2023-10-19Re-submission of TENDER FOR ORGANIC RANKINE CYCLE (Energnist I/S)
Energnist I/S (The Contracting Authority) invites to tendering with negotiation for establishment
of an Organic Rankine Cycle (ORC) on Line 5 of the existing Waste-to-Energy facility in Kolding,
Denmark.
Tender is handled by Mercell Sourcing Services, use https://permalink.mercell.com/214654338.aspx
Se udbuddet »
2023-10-10TENDER FOR ORGANIC RANKINE CYCLE (AC Birk - Energnist I/S)
Energnist I/S (The Contracting Authority) invites to tendering with negotiation for establishment
of an Organic Rankine Cycle (ORC) on Line 5 of the existing Waste-to-Energy facility in Kolding,
Denmark.
Se udbuddet »
2023-02-22Re-tendering of Steam Turbine Major Overhaul (Sønderborg Kraftvarme A/S)
Sønderborg Kraftvarme A/S needs a major overhaul of the 5 MW combined high- and low-pressure stage steam turbine type NGS 40/40/80-3 & WK 40/45-3 and Renk-Tacke gearbox type TNA-630 delivered by Siemens AG in 1995 and commissioned by Siemens AG in 1996.
The generator unit of the steam turbine is not included in this tender.
Tender is handled by Mercell Sourcing Services, use https://permalink.mercell.com/197587539.aspx
Se udbuddet »
2023-01-24Steam Turbine Major Overhaul (Sønderborg Kraftvarme A/S)
Sønderborg Kraftvarme A/S needs a major overhaul of the 5 MW combined high- and low-pressure stage steam turbine type NGS 40/40/80-3 & WK 40/45-3 and Renk-Tacke gearbox type TNA-630 delivered by Siemens AG in 1995 and commissioned by Siemens AG in 1996.
The generator unit of the steam turbine is not included in this tender.
Tender is handled by Mercell Sourcing Services, use https://permalink.mercell.com/193063481.aspx
Se udbuddet »
2022-04-08Major overhaul of HP/IPO turbine (Nordjyllandsværket A/S)
This procurement procedure concerns the award of a Contract regarding the execution of a major overhaul of the 410 MW Alsthom GEC HP-IP0 steam turbine at Nordjyllandsværket uni 3 (NJV3) in 2023. The execution and the award of the Contract require Tenderers, who are able to complete a major overhaul of the turbine, including the following main Scope of Supply:
- Major overhaul of the HP-IP0 turbine
- Commissioning of the unit, including vibration measurements and verification tests, and
- Supply of new …
Se udbuddet » Nævnte leverandører:Fortum Sverige ABTGS Sweden AB
2022-03-07Framework Agreement on purchase and renovation of Gas Turbine Meters (Energinet Forretningsservice A/S)
Through the establishment of the present Framework Agreement Energinet wants to purchase new gas turbine meters and renovations for our biogas stations. For further information see Appendix 2: Scope of Works. The procurement is conducted as a negotiated procedure and the Framework Agreement will be entered with one provider for the duration of 8 years.
Se udbuddet »
2021-10-07BB2 - Steam Turbine Unit (Fjernvarme Fyn Produktion A/S)
Fjernvarme Fyn Produktion A/S is located in Odense, Denmark and has initiated a procurement procedure concerns the award of a contract for a new steam turbine unit.
The award of the contract requires Tenderers, who can be responsible for a complete project execution (including deliveries of components) for the new steam turbine unit, including the following main supplies
-Engineering, design and QA
-Delivery of a back pressure steam turbine designed for district heating
-Gear if needed
-Generator 10 …
Se udbuddet »
2020-05-20Major Overhaul of HP-IP0 Turbine (Nordjyllandsværket A/S)
This procurement procedure concerns the award of a contract regarding the execution of a major overhaul of the 410 MW Alsthom GEC HP-IP0 steam turbine at Nordjyllandsværket uni 3 (NJV3) in 2021. The execution and the award of the contract require tenderers, who are able to complete a major overhaul of the turbine, including the following main scope of supply:
— major overhaul of the HP-IP0 turbine,
— commissioning of the unit, including vibration measurements and verification tests, and
— supply of new …
Se udbuddet »
2020-04-03Major Overhaul of HP-IP0 Turbine (Nordjyllandsværket A/S)
This procurement procedure concerns the award of a contract regarding the execution of a major overhaul of the 410 MW Alsthom GEC HP-IP0 steam turbine at Nordjyllandsværket uni 3 (NJV3) in 2021. The execution and the award of the contract require tenderers, who are able to complete a major overhaul of the turbine, including the following main scope of supply:
— major overhaul of the HP-IP0 turbine;
— commissioning of the unit, including vibration measurements and verification tests; and
— supply of new …
Se udbuddet »
2019-05-07Major overhaul of HP - IP0 turbine (Nordjyllandsværket A/S)
This tender procedure concerns the award of a Contract regarding the execution of major overhaul of the Alsthom GEC HP-IP0 steam turbine at Nordjyllandsværket unit 3 (NJV3) in 2020. The execution and the award of the contract requires Tenderers who is able to complete a major overhaul of a GEC ALSTOM HP/IP0 turbine.
Scope:
— Major overhaul of the HP/IP0 turbine including inspection of crossover pipes,
— Commissioning of the unit including vibration measurements and verification tests,
— Refurbishment / …
Se udbuddet »
2017-06-15M-03b Condensate Pumps (DONG Energy Thermal Power A/S)
The lot comprises of supply of 5 condensate pumps for a 1:1 replacement of existing pumps. The lot includes necessary re-design, manufacturing, workshop assembly, tests in manufactures test facility and delivery at Site, including documentation.
The supply must comprise in its entirety all components and services within the supply limits, which are in detailed described in the Tender Documents, incl. the document “5.1 Purchasers Requirements”.
Se udbuddet »
2017-02-03Framework agreement for Gas Flow Meters (Energinet.dk)
The Contracting authority wants to purchase Gas Flow Meters for both Energinet.dk and Dansk Gas Distribution. The Contracting authority wishes to purchase gas flow meters on 2 lots with 1 supplier for each lot. The Framework agreement is divided into 2 lots.
For lot 2 the object of this framework agreement is to purchase the following type of meters: Diaphragm meters for Dansk Gas Distribution.
Se udbuddet » Nævnte leverandører:Elster-Instromet A/S
2016-12-20HØK — Renewal of CHP plant — Helsingør (Helsingør Kraftvarmeværk A/S)
Helsingør Kraftvarmeværk A/S is operating a gas-fired combined cycle plant at the site of Energivej 19 in
Helsingør. A decision has been made to renew the existing plant by establishing a biomass-fired boiler at the
site.
The existing turbine condensers (district heating) to the existing steam turbine (combined cycle) will be utilised
for the new steam turbine. Only one steam turbine will be in operation at a time. It will not be possible to run
combined cycle plant and bio boiler plant in parallel. The …
Se udbuddet » Nævnte leverandører:MAN Diesel and Turbo SE
2015-10-08HØK — Renewal of CHP plant — Helsingør (Helsingør Kraftvarmeværk A/S)
The existing natural gas fired combined cycle unit was built in 1993 and has an electricity output of 60 MW and district heating output of 60 MW. The configuration is a single shaft arrangement with a gas turbine with HRSG, a steam turbine and 1 generator in common for the gas turbine and steam turbine.
The combined cycle unit shall be modified in order to use the existing steam turbine and generator without operating the gas turbine, i.e. by steam supply to the steam turbine from the new bio-mass …
Se udbuddet »
2015-04-01Lot M4: Steam turbine, Generator and District Heating Systems (HOFOR Energiproduktion A/S)
Lot M4: Steam turbine, Generator and District Heating Systems.
A full functional unit for Steam turbine, Generator and District Heating Systems.
Scope of Supply includes:
— Backpressure non reheat steam turbine (estimated steam data 560C / 140 bar / approx. 190 kg/s and approx. output 150 MWe/400MWth) as well as auxiliaries (lube oil, control fluid and vibration monitoring, etc.)
— Synchronous generator and auxiliary systems (CT/VT, generator busbars, protection, excitation system and synchronization, …
Se udbuddet » Nævnte leverandører:Doosan Skoda Power s.r.o.
2014-05-20Kontrakt om turbinerevision (Vordingborg Kraftvarme A/S)
Udbuddet omfatter indgåelse af en kontrakt vedrørende en hovedrevision (Major Overhaul) af en ABB V25 (10 MW) dampturbine for Vordingborg Kraftvarme A/S.
Hovedrevisionen inkluderer følgende opgaver:
1. Turbine hovedrevision, inklusive reduktionsgear, ventiler og server;
2. Levering af nye reservedele og renovering/reparation af eksisterende dele.
For så vidt angår leverancerne nævnt under punkt 2 bemærkes, at disse ydelser aktualiseres i indhold og omfang alt efter hovedrevisionens resultat og det …
Se udbuddet »
2013-09-10SKV steam turbine major overhaul at Skaerbaek Power Plant (DONG Energy Thermal Power A/S)
The contract will cover at complete overhaul of the high pressure and (assymetric) intermediate pressure turbine cylinders, see below in Section II.2.1 re Scope of the Contract.
The 416 MW GEC Alstom 5-cylinder steam turbine was commissioned in 1998 with approximately 100 000 operationg hours. It is a double re-heat system operating a live steam pressure of 290 bar and 580°C. The live steam flow is 270 kg/s.
Se udbuddet »
2012-08-30HEV steam turbine and generator major overhaul (DONG Energy Thermal Power A/S)
The 89 MW BBC single cylinder steam turbine was commissioned in 1982. It operates at a live steam pressure of 115 bar at 525°C. The steam flow is 120 kg/s. It’s at back pressure turbine supplying district heating to the city of Herning. The generator is an air/water cooled BBC type wx18L-083LLT of 111 MVA/50Hz.
Se udbuddet »
2011-09-20Major overhaul of Avedøreværket(AVV) unit 1 steam turbine section MP2 and LP (Avedøreværket)
Major overhaul of AVV unit 1 steam turbine section MP2 and LP.
Unit 1 was commissioned in 1990 and is a 262 MW BBC turbine with a steam pressure of 240 bar and steam temperature of 540 C running at 3000 RPM. It consist of a high pressure section, two medium pressure sections and a low pressure section. The work concerns the second medium pressure (IP2) section and the low pressure section (LP), both of which are with dual outlet with asymmetrical outlet pressures. The condenser pressure after the …
Se udbuddet » Nævnte leverandører:Turbocare Sp.zo.o
2011-05-17Mechanical and electrical technology supplies for a new combined heat and power producing waste incineration line in... (I/S Nordforbrænding)
Mechanical and electrical works for a new combined heat and power producing waste incineration line with a capacity of 10 tonnes waste per hour, with one common turbine/generator system.
The waste incineration line is based on a moving grate concept, steam boiler with SNCR, followed by semi-dry flue gas treatment, including electrical system, control and monitoring system and all necessary auxiliary systems.
The works are divided in 3 lots:
Lot A: one waste incineration unit including incinerator based …
Se udbuddet »