The contract will cover at complete overhaul of the high pressure and (assymetric) intermediate pressure turbine cylinders, see below in Section II.2.1 re Scope of the Contract.
The 416 MW GEC Alstom 5-cylinder steam turbine was commissioned in 1998 with approximately 100 000 operationg hours. It is a double re-heat system operating a live steam pressure of 290 bar and 580°C. The live steam flow is 270 kg/s.
Deadline
Fristen for modtagelse af bud var på 2013-10-09.
Indkøbet blev offentliggjort på 2013-09-10.
Udbudsbekendtgørelse (2013-09-10) Objekt Omfanget af udbuddet
Titel: Turbineudstyr
Quantity or scope:
“The scope of the contract comprises a complete overhaul of the high pressure and (assymetric) intermediate pressure turbine cylinders, including inspection...”
Quantity or scope
The scope of the contract comprises a complete overhaul of the high pressure and (assymetric) intermediate pressure turbine cylinders, including inspection of turbine stationary and rotating parts, NDT, refurbishment of used components depending on findings, and supply of new components if required unless the parts are already i owners's stock.
Vis mere Bekendtgørelsens metadata
Originalsprog: engelsk 🗣️
Dokumenttype: Udbudsbekendtgørelse
Kontraktens art: Tjenesteydelser
Forordning: Den Europæiske Union, med deltagelse af GPA-lande
Fælles glossar for offentlige kontrakter (CPV)
Kode: Turbineudstyr📦
Procedure
Procedureform: Udbud efter forhandling
Bud-type: Indsendelse gældende for alle delaftaler
Kriterier for tildeling
Det økonomisk mest fordelagtige bud
Ordregivende myndighed Identitet
Land: Danmark 🇩🇰
Type af ordregivende myndighed: Forsyningsvirksomhed
Navn på ordregivende myndighed: Dong Energy Thermal Power A/S
Postadresse: Kraftværksvej 53
Postnummer: 7000
Postby: Fredericia
Kontakt
Internetadresse: http://www.dongenergy.dk🌏
E-mail: freab@dongenergy.dk📧
Telefon: +45 99556327📞