Frame Agreement for the supply of Metering and Analysing units for Bio- and Natural gas

Energinet.dk

Pre-qualification for the supply of Metering and Analysing units for Bio- and Natural gas.
Metering and analysis units for injection of Bio- and Natural Gas into the transmission grid. The units shall be supplied as turnkey projects completely installed in container or customer building. Including fiscal equipment for metering of gas flow, gas composition (Gas Chromato-graphs) and gas analysis to qualify gas for entering the transmission gird according to the Danish rules. The maximum flow rates for the units is expected to be 500 — 10 000 Nm3/h, nominal gas pressure is 80 barg.
It is expected to purchase up to 5 units until the year 2018.
A concept description for the units can be requested (Energinet.dk doc no 14/23294-4).

Deadline

Fristen for modtagelse af bud var på 2015-03-01. Indkøbet blev offentliggjort på 2015-02-09.

Leverandører

Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:

Hvem? Hvad? Hvor?
Indkøbshistorik
Dato Dokument
2015-02-09 Udbudsbekendtgørelse
2015-09-25 Bekendtgørelse om indgåede kontrakter
Udbudsbekendtgørelse (2015-02-09)
Objekt
Omfanget af udbuddet
Titel: Udstyr til gasnet
Mængde eller omfang: See II.1.5).
Bekendtgørelsens metadata
Originalsprog: engelsk 🗣️
Dokumenttype: Udbudsbekendtgørelse
Kontraktens art: Varer
Forordning: Den Europæiske Union
Fælles glossar for offentlige kontrakter (CPV)
Kode: Udstyr til gasnet 📦

Procedure
Procedureform: Udbud efter forhandling
Bud-type: Indsendelse gældende for alle delaftaler
Kriterier for tildeling
Det økonomisk mest fordelagtige bud

Ordregivende myndighed
Identitet
Land: Danmark 🇩🇰
Type af ordregivende myndighed: Forsyningsvirksomhed
Navn på ordregivende myndighed: Energinet.dk
Postadresse: Tonne Kjærsvej 65
Postnummer: 7000
Postby: Fredericia
Kontakt
Internetadresse: http://www.energinet.dk 🌏
E-mail: indkob@energinet.dk 📧
Telefon: +45 70102244 📞

Reference
Datoer
Afsendelsesdato: 2015-02-09 📅
Tilbudsfrist: 2015-03-01 📅
Offentliggørelsesdato: 2015-02-14 📅
Identifikatorer
Bekendtgørelsesnummer: 2015/S 032-055066
EUT-S-nummer: 32
Yderligere oplysninger
The application must be submitted through the EU Supply system using the following link: https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET and must be written in Danish or English. Requests received after the determined deadline will not be accepted. Energinet.dk reserves the right to obtain supplementing information from the applicant. Energinet.dk will pre-qualify up to 5 applicants who are evaluated as most qualified for the specific tender. Only these applicants will be invited to submit a tender. The selection of the applicants will be based on the submitted references (to which extend the reference(s) are similar to the tender assignment). As a result the number of references will not be the determining factor alone but more importantly to which degree the specific forwarded reference are comparable and relevant to the tender assignment regarding the solution and scope. Energinet.dk has joined Global Compact, and is using the 10 principles as a platform for working with CSR and Energinet.dk's Code of Conduct. Ener-ginet.dk's CSR profile is visible at our homepage: www.energinet.dk Applicants who Energinet.dk enters into contracts with are expected to act in accordance with Energinet.dk's Code of Conduct.
Vis mere

Objekt
Omfanget af udbuddet
Kort beskrivelse:
Pre-qualification for the supply of Metering and Analysing units for Bio- and Natural gas.
Metering and analysis units for injection of Bio- and Natural Gas into the transmission grid. The units shall be supplied as turnkey projects completely installed in container or customer building. Including fiscal equipment for metering of gas flow, gas composition (Gas Chromato-graphs) and gas analysis to qualify gas for entering the transmission gird according to the Danish rules. The maximum flow rates for the units is expected to be 500 — 10 000 Nm3/h, nominal gas pressure is 80 barg.
Vis mere
It is expected to purchase up to 5 units until the year 2018.
A concept description for the units can be requested (Energinet.dk doc no 14/23294-4).
Referencenummer: 14/23298
Sted for udførelsen
Hovedsted eller sted for udførelsen: Near the Danish gas transmission grid.

Juridiske, økonomiske, finansielle og tekniske oplysninger
Betingelser for deltagelse
Egnethed til at udøve det erhverv:
A signed solemn declaration confirming that the applicant does not have any unpaid and due public debts, defined as any taxes, duties as well as contributions to security schemes under Danish law (or the laws of the country in which the applicant was established), exceeding 100 000 DKK and that the applicant is not subject to any of the reasons for exclusion mentioned in article 45 of directive 2004/18 EC, cf. article 54, section 4 in directive 2004/17 EC.
Vis mere
A template regarding the above mentioned can be downloaded at www.energinet.dk/tenders or from EU supply.
If suppliers have joint forces (i.e. joint ventures, consortia, etc.) the declaration must be provided for each individual supplier. The application must also clearly state the constellation which applies for pre-qualification and include a declaration whereby all participants of the consortium have assumed direct, unlimited and joint and several liability and whereby 1 participant of the consortium has been duly authorized to unrestrictedly bind the other participants of the consortium by such participant's sole signature.
Vis mere
Økonomisk og finansiel stilling:
The applicants most resent audited annual report in Danish or English (English summary can be accepted). The annual report must refer to the specific unit applying for pre-qualification. The annual report should include revenue (revenue as stated in the income statement), profit/loss before tax (Profit/loss as stated in the income statement), equity (Total equity incl. Share capital, reserves, revaluation, retained earnings etc.) and solvency ratio (equity/total assets).
Vis mere
The applicant's annual report and key figures will be subject to evaluation of whether the applicant undoubtedly has sufficient financial capacity to perform the specific project when assessing the risk and contract value. If Energinet.dk on this basis finds the applicant unqualified, Energinet.dk can choose to exclude the applicant from the pre-qualification.
Vis mere
An applicant may rely on the capacities of other entities, regardless of the legal nature of the links which it has with them. The applicant must in that case prove to Energinet.dk that it will have at its disposal the resources necessary, for example, by producing an undertaking by those entities to that effect (signed declaration).
Vis mere
If suppliers have joint forces (i.e. joint ventures, consortia, etc.) the most resent audited annual report in Danish or English must be enclosed for each partitioning entity. If such information is not included, or is not fully sufficient, for 1 or more participant, the application will not necessarily be regarded as non-compliant, but any such failure to include this information may influence the pre-qualification evaluation process.
Vis mere
Teknisk og faglig kompetence:
A reference list of the most significant comparable contracts undertaken in the past 3 years, with a motivated and detailed description of the contracts, scope of the contracts (contract value) and contact information for the entity in question (including contact person). If 1 or more references are missing the requested information, and such cannot be requested as supplementary information, this may influence the pre-qualification evaluation process.
Vis mere
Energinet.dk reserves the right to contact the stated references. Furthermore Energinet.dk also reserve the right to include own references if the applicant has concluded similar assignments within the last 3 years for Energinet.dk.
An applicant may rely on the capacities of other entities, regardless of the legal nature of the links which it has with them. The applicant must in that case prove to Energinet.dk that it will have at its disposal the resources necessary, for example, by producing an undertaking by those entities to that effect (signed declaration).
Vis mere
If suppliers have joint forces (i.e. joint ventures, consortia, etc.) references must be enclosed for each partitioning entity. If such information is not included, or is not fully sufficient, for 1 or more participant, the application will not necessarily be regarded as non compliant, but any such failure to include this information may influence the pre-qualification evaluation process.
Vis mere

Procedure
Antal operatører i rammeaftalen: 1
Rammeaftalens varighed i år: 3
Sprog
Sprog: engelsk 🗣️

Ordregivende myndighed
Identitet
Nationalt registreringsnummer: 28980671
Kontakt
Enhed: Indkøbs afdelingen
Køberprofilens adresse: http://eu.eu-supply.com/ctm/Supplier/CompanyInformation/Index/228008 🌏
URL til dokumenter: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=139450&B=ENERGINET 🌏

Reference
Datoer
Startdato: 2015-08-12 📅
Slutdato: 2018-12-31 📅

Supplerende oplysninger
Gennemgå organ
Navn: Klagenævnet for Udbud
Internetadresse: http://www.klfu.dk 🌏
Oplysninger om frister for klageprocedurer:
Lodging of appeals regarding pre-qualification should be made no later than 20 days after the Contracting Entity has submitted the substantiated results of the pre-qualification to the applicants.
Organ med ansvar for mæglingsprocedurer
Postadresse: langelinie Alle 17
Postby: København Ø
Postnummer: 2100
Kilde: OJS 2015/S 032-055066 (2015-02-09)
Bekendtgørelse om indgåede kontrakter (2015-09-25)
Objekt
Omfanget af udbuddet
Titel: Gasanalyseapparatur
Den samlede værdi af udbuddet: 1 097 450 💰
Bekendtgørelsens metadata
Dokumenttype: Bekendtgørelse om indgåede kontrakter
Forordning: Den Europæiske Union, med deltagelse af GPA-lande
Fælles glossar for offentlige kontrakter (CPV)
Kode: Gasanalyseapparatur 📦

Procedure
Bud-type: Finder ikke anvendelse

Reference
Datoer
Afsendelsesdato: 2015-09-25 📅
Offentliggørelsesdato: 2015-09-30 📅
Identifikatorer
Bekendtgørelsesnummer: 2015/S 189-343569
Henviser til bekendtgørelse: 2015/S 32-055066
EUT-S-nummer: 189

Ordregivende myndighed
Kontakt
URL til dokumenter: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=149854&B=ENERGINET 🌏
Kilde: OJS 2015/S 189-343569 (2015-09-25)