Indkøb: Maskiner til produktion og udnyttelse af mekanisk energi (side 5)

2015-02-27   Acquisition of four trailer mounted diesel driven cooling carts for F-16 aircrafts (Danish Defence Acquisition and Logistics Organization)
Due to deployment of the Royal Danish Air Force F-16 aircrafts to warm regions, the Danish Defence Acquisition and Logistics Organization (hereafter ‘DALO’) wishes to procure four cooling carts with sufficient cooling capacity to sustain F-16 operations under these climatic conditions. The cooling carts shall consist of a cooling system mounted on a four-wheeled trailer. The cooling carts shall be driven by a diesel cycle combustion engine. This engine shall — during deployment — be able to run on … Se udbuddet »
Nævnte leverandører: ITW GSE — Military
2015-02-16   Tender of High-force 2.5 MN servo-hydreaulic testing machine (Danmarks Tekniske Universitet — DTU)
A state-of the art high-force capacity servo-hydraulic 2.5 MN fatigue rated component testing machine with hydraulic grips for flexible use and operation. The total contract value is fixed at 5 851 000 DKK, VAT not included. The contract value is inclusive of customs, duties, and all expenses on the part of the contractor. The contract value also comprises the Tenderers fixed price products and services (el-ements/product types/equipment/services) until the High-force 2.5 MN servo-hydreaulic testing … Se udbuddet »
Nævnte leverandører: MTS Systems Norden AB
2015-02-02   Biomassefyret Kraftvarmeværk i Lisbjerg S02 — Emissionsmåleudstyr (AffaldVarme Aarhus, Teknik og Miljø, Aarhus Kommune)
Entreprisen omfatter: — emissionsmåleudstyr — emissionsmålehus med køling. Kontrakten omfatter; projektering, indkøb, transport, montage, idriftssættelse, dokumentation mm. Se udbuddet »
Nævnte leverandører: DGtek A/S
2015-01-30   Compressed Air Plant (I/S Nordforbrænding, New Waste-to-Energy Line)
Pre-qualification for Suppliers of Compressed Air Plants. The Tender Material will be sent later only for Pre-qualified Suppliers. This notice concerns a compressed air plant producing service and instrument air for existing incineration line 4, existing district heating boiler plant and the new waste-fired incineration line 5. Se udbuddet »
2015-01-26   Prækvalifikation — Levering og montering af nøglefærdigt biogaskraftvarme- og biomassevarmeværk inklusive bygninger... (Lemvig Varmeværk a.m.b.a.)
Annoncen vedrører prækvalifikation til afgivelse af tilbud på et komplet biogasfyret kraftvarmeværk og et kompletfyret biomassefyret varmeværk inklusive bygninger og anlæg i en totalentreprise. Totalentreprisen indeholder en 8,0 MW (indfyret) fliskedel inklusive røgvaskeranlæg og en varmepumpe, et biogas motor-/generatoranlæg med en elektrisk effekt på 3,0 MW inklusive røggassystem og en varmepumpe, to stålskorstene på hver 60 meter og en varmeakkumuleringstank på ca. 5 000 m³ nyttevolumen, samt brovægt, … Se udbuddet »
Nævnte leverandører: Euro Therm A/S
2014-12-22   PE-trykrør, kloakrør, ventiler, fittings og andre varekøb til vandforsyning og spildevandsrensning (Forsyning Helsingør)
Rammeaftaler om levering af PE-trykrør, kloakrør, ventiler og fittings m.v. til Vandforsyningen og Spildevandsafdelingen i Forsyning Helsingør. Udbuddet omfatter fire delaftaler. Tilbudsgiver kan afgive tilbud på én eller flere delaftaler. Delaftale 1 — PE-trykrør Delaftale 2 — Ventiler, ventiltilbehør og el-fittings Delaftale 3 — Koblinger og fittings Delaftale 4 — Kloakrør og fittings til spildevandsrensning. Se udbuddet »
2014-12-10   Biomassefyret Kraftvarmeværk i Lisbjerg S02 — Emissionsmåleudstyr (AffaldVarme Aarhus, Teknik og Miljø, Aarhus Kommune)
Entreprisen omfatter: — emissionsmåleudstyr — emissionsmålehus med køling — system til brug for automatisk miljørapportering. Kontrakten omfatter; projektering, indkøb, transport, montage, idriftssættelse, dokumentation mm. Se udbuddet »
2014-12-02   2: CBY Rørentreprise (Frederiksberg Fjernkøling A/S)
Nærværende udbud omfatter indkøb og montage af røranlæg for kølevand og glycol/vand som skal forbinde chillere, tørkølere, pumper, frikølsveksler i køleanlæg, som tidligere har været genstand for udbud. Røranlægget skal leveres med ventiler og isolering. Det bemærkes, at udbuddet gennemføres som et sideordnet udbud, hvor Tilbudsgiver både skal give tilbud på levering af følgende 3 løsninger: i) kølevandsanlæg og tørkøleanlæg i sort stål ii) kølevandsanlæg i rustfrit stål og tørkøleanlæg i sort stål … Se udbuddet »
Nævnte leverandører: Eurocon Rør og Svejs Aps
2014-11-27   Biomassefyret Kraftvarmeværk i Lisbjerg M05.1 Røggaskanaler og kerner i skorsten (AffaldVarme Aarhus, Teknik og Miljø, Aarhus Kommune)
Entreprisen omfatter: — 3 nye røggaskanaler (GRP komposit) fra facaden af den eksisterende røggasrensningsbygning til den nye skorsten ca. Ø 1 500-Ø 2 000. — 4 nye røggaskanaler (GRP komposit) skal installeres i ny skorsten ca. Ø 1 500-Ø 2 000, ca. 4 x 70 m. — Aptering af skorsten med lejdere, platforme, lys, dræn mv. Se udbuddet »
Nævnte leverandører: ScanComposit
2014-11-27   Pumpeudbud for Stillinge og Bildsø Strand (SK Spildevand A/S)
Levering af spildevandspumpestationer med dykkede pumper inkl. ventilbrønde. Se udbuddet »
Nævnte leverandører: Grundfos DK A/S
2014-11-14   M-01 Mill-, Burner- and PA-systems (DONG Energy Thermal Power A/S)
The scope of work is related to DONG Energy's conversion of Avedøre Power Station, unit 1, from coal firing to 100 % wood pellets operation, while maintaining the present option of using coal. The present tender covers modification of mill and burner system, primary air system and installation of water soot blower. The modification of the mill and burner systems includes: — Modification of existing coal mills, including installation of explosion suppression system. — Necessary modifications to existing … Se udbuddet »
Nævnte leverandører: MH Power Systems Europe GmbH
2014-10-31   Levering af præisolerede ventiler til fjernvarme (TN10) (Indkøbsafdelingen Teknik og Miljø, Aarhus Kommune)
Udbuddet vedrører levering af præisolerede kuglehaner som enkeltrørsventiler og twin-ventiler til Aarhus Kommune, Teknik og Miljø, AffaldVarme for perioden 1.2.2015-31.1.2017. Aftalen kan forlænges med et år ad gangen, i alt 4 år. Udbuddet omfatter: Deludbud 1: Præisolerede ventiler til fjernvarme for twinrørsystemer. Deludbud 2: Præisolerede ventiler til fjernvarme for enkeltrørssystemer. Se udbuddet »
Nævnte leverandører: Broen A/S Logstor A/S
2014-09-17   Levering, installation, idriftsættelse og validering af 1 stk. rendampsgenerator til Region Hovedstadens Apotek (Region Hovedstaden)
Udbuddet vedr. levering, opstilling, installation, samt tilslutning af forsyninger og rendampsdistribution, idriftsættelse og kvalificering af komplet rendampsgenerator med tilhørende afgasser, der vil indgå som del af Apotekets produktionsudstyr til fremstilling af EU GMP godkendte lægemidler. Udbuddet omfatter også option på tilsvarende 1 styk udstyr, som indgår i evalueringen med 100 % vægt. Optioner kan udnyttes i 2 år fra kontraktindgåelse af alle Ordregivers Hospitaler. Detaljer fremgår af … Se udbuddet »
Nævnte leverandører: BWT Pharma & Biotech
2014-07-10   Delivery of absorption heat pump (Dalum Kraftvarme A/S)
The tender comprises the delivery of an absorption heat pump to Dalum Kraftvarme in order to increase energy recovery from an existing flue gas condensation system and to recover energy from turbine cooling for the production of heat to the district heating system of the town of Odense. The contractor is to deliver a single effect steam driven absorption heat pump with an evaporator effect of 3.3 MW, including transportation, lifting of the heat pump into its final position inside the boiler house at … Se udbuddet »
2014-07-08   Contract for Major Overhaul of Steam Turbine (Vordingborg Kraftvarme A/S)
The tender covers the conclusion of a contract for a major overhaul of an ABB V25 (10 MW) steam turbine for Vordingborg Kraftvarme A / S. The turbine has passed 200,000 EOH and underwent the last major overhaul at 100,000 EOH. The main overhaul is part of the maintenance of the steam turbine and includes the following deliveries: 1. Cleaning of all components of the turbine, including reducers, valves and servos and inspection of all these components 2. Delivery and replacement of known lifetime expired … Se udbuddet »
Nævnte leverandører: Alstom Danmark A/S
2014-06-04   Prequalification for Compressor Units for Injection of Upgraded Biogas into the Danish Natural Gas Transmission Network (Energinet.dk)
The Danish state owned gas transmission company Energinet.dk is going to receive upgraded biogas from a number of new biogas plants in Denmark during the coming years. The upgraded biogas will either come directly from the biogas plants at a pressure of 4-10 bar or from the natural gas distribution system at a pressure of 19 to 40 bar. The injection pressure is 80 bar. The flow rates will be in the range from 500 to 6 000 Nm³/h. In order to meet this demand Energinet.dk wishes to enter a non-exclusive … Se udbuddet »
2014-05-20   Kontrakt om turbinerevision (Vordingborg Kraftvarme A/S)
Udbuddet omfatter indgåelse af en kontrakt vedrørende en hovedrevision (Major Overhaul) af en ABB V25 (10 MW) dampturbine for Vordingborg Kraftvarme A/S. Hovedrevisionen inkluderer følgende opgaver: 1. Turbine hovedrevision, inklusive reduktionsgear, ventiler og server; 2. Levering af nye reservedele og renovering/reparation af eksisterende dele. For så vidt angår leverancerne nævnt under punkt 2 bemærkes, at disse ydelser aktualiseres i indhold og omfang alt efter hovedrevisionens resultat og det … Se udbuddet »
2014-05-20   Kløvermarken Pumpestation — levering af kugleventiler for fjernvarme (HOFOR A/S)
Levering af 20 stk. DN600 mm kugleventiler til en fjernvarmepumpestation. Se udbuddet »
2014-05-20   Kløvermarken Pumpestation — levering af pumper, motorer og frekvensomformere (HOFOR A/S)
Levering af 6 stk. vertikale inline pumper med el-motorer og frekvensomformere til en fjernvarme pumpestation. Se udbuddet »
2014-04-11   EU-udbud af rammeaftale på lænsepumper (Beredskabsstyrelsen)
Beredskabsstyrelsen udbyder rammeaftaler på levering af mobile lænsepumper for det samlede danske redningsberedskab. Udbudsbetingelserne angiver de nærmere vilkår og retningslinjer herfor. Rammeaftalen er ikke eksklusiv og indeholder ikke vilkår om årligt minimumsaftag for beredskabsstyrelsen eller aftalens rekvirenter. Ved kontraktstart forpligter Beredskabsstyrelsen sig til et forpligtende volumen på indkøb af: — 6 stk. høj-ydelsespumper og — 8 stk. mellem-ydelsespumper til den tilbudte pris i … Se udbuddet »
Nævnte leverandører: Xylem Water Solutions Denmark Aps
2014-04-09   Indkøb af NPWT-udstyr og forbrugsvarer til sygehusene i Region Syddanmark (Region Syddanmark)
Indkøb af NPWT-udstyr og forbrugsvarer til undertryksbehandling af sår til patienterne i Region Syddanmarks sygehuse. Indkøbet omfatter udlån af NPWT-pumper, køb af forbrugsvarer dertil, samt uddannelse af personale. Se udbuddet »
Nævnte leverandører: KCI Medical ApS
2014-03-19   Naturgas Fyn Distribution A/S (Naturgas Fyn Distribution A/S)
The tender is for 1 compressorstation. The station has the purpose to compress upgraded biogas from 4 or 7 bar(g) gas network to a 18 bar(g) network if the consumption of gas in a connected 4 or 7 bar(g) network is less than the production of biogas. Se udbuddet »
2014-03-13   Udskiftning af biogasmotor og tilbehør (Vejle Spildevand A/S)
Udskiftning af biogasmotor omfatter levering, montering og opstart af biogasmotor samt nødvendigt hjælpeudstyr. Biogasmotor med indfyret effekt på ca. 1,2 MW til elproduktion og varmeproduktion. Biogasmotor placeres i eksisterende bygning på samme sted som eksisterende biogasmotor. Biogasmotor leveres med tilhørende ny styring og elinstallationer. Biogasmotor og nødvendigt hjælpeudstyr skal tilsluttes eksisterende installationer i bygningen. Demontage og fjernelse af eksisterende biogasmotor og … Se udbuddet »
2014-02-21   Pumper til ny pumpestation Strandholm ved Rødbyhavn (Femern A/S)
Kontrakten omfatter levering og montering af propellerpumper til ny pumpestation Strandholm. Der skal leveres 3 stk. propellerpumper til vertikal opstilling hver med ydelse 670 l/s ved Hgeo fra 1,5 til 4,2 mVS. Pumper skal være med standard normmotor for tør montering og skal leveres komplet med delbart skaktrør og afgangsrør frem til kontraklap. Kontrakten forventes at omfatte en 5-årig garantiperiode fra ibrugtagning (der vil ske indenfor ca. 1 år efter levering). I garantiperioden skal leverandøren … Se udbuddet »
2014-01-23   Prequalification for Compressor Units for Injection of Upgraded Biogas into the Danish Natural Gas Transmission Network (Energinet.dk)
The Danish state owned gas transmission company Energinet.dk is going to receive upgraded biogas from a number of new biogas plants in Denmark during the coming years. The upgraded biogas will either come directly from the biogas plants at a pressure of 4-10 bar or from the natural gas distribution system at a pressure of 19 to 40 bar. The flow rates will be in the range from 500 to 6000 Nm³/h. In order to meet this demand Energinet.dk wishes to enter a non-exclusive frame agreement with two suppliers. … Se udbuddet »
2014-01-03   6 main pumps for transmission pipeline System, each with an electric power of 400-500 kW (Indkoebsafdelingen, Teknik og Miljoe, Aarhus Kommune)
Delivery of 6 main pumps for transmission pipeline system, each with an electric power of 400-500 kW and a capacity of 2 000 m³/h on each pump, head: 6 bar, PN 25 or PN16, (pressure class is not clarified yet), temperature class 40-125 °C Including frequency converters. 400 V and/or 690 V electrical engines, minimum class IE3. Se udbuddet »
Nævnte leverandører: Desmi Danmark A/S
2013-12-20   Biomass-fired CHP plant (Hillerød Forsyning)
The biomass-fired CHP plant must include design, supply, installation and commissioning of a complete biomass-fired CHP plant having a thermal power output of approximately 25 MW power (including exhaust gas condensation). The plant must be able to burn different types of biofuel (sawdust, wood pellets, willow chips, chips made from tree roots, wood chips, etc. in a varying mixing ratio). The moisture content of the fuels will thus vary from 10 % to 65 %, as the fuel to be supplied to the boiler will … Se udbuddet »
Nævnte leverandører: Polytechnik Luft- und Feuerungstechnik GmbH
2013-12-12   Biomassefyret Kraftvarmeværk i Lisbjerg, Steam turbine and generator plant (AffaldVarme Aarhus, Teknik og Miljø, Aarhus Kommune)
The Purchase includes a steam turbine and generator plant including auxiliary equipment, feedwater and condensate preaheaters, feedwatertank, districtictheat exchangers, bypass district heat exchanger and water treatment plant. Steam conditions will be 540 C/ 110 Bar. Capacity approx. 33 MWe. The Purchase includes design, manufacturing, supply, installation, testing and commissioning. Se udbuddet »
Nævnte leverandører: Doosan Skoda Power
2013-12-12   Biomassefyret Kraftvarmeværk i Lisbjerg, Boiler and Flue gas cleaning (AffaldVarme Aarhus, Teknik og Miljø, Aarhus Kommune)
The Purchase includes a strawfired steam boiler 540 C/110bar/approx 110MWth-input including auxilary equipment, feedwaterpumps, baghouse filter, flue gas condenser, condensate treatment, heat recovery and flue gas cleaning. The Purchase also includes buffersilos and dosing equipment for woodchips. The Purchase includes design, manufacturing, supply, installation, testing and commissioning. Se udbuddet »
Nævnte leverandører: Burmeister & Wain Energi A/S og STF
2013-12-10   Indkøb af NPWT-udstyr og forbrugsvarer til sygehusene i Region Syddanmark (Region Syddanmark)
Indkøb af NPWT-udstyr og forbrugsvarer til undertryksbehandling af sår til patienterne i Region Syddanmarks sygehuse. Indkøbet omfatter udlån af NPWT-pumper, køb af forbrugsvarer dertil, samt uddannelse af personale. Se udbuddet »
2013-11-28   SKV Wood Chip project - Bagfilters (DONG Energy Thermal Power A/S)
Introduction: Dong Energy Thermal Power is planning to implement district heating production based on biofuels through erection of a number of wood-chip boilers, providing steam for existing steam turbine and/or stand alone district heating condensor. Two to four boilers are envisaged as an add-on the existing gas fired plant, Skærbækverket. The new biomass fired boilers shall deliver up to 320 MW heat to the district heating system. It is envisaged that the new boiler plant shall have a capacity of … Se udbuddet »
Nævnte leverandører: Envirotherm GmbH
2013-10-30   Supply and installation of equipment for filling diving cylinders with oxygen and nitrox blends (Danish Defense Acquisition and Logistics Organization)
The overall goal is to make it possible for divers to fill their diving cylinders in a safe, easy and uncomplicated way. The scope of this procurement covers delivery of the necesary equipment for a oxygen and nitrox filling station for diving cylinders, dismounting existing equipment that cannot be reused, installation of the new equipment and performance of a test on site. DALO will dispose of any dismounted equipment which is not reused on site. It is desirable if the filling station is – or in the … Se udbuddet »
Nævnte leverandører: Aquatic Marine A/S
2013-10-10   Gram Fjernvarme – Sol 2 – El-kedel (Gram Fjernvarme)
Kontrakten omfatter levering og montering af en komplet 6-10 MW el-kedel i ny kedelbygning. Se udbuddet »
2013-10-04   SKV4 Wood Chips - Bypass heat exchanger (DONG Energy Thermal Power A/S)
Introduction: DONG Energy Thermal Power is planning to implement district heating production based on biofuels through erection of a number of wood-chip boilers, providing steam for existing steam turbine and/or stand alone district heating condenser. Two to four boilers are envisaged as an add-on to the existing gas fired plant, Skærbækværket. The new biomass fired boilers shall deliver up to 320 MW heat to the district heating system. It is envisaged that the new boiler plant shall have a capacity of … Se udbuddet »
Nævnte leverandører: Valmont SM A/S
2013-10-03   SKV Wood Chip project – Bagfilters (DONG Energy Thermal Power A/S)
Introduction Dong Energy Thermal Power is planning to implement district heating production based on biofuels through erection of a number of wood-chip boilers, providing steam for existing steam turbine and/or stand alone district heating condensor. Two to four boilers are envisaged as an add-on the existing gas fired plant, Skærbækverket. The new biomass fired boilers shall deliver up to 320 MW heat to the district heating system. It is envisaged that the new boiler plant shall have a capacity of … Se udbuddet »
2013-10-03   SKV Wood Chips – Flue Gas Condensing (DONG Energy Thermal Power A/S)
Introduction Dong Energy Thermal Power is planning to implement district heating production based on biofuels through erection of a number of wood-chip boilers, providing steam for existing steam turbine and/or stand alone district heating condensor. Two to four boilers are envisaged as an add-on the existing gas fired plant, Skærbækverket. The new biomass fired boilers shall deliver up to 320 MW heat to the district heating system. It is envisaged that the new boiler plant shall have a capacity of … Se udbuddet »
Nævnte leverandører: Rdscan AB
2013-09-19   Levering af fuldsvejste kugleventiler (Indkøbsafdelingen Teknik og Miljø, Aarhus Kommune)
Levering af uisolerede fuldsvejste kuglehaner fra DN10 til DN500 med forskellige tilslutningsmuligheder. Endvidere engangsventiler, anboringsventiler og div. flexbeslag. Alle til fjernvarme. Alle udført iht. EN 12516. Se udbuddet »
2013-09-13   SKV Wood Chip Boiler Package (DONG Energy Thermal Power A/S)
The power plant, Skærbækværket, owned by DONG Energy Thermal Power is a gas fired conventional unit with approximately 390 MW electrical power and 450 MW district heating. DONG Energy Thermal Power is planning to implement district heat production based on biofuels via the establishment of a number of wood-chip boilers, providing steam for existing steam turbine and/or stand-alone district heat exchanger. Two (2) to four (4) boilers are envisaged. Se udbuddet »
Nævnte leverandører: Babcock & wilcox Vølund
2013-09-12   F2-07-00 – DNU – Forsyningsanlæg for trykluft og vakuum (fornyet genudbud) (Region Midtjylland, Det Nye Universitetshospital, Projektafdelingen)
Nærværende kontrakt omfatter etablering af forsyningsanlæg for: medicinsk trykluft, medicinsk vakuum, anæstesi-afkast, laboratorieteknisk trykluft og laboratorieteknisk vakuum. Se udbuddet »
Nævnte leverandører: Granzow A/S
2013-09-10   SKV steam turbine major overhaul at Skaerbaek Power Plant (DONG Energy Thermal Power A/S)
The contract will cover at complete overhaul of the high pressure and (assymetric) intermediate pressure turbine cylinders, see below in Section II.2.1 re Scope of the Contract. The 416 MW GEC Alstom 5-cylinder steam turbine was commissioned in 1998 with approximately 100 000 operationg hours. It is a double re-heat system operating a live steam pressure of 290 bar and 580°C. The live steam flow is 270 kg/s. Se udbuddet »
2013-08-26   3: Rørentreprisen (Frederiksberg Fjernkøling A/S)
Nærværende udbud omfatter design, indkøb og montage af røranlæg for kølevand og glycol/vand som skal forbinde chillere, tørkølere, pumper, frikølsveksler i køleanlæg, som tidligere har været genstand for udbud. Røranlægget skal leveres med ventiler og isolering. Se udbuddet »
Nævnte leverandører: L&H Rørbyg A/S
2013-07-15   Vejen Varmeværk – Ny varmecentral med 10 MW halmkedel. Maskinstallation (Vejen Varmeværk)
Kontrakten omfatter maskin- og smedearbejder for en ny varmecentral, herunder levering af en komplet 10 MW halmkedel, røggasvekslere, rørinstallationer, komponenter og pumper. Se udbuddet »
Nævnte leverandører: Weiss A/S
2013-07-12   Prækvalifikation for etablering af Aabybro biomassekedelanlæg og bygning (Aabybro Fjernvarme Amba)
Aabybro Fjernvarme skal fornye og udvide deres biomasse kedelkapacitet og ønsker derfor, at etablerer et nyt 10 MW kedelanlæg til skovflis, samt en ny bygning til at huse kedelanlæg, brændselslager og ny administration for fjernvarme virksomheden. Entreprisen etableres på et nyudstykket grundareal i industriområdet og inkluderer foruden kedeanlæg og bygning også krananlæg til brændselslager, skorsten og akkumuleringstank, samt ny styring for fjernvarmeværket inkl. ny fjernvarme pumpestation. Byggeri og … Se udbuddet »
Nævnte leverandører: Steel Tank Weiss A/S
2013-07-07   Replacement and commissioning of super- and reheater parts of the boiler of Studstrup 400 MW Power station (DONG Energy Thermal Power A/S)
This prequalification notice concerns erection and commissioning of superheater, reheater, primary and secondary boxes. The works includes dismantling of existing heaters. All pressure parts material are supplied by others. Se udbuddet »
2013-07-05   Rammeaftale: Indkøb af pumper (Guldborgsund Spildevand A/S)
Guldborgsund Spildevand A/S (herefter betegnet »Ordregiver«) har et løbende behov for at indkøbe pumper til udskiftning af de eksisterende. For at sikre den løbende forsyning af pumper, udbyder Ordregiver herved en rammeaftale, som skal dække det forventede behov for pumper i de kommende 2 år. Rammeaftalen udbydes for en 2-årig periode med option på op til 2 års forlængelse. Ordregiver forventer over en 2-årig periode at skulle indkøbe 60-75 pumper i følgende størrelser: 0-2 KW 2-4 KW 4-6 KW 6-25 … Se udbuddet »
Nævnte leverandører: Grønbech & Sønner A/S
2013-06-30   Electrical boiler plant for district heating for Studstrup power station (DONG Energy Thermal Power A/S)
Design, manufacturing, delivery, installation and commissioning of 2 electrical hot water boilers. Effect: 2 x 40 MJ/s. Se udbuddet »
2013-05-24   Heating elements for gas-gas heaters (Ljungström type) at Avedøre Power Plant (DONG Energy Thermal Power A/S)
Heating elements for one air preheater (APH) and for one gas-gas heater (GGH) at Avedøre Power Plant unit 1. The scope includes dismantling of existing elements, delivery and installation etc. of the heating elements. The installation is expected to be done in May 2014. Se udbuddet »
Nævnte leverandører: Alstom Power Energy Recovery GmbH
2013-05-21   Separatkloakering af Strøby Egede: Etape 1 (Stevns Spildevand A/S)
Stevns Kommune har besluttet, at byområdet Strøby Egede skal separatkloakeres. Henset til de økonomiske og tidsmæssige rammer, som er til rådighed herfor, forventes Strøby Egede at skulle separatkloakeres over en periode på 8 år, idet den samlede separatkloakering er fordelt på 8 etaper (herefter betegnet "etaper(ne)"). På ovenstående baggrund gennemfører Stevns Spildevand A/S (herefter betegnet "bygherre") dette udbud. Bemærk: Dette udbud vedrører alene etape 1. De øvrige etaper forventes udbudt i … Se udbuddet »
Nævnte leverandører: Barslund A/S
2013-04-23   Procurement of turbinemaintanance (I/S Vestforbrænding)
I/S Vestforbrænding operate two separate steam turbines and generators. The steam turbines and generator shall be maintained in accordance to a fixed modus operando. Se udbuddet »
Nævnte leverandører: Allen Steam Turbines