Leverandør: EVZ Transmission A/S, CVR no. 27155987
2 arkiverede indkøb
EVZ Transmission A/S, CVR no. 27155987 har historisk set været en leverandør af transportudstyr og transporthjælpemidler, lokomotiver og motorvogne samt rullende materiel og tilhørende dele og dele til lokomotiver, vogne eller andet rullende materiel til jernbaner eller sporveje; udstyr til jernbanetrafikregulering.
Nylige indkøb, hvor leverandøren EVZ Transmission A/S, CVR no. 27155987 er nævnt
2012-07-04
Overhaul of train engines (LINT 41) - Supply contracts (Lokalbanen A/S)
The Contracting Authority is planning a successive overhaul of the engines of 25 train sets, each containing 2 engines, over the duration of approximately 24 months beginning in November 2012. Each successive overhaul shall be completed in three weeks. Accordingly, please note that it will be a contractual requirement that deliveries take place successively as each train set is disassembled. A time plan will appear from the tender documents. The Contracting Authority will itself perform disassembly and … Se udbuddet »
The Contracting Authority is planning a successive overhaul of the engines of 25 train sets, each containing 2 engines, over the duration of approximately 24 months beginning in November 2012. Each successive overhaul shall be completed in three weeks. Accordingly, please note that it will be a contractual requirement that deliveries take place successively as each train set is disassembled. A time plan will appear from the tender documents. The Contracting Authority will itself perform disassembly and … Se udbuddet »
2012-07-04
Overhaul of train engines (LINT 41) - service contracts (Lokalbanen A/S)
The Contracting Authority is planning a successive overhaul of the engines of 25 LINT 41 train sets, each containing 2 engines, over the duration of approximately 24 months beginning in November 2012. Each successive overhaul shall be completed in three weeks. Accordingly, please note that it will be a contractual requirement that deliveries take place successively as each train set is disassembled. A time plan will appear from the tender documents. Reference is also made to Section III.1.4 of this … Se udbuddet »
The Contracting Authority is planning a successive overhaul of the engines of 25 LINT 41 train sets, each containing 2 engines, over the duration of approximately 24 months beginning in November 2012. Each successive overhaul shall be completed in three weeks. Accordingly, please note that it will be a contractual requirement that deliveries take place successively as each train set is disassembled. A time plan will appear from the tender documents. Reference is also made to Section III.1.4 of this … Se udbuddet »