Indkøb: Dele til elektriske motorer, generatorer og transformatorer
Et aktivt indkøb
Dele til elektriske motorer, generatorer og transformatorer er blevet indkøbt af organisationer som f.eks Danish Energy Agency, Banedanmark og Den kommunale selvstyrehavn Esbjerg Havn.
Historisk set har leverandørerne inden for dette område været ABB A/S, Alstom Danmark A/S, Bravida Danmark, Caverion Danmark A/S, Siemens A/S og Thor Wind Farm I/S.
- Elektriske maskiner, apparatur, udstyr og forbrugsartikler; belysning (2 nye indkøb)
- Elektriske motorer, generatorer og transformatorer (1)
- Dele til elektriske motorer, generatorer og transformatorer (1) ⬅️
De seneste indkøb af dele til elektriske motorer, generatorer og transformatorer i Danmark
2025-11-20
Deadline 2028-10-23
North Sea I, South, Offshore Wind Farm (Danish Energy Agency)
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the … Se udbuddet »
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the … Se udbuddet »
2025-11-19
North Sea I, Mid, Offshore Wind Farm (Danish Energy Agency)
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the … Se udbuddet »
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the … Se udbuddet »
2025-11-19
Hesselø Offshore Wind Farm (Danish Energy Agency)
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the … Se udbuddet »
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the … Se udbuddet »
2024-11-06
Udbud af totalentreprise vedrørende opførelse af Co2-terminal på Esbjerg Havn (Den kommunale selvstyrehavn Esbjerg Havn)
Den Kommunale Selvstyrehavn Esbjerg Havn har behov for opførelse af en CO2-terminal på Esbjerg Havn med henblik på understøttelse af den grønne omstilling og den dertilhørende transport af CO2. Byggeriet skal gennemføres med forventet opstart i februar 2025 og aflevering af en fuldt funktionsdygtig terminal med en tankkapacitet på minimum 2.000 m3 til Esbjerg Havn den 1. januar 2026. Totalentreprenøren er herefter forpligtet til at sikre at den fulde tankkapacitet er indføjet i terminalen senest den 1. … Se udbuddet »
Den Kommunale Selvstyrehavn Esbjerg Havn har behov for opførelse af en CO2-terminal på Esbjerg Havn med henblik på understøttelse af den grønne omstilling og den dertilhørende transport af CO2. Byggeriet skal gennemføres med forventet opstart i februar 2025 og aflevering af en fuldt funktionsdygtig terminal med en tankkapacitet på minimum 2.000 m3 til Esbjerg Havn den 1. januar 2026. Totalentreprenøren er herefter forpligtet til at sikre at den fulde tankkapacitet er indføjet i terminalen senest den 1. … Se udbuddet »
2024-04-22
Kriegers Flak II Offshore Wind Farm - Denmark (Danish Energy Agency)
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
2024-04-22
Hesselø Offshore Wind Farm - Denmark (Danish Energy Agency)
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
2024-04-22
Kattegat Offshore Wind Farm - Denmark (Danish Energy Agency)
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
2024-04-22
North Sea I, A1, Offshore Wind Farm - Denmark (Danish Energy Agency)
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
2024-04-22
North Sea I, A3, Offshore Wind Farm - Denmark (Danish Energy Agency)
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
2024-04-22
North Sea I, A2, Offshore Wind Farm - Denmark (Danish Energy Agency)
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional … Se udbuddet »
2023-12-14
2 x shunt reaktor spoler til Nord Energi Net A/S (Nord Energi Net A/S)
Ved nærværende udbud ønsker Ordregiver at indhente tilbud på 1 x 25 MVAr shunt reaktorspole og 1 x 20 MVAr shunt reaktorspoler.Kravene til den udbudte genstand er detaljeret beskrevet i kravspecifikationen, aftalebilag 1, mens Ordregivers krav til aftalens vilkår fremgår af det vedlagte udkast til samhandelsaftalen. Aftalen vil være gældende fra underskrift. Se udbuddet »
Ved nærværende udbud ønsker Ordregiver at indhente tilbud på 1 x 25 MVAr shunt reaktorspole og 1 x 20 MVAr shunt reaktorspoler.Kravene til den udbudte genstand er detaljeret beskrevet i kravspecifikationen, aftalebilag 1, mens Ordregivers krav til aftalens vilkår fremgår af det vedlagte udkast til samhandelsaftalen. Aftalen vil være gældende fra underskrift. Se udbuddet »
2023-11-24
OPFØRELSE AF CO2-TERMINAL SOM TOTALENTREPRISE (Den kommunale selvstyrehavn Esbjerg Havn)
Den Kommunale Selvstyrehavn Esbjerg Havn (herefter Esbjerg Havn) ønsker at opføre en CO2-terminal på Esbjerg Havn til modtagelse/udlevering af CO2 fra lastbiler og eventuelt jernbane i fremtiden, midlertidig opbevaring deraf samt efterfølgende overførsel til og fra skib via kaj samt omgivende terræn. Se udbuddet »
Den Kommunale Selvstyrehavn Esbjerg Havn (herefter Esbjerg Havn) ønsker at opføre en CO2-terminal på Esbjerg Havn til modtagelse/udlevering af CO2 fra lastbiler og eventuelt jernbane i fremtiden, midlertidig opbevaring deraf samt efterfølgende overførsel til og fra skib via kaj samt omgivende terræn. Se udbuddet »
2023-10-09
OPFØRELSE AF CO2-TERMINAL SOM TOTALENTREPRISE (Den kommunale selvstyrehavn Esbjerg Havn)
Den Kommunale Selvstyrehavn Esbjerg Havn (herefter Esbjerg Havn) ønsker at opføre en CO2-terminal på Esbjerg Havn til modtagelse/udlevering af CO2 fra lastbiler og eventuelt jernbane i fremtiden, midlertidig opbevaring deraf samt efterfølgende overførsel til og fra skib via kaj samt omgivende terræn. Se udbuddet »
Den Kommunale Selvstyrehavn Esbjerg Havn (herefter Esbjerg Havn) ønsker at opføre en CO2-terminal på Esbjerg Havn til modtagelse/udlevering af CO2 fra lastbiler og eventuelt jernbane i fremtiden, midlertidig opbevaring deraf samt efterfølgende overførsel til og fra skib via kaj samt omgivende terræn. Se udbuddet »
2023-03-31
Replacement of Generator and Gearbox (Nordværk I/S)
Nordværk I/S - an environmental waste handling facility - is in need of a replacement of a generator and gearbox of the unit 4 at the WTE plant at Nordværk, Aalborg, Denmark. The generator of 23,5 MVA is driven by a steam turbine. The delivery will include a turn-key delivery of a new generator and gear box and auxiliary equipment. The steam turbine is not to be replaced. Se udbuddet »
Nordværk I/S - an environmental waste handling facility - is in need of a replacement of a generator and gearbox of the unit 4 at the WTE plant at Nordværk, Aalborg, Denmark. The generator of 23,5 MVA is driven by a steam turbine. The delivery will include a turn-key delivery of a new generator and gear box and auxiliary equipment. The steam turbine is not to be replaced. Se udbuddet »
2020-09-22
Thor Offshore Wind Farm Tender (Energistyrelsen)
In 2018, all political parties in the Danish Parliament entered into an energy agreement to ensure the green transition and provide security for long term investments. As part of the agreement, the parties decided to establish three new large-scale offshore wind farms before 2030, which will expand the supply of energy from offshore wind by at least 2,400 MW. The first of the three wind farms to be tendered is Thor Offshore Wind Farm. Please see the elaborate description in section II.2.4) and the tender … Se udbuddet »
In 2018, all political parties in the Danish Parliament entered into an energy agreement to ensure the green transition and provide security for long term investments. As part of the agreement, the parties decided to establish three new large-scale offshore wind farms before 2030, which will expand the supply of energy from offshore wind by at least 2,400 MW. The first of the three wind farms to be tendered is Thor Offshore Wind Farm. Please see the elaborate description in section II.2.4) and the tender … Se udbuddet »
2020-09-11
Udbud af ydelser til værkstedsvedligehold (DSB)
Formålet med dette udbud er at etablere en rammeaftale på facility management ydelser, samlet betegnet FM-VV, del 1. Rammeaftalen omfatter teknisk vedligehold af bygninger og anlæg indenfor områderne el-ydelser til værksteder, el-ydelser til forsyningsvægge, servicering og indkøb af servicetekniske ydelser f.s.v.a.trucks, løftegrej foruden servicering og indkøb af servicetekniske ydelser kraner og anhugningsgrej. Aftalen indeholder desuden udførelse af projekter herunder også materialer og … Se udbuddet »
Formålet med dette udbud er at etablere en rammeaftale på facility management ydelser, samlet betegnet FM-VV, del 1. Rammeaftalen omfatter teknisk vedligehold af bygninger og anlæg indenfor områderne el-ydelser til værksteder, el-ydelser til forsyningsvægge, servicering og indkøb af servicetekniske ydelser f.s.v.a.trucks, løftegrej foruden servicering og indkøb af servicetekniske ydelser kraner og anhugningsgrej. Aftalen indeholder desuden udførelse af projekter herunder også materialer og … Se udbuddet »
2019-09-30
Vedligehold forsyning kørestrøm (Banedanmark)
Vedligehold af banetrafoer, forsyning, koblere og forsyningsstationer på fjernbanen. Se udbuddet »
Vedligehold af banetrafoer, forsyning, koblere og forsyningsstationer på fjernbanen. Se udbuddet »
2019-06-26
Vedligehold kørestrøm (Banedanmark)
Vedligehold af banetrafoer, forsyning, koblere og forsyningsstationer på fjernbanen. Se udbuddet »
Vedligehold af banetrafoer, forsyning, koblere og forsyningsstationer på fjernbanen. Se udbuddet »
2016-11-01
Converter transformers upgrade KS 2 at substation Vester Hassing (Energinet.dk)
In relation to upgrade of the HVDC link KontiSkan 2 at substation Vester Hassing, delivered by ABB Ludvika 1987. The converter transformers for KontiSkan 2 need to be upgraded to increase the lifetime of the transformers of further 20 years. Se udbuddet »
In relation to upgrade of the HVDC link KontiSkan 2 at substation Vester Hassing, delivered by ABB Ludvika 1987. The converter transformers for KontiSkan 2 need to be upgraded to increase the lifetime of the transformers of further 20 years. Se udbuddet »
2014-06-04
Etablering af nødgeneratoranlæg (Banedanmark)
I forbindelse med opførelsen af 2 nye Banedanmark Traffic Control Centers (TCC) i hhv. København ved Kalvebod Brygge (TCC-East), og ved Fredericia ved banegården (TCC-West), skal der leveres, monteres og idriftsættes 2 redundante 1 000 kVA dieselgeneratoranlæg til hver TCC. I alt 4 stk. 1 000 kVA dieselgeneratoranlæg. Tilhørende hjælpesystemer som dieseltanke, skorstene og styretavler skal ligeledes leveres, monteres og idriftsættes. Se udbuddet »
I forbindelse med opførelsen af 2 nye Banedanmark Traffic Control Centers (TCC) i hhv. København ved Kalvebod Brygge (TCC-East), og ved Fredericia ved banegården (TCC-West), skal der leveres, monteres og idriftsættes 2 redundante 1 000 kVA dieselgeneratoranlæg til hver TCC. I alt 4 stk. 1 000 kVA dieselgeneratoranlæg. Tilhørende hjælpesystemer som dieseltanke, skorstene og styretavler skal ligeledes leveres, monteres og idriftsættes. Se udbuddet »
2014-04-16
24 kV metalkapslede højspændingsanlæg (HEF EnergiTeknik A/S)
Anskaffelsen omfatter levering af 4 stk. komplette indendørs, metalkapslede højspændingsanlæg til transformerstationerne i Terndrup og Tinghøj. — 2 stk. 24 kV anlæg med 8. koblingsfelter til Terndrup. — 1 stk. 24 kV anlæg med 9. koblingsfelter og 1 stk. 24 kV anlæg med 10 koblingsfelter til Tinghøj. — 2 stk. ekstra feltenhedsrelæer — Option på yderligere 3 anlæg til 60/20 kV stationerne i Vårst og Støvring, jf. II.2.2). De enkelte felter skal være selvbærende, komplet med bæreramme og understøtninger. … Se udbuddet »
Anskaffelsen omfatter levering af 4 stk. komplette indendørs, metalkapslede højspændingsanlæg til transformerstationerne i Terndrup og Tinghøj. — 2 stk. 24 kV anlæg med 8. koblingsfelter til Terndrup. — 1 stk. 24 kV anlæg med 9. koblingsfelter og 1 stk. 24 kV anlæg med 10 koblingsfelter til Tinghøj. — 2 stk. ekstra feltenhedsrelæer — Option på yderligere 3 anlæg til 60/20 kV stationerne i Vårst og Støvring, jf. II.2.2). De enkelte felter skal være selvbærende, komplet med bæreramme og understøtninger. … Se udbuddet »
2011-08-26
Replacement and commissioning of AVV unit 1 Excitation and Generator Protection Unit, 215MW (DONG Energy Power A/S)
Replacement and commissioning of AVV unit 1 Excitation and Generator Protection Unit. Turn Key project. Se udbuddet »
Replacement and commissioning of AVV unit 1 Excitation and Generator Protection Unit. Turn Key project. Se udbuddet »