægget skal udføres med blandeanlæg, således at brændslet der tilføres kedel vil ligge på 30 – 55 %. Kedelanlægget skal udformes som et … Se udbuddet »
Nævnte leverandører: Weiss A/S
2011-12-02   Hot Section exchange / refurbishment of LM6000 PD gas turbines at 25 000 h in Silkeborg, Denmark (Silkeborg Kraftvarmeværk, SKVV)
A complete hot section exchange / refurbishment of LM6000 PD gas turbines at 25 000 h meeting the latest standards and versions of components - covering current SB's, SL's and PB's applicable. Lot A: Gas turbine unit 2 in 2012. Lot B: Gas turbine unit 1 in 2013. Se udbuddet »
2011-11-10   Modernization of "Ljungström" Air Preheater sealing system for Studstrup 400 MW power station (DONG Energy Power A/S)
Renovation and modernization of mechanical sealing system at existing Air Preheater. The flue gas air preheater at Studstrup is made as a regenerative Ljungstrom sector-divided type. The new sealing system shall cope with the thermal expansion of the rotor system. The supply includes actuators. Se udbuddet »
2011-11-10   Hjørring Varmeforsyning - Multibrændselsanlæg - Maskinentreprise (Hjørring Varmeforsyning)
Multibrændselsanlægget omfatter projektering, levering, montering og opstart af et komplet multibrændselsanlæg, med en ydelse på 25 MW (inkl. røggaskondenseringen), til varmeproduktion baseret på forskellige typer brændsel (f.eks. savsmuld, træpiller, pileflis, flisede trærødder, skovflis, m.m.). Brændslerne vil kunne variere i vandindhold fra 10 – 70 %. Multibrændselsanlægget skal udføres med blandeanlæg, således at brændslet der tilføres kedel vil ligge på 30 – 55 %. Kedelanlægget skal udformes som et … Se udbuddet »
2011-11-03   Etablering af nye gaskedler, Central Niels Juelsvej (Frederikshavn Varme A/S)
Formålet med nærværende projekt er at erstatte 4 stk. gamle gaskedler med 2 stk. 15 MW gaskedler. De gamle gaskedler bibeholdes som reserve. De nye gaskedler med tilhørende udstyr skal installeres i en eksisterende hal, der er placeret i forlængelse af den eksisterende kedelbygning. Hallen har tidligere rummet et forbrændingsanlæg med 2 stk. ovnlinjer. Kontrakten vil omfatte detailprojektering for det komplette kedelanlæg og rørarbejder. Levering og montage af kedelanlæg med tilhørende hjælpeudstyr, samt … Se udbuddet »
Nævnte leverandører: Tjæreborg Industri A/S
2011-10-28   Levering af præisolerede ventiler til AffaldVarme Aarhus (Aarhus Kommune Teknik og Miljø)
Præisolerede fuldsvejste kuglehaner fastmonteret i lukket brønd fra DN32 til DN300 (herunder specialventiler til Twinrør) samt præisolerede enkeltsrørsventiler fra DN100 til DN450. Alle til fjernvarme. Se udbuddet »
Nævnte leverandører: SAV Danmark A/S
2011-10-27   Supply, installation and commissioning of water soot blowers at Avedøreværket Power Station (AVV) unit 2 (DONG Energy Power A/S)
Supply, installation and commissioning of water soot blowers at Avedøreværket Power Station(AVV) unit 2, including water pump station, piping and functional description of control. Se udbuddet »
Nævnte leverandører: Burmeister & Wain Energy A/S
2011-09-28   Modification of existing coal dust burners (Vattenfall A/S)
The supply includes design, manufacturing, supply, installation, testing and commissioning of modification of existing coal dust burners in one burner row for burning wood dust in an existing coal fired plant located at Nordjyllandsværket in the city of Aalborg. The supply limits are the existing coal dust fired boiler including supply systems for coal, oil and combustion air, and connection to a new wood dust dosing system, The scope of supply includes an option to modify existing coal dust burners in … Se udbuddet »
2011-09-28   Wood dust doing plant (Vattenfall A/S)
The supply includes design, manufacturing, supply, installation, testing and commissioning of an indirect co-firing system for wood dust for an existing biomass co-firing plant located at Nordjyllandsværket in the city of Aalborg. The supply includes a wood dust storage silo, compressor, and dosing equipment for wood dust to be co-fired into existing coal dust fired boiler. The supply ends when the dosing equipment is attached to the existing coal dust fired boiler. The scope of supply includes an option … Se udbuddet »
2011-09-26   Supply and commissioning of main cooling water pumps for DONG Energy Power Studstrup 400 MW Power Station (DONG Energy Power A/S)
This prequalification notice concerns the design, manufacturing, delivery, installation and commissioning of 2 main cooling water pumps as replacement of the existing 2 pumps at Studstrup 400 MW sea water cooled power station. Pump capacity is 2 x 26 280 m³/h. Se udbuddet »
2011-09-26   Replacement and commissioning of Avedøreværket(AVV) unit 1, Bottom Ash Drag Conveyer (Avedøreværket)
Replacement and commissioning of AVV unit 1, Bottom Ash Drag Conveyer. — removal of the old conveyer, — delivery of a complete bottom ash conveyer with the function as water seal, — delivery of a complete hydraulic system, — erection and commissioning. Size of opening in conveyer: L x W approx. 15.0 x 1.0 m. Se udbuddet »
2011-09-23   Total or partial replacement and commissioning of high temperature pressure parts of the two parts boiler of... (DONG Energy Power A/S)
This prequalification notice concerns supply of Superheater, reheater, primary and secondary boxes. The supply includes dismantling of existing heaters, engineering, pre-manufacturing, erection and commissioning. All materials are included in the supply. Se udbuddet »
2011-09-23   Replacement and commissioning of high pressure steam piping for studstrup 400 MW power station (DONG Energy Power A/S)
This prequalification notice concerns complete or partly replacement and commissioning of high pressure steam piping between boiler and turbine consisting of live steam system (LBA) and hot reheat system (LBB). Se udbuddet »
2011-09-20   Major overhaul of Avedøreværket(AVV) unit 1 steam turbine section MP2 and LP (Avedøreværket)
Major overhaul of AVV unit 1 steam turbine section MP2 and LP. Unit 1 was commissioned in 1990 and is a 262 MW BBC turbine with a steam pressure of 240 bar and steam temperature of 540 C running at 3000 RPM. It consist of a high pressure section, two medium pressure sections and a low pressure section. The work concerns the second medium pressure (IP2) section and the low pressure section (LP), both of which are with dual outlet with asymmetrical outlet pressures. The condenser pressure after the … Se udbuddet »
Nævnte leverandører: Turbocare Sp.zo.o
2011-08-12   Major overhaul of VHP turbine at DONG Energy Skærbæk 400 MW power station (DONG Energy Power A/S)
This contract notice concerns the major overhaul of the VHP (very high pressure) turbine at DONG Energy Skæbæk 400 MW Power Station. The turbine is from GEC Alsthom, put into operation in 1997 and is reaching 80 000 operating hours. Se udbuddet »
2011-06-17   Produkter til behandling af sår med negativt tryk - NPWT (Negative Pressure Wound Therapy) (Region Hovedstaden, Koncernøkonomi, Indkøb)
Produkter til behandling af sår med negativt tryk (NPWT) til Region Hovedstadens hospitaler. Kontrakten indbefatter køb af diverse bandagesæt, inkl. tilbehør. Hvorimod pumperne til behandlingen stilles til rådighed uden beregning. Delaftale 1: Bandagesæt (gaze og svamp), inkl. stationær og mobil pumpe til behandling af alle typer sår, dog med undtagelse af åben abdomen. Delaftale 2: Bandagesæt, inkl. pumpe til behandling af åben abdomen. Se udbuddet »
Nævnte leverandører: Smith & Nephew A/S
2011-06-01   Tunnelering i Helsinge (Gribvand Spildevand A/S)
Kontrakten omfatter udførelse af ca. 1 100 m ø 2 500 tunnel i ca. 10-15 m's dybde, boret tilløbsskakt ø 1 600 mm, indløbsbygværk og pumpestation samt mindre afløbsledninger. Se udbuddet »
Nævnte leverandører: Smet-Tunnelling N.V.
2011-05-27   Rammeaftale 04.50 - Forbrugsartikler med forpligtende tilslutning (Statens og Kommunernes Indkøbs Service A/S)
Rammeaftalen omfatter 2 delaftaler med forpligtende tilslutning. Delaftale 1: Aftørringspapir, engangsservice og fødevareemballage. Delaftale 2: Rengøringsrekvisitter og kemi. Der vælges én leverandør pr. delaftale. Se udbuddet »
2011-05-25   Prækvalifikation - Levering og installation af pumpeinstallationer og strømdannere i forbindelse med udbygning af... (Ringkøbing-Skjern Forsyning A/S)
Ringkøbing-Skjern Spildevand har som en del af sin fremtidige spildevandsstruktur besluttet at nedlægge Skjern Renseanlæg og i stedet centralisere spildevandsrensningen på Tarm Renseanlæg, som derfor skal udvides fra 13 000 til 26 000 person ekvivalenter. Nærværende kontrakt omfatter levering og installering af diverse pumpeinstallationer og strømdannere/røreværker: — tørtopstillede indløbspumper, — tørtopstillede returslampumper, — recirkulationspumper (horisontale propellerpumper), — … Se udbuddet »
2011-05-17   Mechanical and electrical technology supplies for a new combined heat and power producing waste incineration line in... (I/S Nordforbrænding)
Mechanical and electrical works for a new combined heat and power producing waste incineration line with a capacity of 10 tonnes waste per hour, with one common turbine/generator system. The waste incineration line is based on a moving grate concept, steam boiler with SNCR, followed by semi-dry flue gas treatment, including electrical system, control and monitoring system and all necessary auxiliary systems. The works are divided in 3 lots: Lot A: one waste incineration unit including incinerator based … Se udbuddet »
2011-02-07   Central Egelund (Aabenraa-Rødekro Fjernvarme a.m.b.a.)
Totalentreprise for projektering, levering og montering af komplet 30 MW flisfyret- og 15 MW oliefyret kedelcentral inkl. ca. 3 500 m2 bygninger og inkl. diverse hjælpeanlæg og en akkumuleringstank. Der er tale om såvel hedtvandsanlæg som traditionelt fjernvarmeanlæg, 3 stk. forsyningssystemer i alt. Se udbuddet »