2015-07-01Frame Agreement for the supply of onshore services related to wells on natural gas storage (Energinet.dk)
The tender covers a frame agreement with one or several suppliers for the supply of onshore services related to wells on natural gas storage at Stenlille Gas Storage, Merløsevej 1 C, DK-4296 Nyrup.
The gas is stored in a sandstone formation named Gassum at a depth of about 1 500 m. The Gassum Formation is subdivided in 6 zones separated by thin claystone stringers.
The services will include the necessary activities for Energinet.dk to be able to comply with their obligations due to legislation as well as …
Se udbuddet »
2015-06-16Snubbing activities using rig (Energinet.dk)
Energinet.dk hereby invites potential contractors to pre qualify for a framework agreement on several snubbing operations in up to five salt caverns in Ll. Torup Natural Gas Strorage. Snubbing in will consist of installing 1 200 to 1 700 meter of 4½” piping in the gas filled caverns. Snubbing out will consist of pulling the same equipment. Furthermore the related services necessary for performing these operations will be part of the tender. These are e.g. slickline services, bridge plugs, nitrogen and …
Se udbuddet » Nævnte leverandører:Balance Point Control
2015-06-03Framework agreement on Sonar survey and related services in cavernes (Energinet.dk)
Energinet.dk hereby invites potential contractors to pre qualify for a framework agreement on Sonar survey and related services. The expected scope revolves measurements in seven salt cavernes filled with brine and/or natural gas in Ll. Torup Natural Gas Storage. Measurements will consist of acoustic/ultrasonic measurements for determining caverne geometry. Also measurement of pressure, temperature and other physical parameters will be required. Energinet.dk intends to award the frame-work agreement to 1 …
Se udbuddet » Nævnte leverandører:SOCON Sonar Control Kavernenvermessung GmbH
2015-05-11Kriegers Flak Combined Grid Solution (KF CGS). Cable Route Survey (Energinet.dk)
The Contracting Entity hereby invites potential Contractors to pre-qualify for a cable route survey expected to be carried out in 2015.
As part of the Kriegers Flak (KF) Combined Grid Solution (CGS) the Danish TSO Energinet.dk and the German TSO 50Hertz Transmission GmbH is preparing the installation of two parallel HVDC cables from the KFBE substation at the planned Kriegers Flak Wind Farm (DK) to the Baltic 2 substation at the Baltic 2 Wind Farm (DE).
The KF CGS cable route survey require geophysical …
Se udbuddet »
2015-04-16JFK and Storstrømmen — Offshore — Protection and Removal (Energinet.dk)
Description of the projects:
1. JFK:
In 2017 two existing 150 kV submarine cable connections has reached the end of their lifetime and need to be decommissioned. The cable connections are from Als to Funen and across Kolding Fjord. In addition two new 150 kV submarine cable connection, one between Fredericia and Funen and one between Als and Funen will reinforce the grid on Funen.
2. Storstrømmen:
Energinet.dk owns and operates 3 submarine cable systems in the strait that will have to be decommissioned …
Se udbuddet » Nævnte leverandører:JD Contractor
2015-03-17Supply of Steel Pipes (Energinet.dk)
Pre-qualification for supply of 14 km steel pipes DN 100 and DN 150 for Natural Gas, seamless or welded, Grade L290NE or X42NE, wt STD, approx. 400 tons.
In addition an optional order of 7,5 km steel pipes DN 200 for Natural Gas, seamless or welded, Grade L290NE or X42NE, wt STD, approx. 350 tons.
Se udbuddet »
2015-02-09Replacement of well head and production piping in natural gas caverne (Energinet.dk)
Consulting and engineering related to replacing well head and production string in natural gas caverne To-6. Certified well engineering and supervision. Tasks include among other preparation of: Specification of activities and materials for purchase. Working program, Rock Mechanical Assessment and other documents for authority approval.
The gas storage consist of 7 almost identical cavernes. Further to the one to be quoted, prices for additional 4 cavernes are requested. These can be ordered one by one.
Se udbuddet »
2015-02-09Frame Agreement — Supply of Steel Pipes (Energinet.dk)
Pre-qualification for the supply of Steel pipes DN 100 to DN 300 (pressure level 80 barg) for Bio- and Natural Gas — Danish Natural Gas Transmission system.
The frame agreement must be valid for 3 years with the possibility of 1 year extension.
Se udbuddet »
2015-02-09Frame Agreement for the supply of Metering and Analysing units for Bio- and Natural gas (Energinet.dk)
Pre-qualification for the supply of Metering and Analysing units for Bio- and Natural gas.
Metering and analysis units for injection of Bio- and Natural Gas into the transmission grid. The units shall be supplied as turnkey projects completely installed in container or customer building. Including fiscal equipment for metering of gas flow, gas composition (Gas Chromato-graphs) and gas analysis to qualify gas for entering the transmission gird according to the Danish rules. The maximum flow rates for the …
Se udbuddet » Nævnte leverandører:Elster-InstrometElster-Instromet A/S
2015-02-06Kriegers Flak offshore platform certification (Energinet.dk)
Energinet.dk — regarding the platform KFE also on behalf of 50 Hertz Transmission GmbH — hereby announces the certification tender for the Kriegers Flak (KF) offshore platforms KFA, KFB and KFE. The platforms shall, in particular, hold the equipment needed for the connection of the Kriegers Flak offshore wind farms and the equipment needed for the offshore interconnector Kriegers Flak Combined Grid Solution (CGS) between Denmark and Germany.
It is intended that the certification is to be conducted in the …
Se udbuddet » Nævnte leverandører:LIoyds Register EMEA
2015-01-28Overvågning ved udledning af fortyndet brine fra kavernerne på Ll Torup Gaslager (Energinet.dk)
Overvågning af spildevand, sediment og muslinger ved udledning af fortyndet brine (saltvand) fra kaverner på Lille Torup Gaslager, herunder prøvetagning, analyser og rapportering til myndigheder. Overvågningen skal følge kravene i VVM-tilladelse og tillæg til miljøgodkendelse for udledningen, begge udstedt den 19.12.2014.
Overvågningen omfatter prøvetagning i Limfjorden og på gaslageret, akkrediterede kemiske/fysiske analyser af prøver samt rapportering til myndigheder.
Der udbydes overvågning af …
Se udbuddet » Nævnte leverandører:Rambøll
2015-01-28Leje og håndtering af køreplader (Energinet.dk)
Energinet.dk bruger køreplader i forbindelse med store og små anlægsprojekter (el og gas) når der indenfor drifts- og vedligeholdsopgaver skal etableres adgangsveje og arbejdspladser.
Til almindeligt forekommende opgaver anvendes der fra 50 til 500 plader pr. opgave, f.eks. i forbindelse med drift og vedligehold af vore anlæg, når der er behov for at færdes i terrænet og på vore stationer. Samtidig bruges der op til 20 000 og 30 000 eller mere til de store anlægsprojekter, der kan strække sig over et par …
Se udbuddet »
2015-01-22Produktion og levering af relæfelter og egenforsyningstavler (Energinet.dk)
Energinet.DK ønsker indgå rammeaftale med op til 3 leverandører vedrørende produktion og levering af relæfelter og egenforsyningstavler
Opgaven omfatter:
1) Produktion, test og levering af åbne og lukkede relæfelter ud fra bygherrens tegninger
2) Konstruktion, produktion, dokumentation, test, levering af lukkede fordelingstavler til egenforsyning af relæfelter og andet udstyr ud fra enstregsdiagrammer og vejledende layout tegninger. Ordregiver er ansvarlig for selve egenforsyningen, og det er alene …
Se udbuddet » Nævnte leverandører:Automatic Syd A/SBravida Danmark A/SPro-Automatic A/S
2015-01-13Rammeaftale på managementkonsulenter (Energinet.dk)
Energinet.dk ønsker at indgå en rammeaftale for managementkonsulentydelser med 4 virksomheder.
Energinet.dk har løbende behov for at inddrage managementkonsulenter til løsning af forskellige opgaver af både kortere og længerevarende karakter inden for såvel drifts- som anlægsopgaver.
Arbejdet tilrettelægges fra gang til gang afhængig af opgavens art og omfang, tid, prioritering, ressourcer mv.
Opgavetyperne, der varierer fra gang til gang, kan overordnet summeres under følgende overskrifter:
Strategi og …
Se udbuddet » Nævnte leverandører:DeloitteImplement Consulting Group P/SQuartz+coRambøll Management Consulting
2014-12-29Horns Rev 3 export cable — UXO survey (Energinet.dk)
Energinet.dk hereby invites potential contractors to prequalify for a UXO survey to be carried out in 2015.
The Danish TSO Energinet.dk is preparing the installation of a 33 km export cable from the planned off-shore wind farm Horns Rev 3. The cable extends from the planned transformer station to the West coast of Jutland, Denmark. The cable route traverses areas with varying risk of encountering UXO and it has thus been decided that a multipurpose UXO survey shall be performed to meticulously …
Se udbuddet » Nævnte leverandører:Heinrich Hirdes
2014-12-19Kriegers Flak offshore transformer platforms design (Energinet.dk)
Energinet.dk — regarding the platform KFE also on behalf of 50Hertz Transmission GmbH — hereby announces the design tender of the Kriegers Flak (KF) offshore platforms KFA, KFE (together KFAE) and KFB. The platforms shall, in particular, hold the equipment needed for the connection of the Kriegers Flak offshore wind farms and the equipment needed for the offshore inter-connector Kriegers Flak Combined Grid Solution (CGS) between Denmark and Germany.
This tender covers, in particular, the services with …
Se udbuddet » Nævnte leverandører:ISC Rådgivende Ingeniør
2014-12-19Udlicitering af opgaven vedrørende salg og balancering af el fra visse vindmøller og andre VE-elproduktionsanlæg (Energinet.dk)
Energinet.dk er lovmæssigt pålagt balanceansvaret for visse vindmøller og andre VE-elproduktionsanlæg, der alle er omfattet af aftagepligt. Pr. 1.11.2014 har Energinet.dk balanceansvaret for 154 VE-fyrede elproduktionsanlæg med en samlet kapacitet på 103 MW, 349 vindmøller/vindmølleparker med en samlet kapacitet på 112 MW og 2.900 solceller og vandkraftanlæg med en samlet kapacitet på 78 MW. Energinet.dk afsæter elproduktionen på Nord Pool Spot og afholder balanceringsomkostningerne på vegne af …
Se udbuddet »
2014-12-18Leje og håndtering af køreplader (Energinet.dk)
Energinet.dk bruger køreplader i forbindelse med store og små anlægsprojekter (el og gas) når der indenfor drifts- og vedligeholdsopgaver skal etableres adgangsveje og arbejdspladser.
Til almindeligt forekommende opgaver anvendes der fra 50 til 500 plader pr. opgave, f.eks. i forbindelse med drift og vedligehold af vore anlæg, når der er behov for at færdes i terrænet og på vore stationer. Samtidig bruges der op til 20 000 og 30 000 eller mere til de store anlægs-projekter, der kan strække sig over et …
Se udbuddet »
2014-12-17Produktion og levering af relæfelter og egenforsyningstavler (Energinet.dk)
Energinet.DK ønsker indgå rammeaftale med op til 3 leverandører vedrørende produktion og levering af relæfelter og egenforsyningstavler
Opgaven omfatter:
Produktion, test, levering og dokumentering af relæfelter og genforsyningstavler ud fra bygherrens tegninger. Udbuddet gælder både nye anlæg onshore/offshore til Energinet.dks projekter og renovering af gamle relæfelter.
Se udbuddet »
2014-12-12VIKING Link. Client Representative Services (Energinet.dk)
Scope of Services:
National Grid Interconnectors Holding (NGIH) and Energinet.dk (ENDK) are jointly developing a new HVDC power cable between Great Britain and Denmark known as VIKING Link.
NGIH/ENDK is currently tendering a cable route survey extending across the North Sea between the two countries. The cable route survey will include geophysical survey, geotechnical investigations, cable-crossing investigations with ROV and Benthic investigations.
NGIH/ENDK hereby invites Tenderers to submit a response …
Se udbuddet »
2014-12-10COBRAcable — VSC Converters (Energinet.dk)
The Scope of work for COBRAcable VSC Converter includes design, execution and completion of the following:
— HVDC-VSC Converter substation in Eemshaven, The Netherlands,
— HVDC-VSC Converter substation in Endrup, Denmark.
The transfer capability for the COBRAcable VSC Converter Plant shall be 700 MW at +/- 320 kV DC with reference to IEC TR 62543:2013 Ed. 1.1 High-voltage direct current (HVDC) power transmission using voltage sourced converters (VSC).
Se udbuddet »
2014-11-12Energinet.dk — udbud af vinduespolering 2014 (Energinet.dk)
Ovennævnte udbud af vinduespolering gennemføres af Servicemægleren A/S på vegne af Energinet.dk
Opgaven omfatter vinduespolering af kontorlokaler hos Energinet.dk — i alt ca. 4 200 m² beliggende på følgende adresse:
Pederstrupvej 76, 2750 Ballerup.
Opgaven er ikke opdelt i delaftaler.
Procedure:
Ordregiver har valgt at gennemføre denne opgave digitalt igennem Mercell Danmark A/S.
For at deltage i opgaven kopieres dette link til din internet browser: http://permalink.mercell.com/47676635.aspx Her …
Se udbuddet » Nævnte leverandører:Ottzen & Co I/S
2014-11-06Energinet.dk — udbud af rengøring 2014 (Energinet.dk)
Ovennævnte udbud af rengøring gennemføres af Servicemægleren A/S på vegne af Energinet.dk
Opgaven omfatter rengøring af kontorlokaler hos Energinet.dk – i alt ca. 4 200 m² beliggende på følgende adresse: Pederstrupvej 76, 2750 Ballerup.
Opgaven er ikke opdelt i delaftaler.
Procedure:
Ordregiver har valgt at gennemføre denne opgave digitalt igennem Mercell Danmark A/S.
For at deltage i opgaven kopieres dette link til din internet browser: http://permalink.mercell.com/47472562.aspx Her tilmelder du dig …
Se udbuddet » Nævnte leverandører:Rengoering.Com A/S
2014-10-28Horizontal Directional Drills, Thy- Mors-Salling. (HDD TMS) (Energinet.dk)
Design and installation of 8 to 12 horizontal directional drills (HDD) each consisting of 4 pipes prepared for installation of 3 x HV single core cables and 1 x FO cable.
8-12 HDD lengths 300-700 m.
Due to ground conditions it may be required to combine several of the above mentioned HDD's up to a maximum HDD length of 1 500 m.
Se udbuddet »
2014-10-10Udbud på billeasing (Energinet.dk)
Energinet.dk ønsker at udbyde en rammeaftale på operationel billeasing. Energinet.dk ønsker en bilflåde med en grøn profil, et højt sikkerheds- og komfortniveau, samtidig med at vi opnår kontante og administrative besparelser på indkøb og håndtering af bilflåden.
Rammeaftalen udbydes som en rullende aftale, hvilket betyder, at der ikke kommer en stor mængde udskiftninger i flåden ved aftalens indgåelse. Over- gangen til ny leverandør foregår således løbende i takt med at nuværende leasingaftaler udgår og …
Se udbuddet » Nævnte leverandører:ALD Automotive
2014-10-10Qualification Sound reduction/insulation of Gas compressor station in Egtved, Denmark (Energinet.dk)
1. Introduction
Energinet.dk is an independent, public enterprise under the Danish Ministry of Climate, Energy and Building. Energinet.dk owns and runs 924 km gas transmission pipelines. A new compressor station in Egtved was constructed in 2011-2013.
The compressor station consists of four separate electrically driven compressor units of identical dimensions. Each compressor unit has a filter, followed by a compressor and a gas cooler.
2. Scope of work
In connection with capacity expansion of Compressor …
Se udbuddet » Nævnte leverandører:Persolit
2014-10-10Qualification Horns Rev 3: Design, construction, delivery and installation of turntable for submarine cable (Energinet.dk)
The contractor must design, construct, deliver and install a turntable for HV-submarine spare cables.
The turntable is expected to have a load capability of up to 600 ton and a diameter of 12-14 m. It must be possible to load and unload multiple cables (up to 4) – it must be possible to unload the cables individually.
The turntable must include mechanism for proper loading/unloading of cables.
Cable diameter is expected to vary between 150 mm - 300 mm and weight between 40 kg/m and 130 kg/m. length of …
Se udbuddet »
2014-10-0214/19974 — COBRAcable — VSC Converters (Energinet.dk)
The Scope of work for COBRAcable VSC Converter includes design, execution and completion of the following:
— HVDC-VSC Converter substation in Eemshaven, The Netherlands.
— HVDC-VSC Converter substation in Endrup, Denmark.
The transfer capability for the COBRAcable VSC Converter Plant shall be 700 MW at +/- 320kV DC with reference to IEC TR 62543:2013 Ed. 1.1 High-voltage direct current (HVDC) power transmission using voltage sourced converters (VSC).
Se udbuddet »
2014-09-1613/96882 — Leasing af biler (Energinet.dk)
Energinet.dk ønsker at udbyde en rammeaftale på operationel billeasing. Energinet.dk ønsker en bilflåde med en grøn profil, et højt sikkerheds- og komfortniveau, samtidig med at vi opnår kontante og administrative besparelser på indkøb og håndtering af bilflåden.
Rammeaftalen udbydes som en rullende aftale, hvilket betyder, at der ikke kommer en stor mængde udskiftninger i flåden ved aftalens indgåelse. Over- gangen til ny leverandør foregår således løbende i takt med at nuværende leasingaftaler udgår og …
Se udbuddet »
2014-09-11Indkøb af forsikringsaftaler (Energinet.dk)
Energinet ønsker at indgå en eller flere forsikringsaftaler indenfor følgende områder (dog ikke begrænset til):
— kombineret entreprise/montageforsikring
— entrepriseansvarsforsikring ekskl. skade på tredjemands infrastruktur
— entrepriseansvarsforsikring for skade på tredjemands infrastruktur og krav for deraf følgende driftstab
— professionel ansvarsforsikring.
Forsikringsselskabet skal samarbejde med Energinet.dk's forsikringmægler.
Se udbuddet » Nævnte leverandører:If
2014-09-0314/21956 lånefinansiering til ét eller flere af energinet.dk's 100 % ejede datterselskaber (Energinet.dk)
Til et eller flere af energinet.dk's 100 % ejede datterselskaber skal der etableres lånefinansiering i form af banklån, realkreditlån eller lignende finansieringsprodukt.
Der vil ikke blive stillet moderselskabsgarantier fra energinet.dk
Det er et minimumskrav for deltagelse i udbudsforretningen, at prækvalificerede tilbudsgivere signerer en fortrolighedsaftale med ordregiver.
Lånebeløbet forventes at udgøre 1 000 000 000-2 000 000 000 DKK.
Se udbuddet »
2014-07-1713/93430 Prequalification for supply of Mobile Transformer Oil Regeneration System (Energinet.dk)
Energinet.dk intends to acquire a mobile transformer oil regeneration system for regeneration of transformer oil and evacuation/oil filling of new transformers.
Energinet.dk expects the equipment to fulfil these basic requirements:
— Built into a container suitable for transportation on a semitrailer.
— Oil capacity: approximately: 6.000 liter/hour.
— Filter media: Fuller Earth, without any reactivation.
— Oil heating with an integrated oil burner. Capacity 250 kW, mounted with a plate heat exchanger.
— …
Se udbuddet »
2014-07-1514/20808 Framework agreement delivery of MPLS-TP (Energinet.dk)
Energinet.dk intends, as part of a project, to contract a framework agreement for the delivery of MPLS-TP, or similar technology for communication between data centers and high-voltage stations. The process is expected carried out as described in the initial schedule. General and technical information will be given to the prequalified end of August 2014, answering incoming questions will be issued in early September 2014 and submission of tenders, 12.9.2014 with the presentation of offers in late …
Se udbuddet »
2014-07-0914/20808 Rammeaftale på levering af MPLS-TP (Energinet.dk)
Energinet.dk udbyder hermed, som led i et projekt, en rammeaftale på levering af MPLS-TP eller lignende teknologi til brug for kommunikation mellem datacentre og højspændingsstationer. Processen forventes gennemført som beskrevet i den foreløbige tidsplan. Generel og teknisk information vil blive givet til de prækvalificerede ultimo august 2014, besvarelse af indkommende spørgsmål vil blive udsendt primo september og aflevering af tilbud 12.9.2014 med præsentation af tilbud ultimo september/primo oktober …
Se udbuddet »
2014-06-2314/20241 Prequalification JFK & Storstrømmen - Cable supply and installation (Energinet.dk)
JFK:
As a consequence of the decommissioning of plant 3 on the power plant Fynsværket in 2010, the production capacity was reduced to a level that has significant influences on the security of supply on the island of Funen when revisions in the grid need to be performed.
Within the next 5 years 1 of the two 400 kV systems from Jutland to Funen between Fraugde and Landerupgård needs to go through a major refurbishment process, where the towers of the overhead line need to be re-galvanized and where the …
Se udbuddet »
2014-06-1614/05741 HiPot AC/PD tests for cable systems 2015-2016 (Energinet.dk)
Energinet.dk intends to contract an independent, 3rd party to perform AC HiPot & PD commissioning testing on cable systems planned to be installed and commissioned in 2015, 2016 (and 2017).
The tests to be performed are AC HiPot tests executed in accordance with IEC 62 067 / IEC 60 840 at a voltage level of up to 1.7 x U0, for minimum one hour, or up to the time it takes to complete the number of cycles equal to 60 min at 50 Hz (180000 cycles).
The voltage applied shall be sinusoidal and have a frequency …
Se udbuddet »
2014-06-0614/18068 rammeaftale konsulenter (stationer) (Energinet.dk)
Energinet.dk ønsker at udbyde rammeaftale for konsulentydelser indenfor en eller flere af følgende fagområder. Det er muligt at byde ind på et eller flere af underpunkterne under de 4 hovedområder.
Projektering:
1. Projektering af styretavler til høj-spændingsanlæg.
2. Projektering af egenforsyningsanlæg.
3. Projektering/parametrering af styring og overvågning til højspændingsanlæg.
4. Projektering/parametrering af beskyttelse til højspændingsanlæg.
5. Projektering af højspændingsanlæg.
6. Projektering …
Se udbuddet »
2014-06-04Prequalification for Compressor Units for Injection of Upgraded Biogas into the Danish Natural Gas Transmission Network (Energinet.dk)
The Danish state owned gas transmission company Energinet.dk is going to receive upgraded biogas from a number of new biogas plants in Denmark during the coming years. The upgraded biogas will either come directly from the biogas plants at a pressure of 4-10 bar or from the natural gas distribution system at a pressure of 19 to 40 bar. The injection pressure is 80 bar. The flow rates will be in the range from 500 to 6 000 Nm³/h. In order to meet this demand Energinet.dk wishes to enter a non-exclusive …
Se udbuddet »
2014-05-28Prækvalifikation — Energinet.dks fremtidig konsoliderede ERP-platform (Energinet.dk)
I henhold til Rådets direktiv 2004/17/EF af 31.3.2004 om samordning af fremgangsmåderne ved tilbudsgivning indenfor vand- og energiforsyning samt transport og telekommunikation. Udbyder Energinet hermed, som et led i et projekt, købet af Energinets »fremtidig konsoliderede ERP-platform«. Herunder gennemførelse af analyse (Proof of Concept, POC), planlægning, implementering og idriftsættelse af den fremtidige ERP-platform.
Budgettet for POC-delen i udbuddet er 500 000 DKK alt inklusive. Der er ikke …
Se udbuddet »
2014-03-19Prequalification for the designing, manufacturing and commissioning of one 150/60kV 160MVA Power Transformer for... (Energinet.dk)
Further to the establishment of several wind parks in the areas of Thy, Mors and Salling, the undergrounding of the transmission grid and the resulting increase in power, Energinet.dk intends to purchase one 150/60kV 160MVA power transformer for substation Lem Kær ready for commisioning 15.6.2015 with options for;
one 150/60kV 160MVA power transformer for delivery to substation Videbæk ready for commissioning 15.6.2015;
one 150/60kV 160MVA transformer for delivery to substation Sindbjerg ready for …
Se udbuddet »
2014-03-07Prequalification for the supply of Odorant (Tetrahydrothiophene (CH2)4S (THT) for odorization in the Danish Natural... (Energinet.dk)
This Tender covers Energinet.dk 's use of Odorant (Tetrahydrothi-ophene (CH2)4S (THT) for odori-zation in the Danish Natural Gas distribution system. The product shall be according to ISO 13734.
Energinet.dk want to enter into a 3-yearly frame agreement with option for 1 + 1 year.
The annual consumption is ap-proximately 42.000 kg.
Energinet.dk uses its own 200 L stainless steel barrels to handle the THT. These barrels shall be delivered full at the delivery addresses and picked up for refilling at the …
Se udbuddet »
2014-01-23Prequalification for Compressor Units for Injection of Upgraded Biogas into the Danish Natural Gas Transmission Network (Energinet.dk)
The Danish state owned gas transmission company Energinet.dk is going to receive upgraded biogas from a number of new biogas plants in Denmark during the coming years. The upgraded biogas will either come directly from the biogas plants at a pressure of 4-10 bar or from the natural gas distribution system at a pressure of 19 to 40 bar. The flow rates will be in the range from 500 to 6000 Nm³/h. In order to meet this demand Energinet.dk wishes to enter a non-exclusive frame agreement with two suppliers. …
Se udbuddet »