Betingelser for deltagelse (tekniske og faglige kvalifikationer)
(a) At least one reference covering development of a largescale offshore wind farm with a capacity of 150 MW or more, completed within the last 5 years. The reference must concern a project where the instalment of the turbines has been completed, i.e. the last turbine has delivered the first kWh to the grid (fully commissioned offshore wind farm). The reference must show experience with at least 3 of the 5 following key areas of being a developer: project planning, design, procurement, execution and quality control of the offshore wind farm.
And
(b) At least one reference covering development of an offshore AC-substation servicing an offshore wind farm completed within the last 5 years. The reference must concern a project where the instalment of the AC-substation has been completed, i.e. has delivered the first kWh from the last turbine of the wind farm to the onshore/offshore point of connection (fully commissioned offshore AC-substation). The reference must show experience with at least 3 of the 5 following key areas of being a developer: project planning, design, procurement, execution and quality control of the offshore AC-substation servicing an offshore wind farm.
The minimum requirements may be met by one reference covering both an offshore wind farm (a) above and AC-substation (b) above, or by two separate references, one covering (a) and another one covering (b).
Only references carried out within the latest 5 years before the expiry of the deadline for application for pre-qualification will be accepted. Only works carried out at the time of application will be taken into account. Hence, in the case of a reference concerning an ongoing task, only the part of the works already performed at the time of application will be included in the assessment of the reference.
For each project used as a reference (max. 5 references), the applicant must provide the following description:
(a) name of offshore wind farm including grid connection (AC-substation, etc.) from wind farm to onshore/offshore point of connection;
(b) description of main elements of the offshore wind farm including grid connection (AC-substation, etc.) from wind farm to onshore/offshore point of connection;
(c) contact person at the contracting entity, the authority who awards the licence or the like (preferably including phone number and email address);
(d) contract signing date/ date of concession, permit, licence etc.;
(e) location of the offshore wind farm/AC-substation;
(f) planned capacity of the project (MW), and installed capacity of the project (MW);
(g) the applicant's/the supporting entity’s role (i.e. developer, owner, main consultant, sub-contractor, financial investor, or other);
(h) the applicant's/the supporting entity’s contribution to the project within the following key areas: project planning, design, procurement, execution and quality control of offshore wind farms;
(i) the current stage of the project and the period of time the applicant has been assigned to the project.
No additional documentation of technical and professional capacity will be required from the applicant. However, the DEA reserves the right to contact the applicant or the customer/authority stated in the reference for confirmation of the information stated in the reference.
If the applicant relies on the technical capacity of other entities, a declaration of support for each supporting entity must be submitted upon request. The DEA expects to request the declaration soon after the time limit for pre-qualification from those applicants, which the DEA expects to prequalify. A form which may be used is enclosed in annex 5 of the tender material.
If the applicant relies on technical capacity of other entities for the performance of specific parts of the works comprised by the contract, such specific parts of the works must be performed by the entity on which the applicant relies.