2023-07-07Procurement of M/R station Smorup (Energinet Gastransmission A/S)
The Contracting Authority wants to purchase a M/R station (Measuring & Regulating Station). The station is to be used for pressure reduction of natural gas between the transmission pipeline (80-55 barg) and the distribution pipeline (35-55 barg). The M/R station is part of FTB (Fast track Biogas) project, in which the gas from the distribution line pressurizes and deodorizes the gas to the transmission line. This will enable flow of biogas both ways, making it possible to distribute gas national in …
Se udbuddet »
2023-03-07Framework Agreement for gas compressor packages (Energinet)
The Framework Agreement covers installation of a number of reverse-flow plants with compressors for moving upgraded biogas from the distribution grid into the 80 barg natural gas transmission grid in Denmark.
The compressor packages will have different requirements to capacity range as well as pressure range. Basically, the units shall cover the capacity range from 5.000 Nm3/hr., to 15.000 Nm3/hr., with a min. inlet pressure of either 12, 23 or 35 barg and an approximate max. outlet pressure of either 60 …
Se udbuddet »
2023-01-27Framework Agreement for gas compressor packages (Energinet)
The Framework Agreement covers installation of a number of reverse-flow plants with com-pressors for moving upgraded biogas from the distribution grid into the 80 barg natural gas transmission grid in Denmark.
The compressor packages will have different requirements to capacity range as well as pres-sure range. Basically, the units shall cover the capacity range from 5.000 Nm3/hr to 15.000 Nm3/hr, with a min. inlet pressure of either 12, 23 or 35 barg and an approximate max. outlet pressure of either 60 …
Se udbuddet »
2022-01-20Framework Agreement concerning M/R stations for Green Gas Lolland-Falster-, Kildedal- and West Funen projects (Energinet Teknik og Anlæg A/S)
The Contracting Authority wants to establish a framework agreement concerning M/R-stations (Measuring & Regulating Stations). The stations are to be used for pressure reduction of natural gas between the transmission pipeline (80-46 barg) and the distribution pipeline (55-12 barg).
The three stations might need to be delivered simultaneously.
The framework agreement concerns potentially three M/R-station for three different projects. The three projects are:
- Green Gas Lolland-Falster: M/R-station …
Se udbuddet » Nævnte leverandører:Bohlen & Doyen Bau GmbH
2021-11-26Indkøb af VHP kammer (1) (Statens Serum Institut)
Ordregiver har behov for et nyt VHP dekontamineringskammer inklusive en 5-årig serviceaftale. Udbuddet gennemføres som et offentligt udbud efter udbudslovens afsnit II. Udbuddet omfatter alene en tilbudsfase.
For yderligere oplysninger om processen og kontraktens omfang henvises til udbudsmaterialet.
Se udbuddet »
2019-04-12Delivery, Installation and Service of Compressors for Injection of Upgraded Biogas (Dansk Gas Distribution Service Viborg A/S)
The purpose of this public procurement procedure is to establish a Framework Agreement between the contracting entity, Dansk Gas Distribution Service Viborg A/S, (hereinafter “the Buyer”) and one (1) supplier according to which the buyer — on an ongoing basis as needed — may order the delivery of complete biomethane injection compressor installations placed in enclosure for outdoor installation (hereinafter “Compressor(s)”) to be installed, connecting the existing or new biomethane upgrading plants to …
Se udbuddet » Nævnte leverandører:Fornovogas Srl
2019-03-26Tender for Maintenance and Repair Services for Biomethane Injection Compressors (HMN Naturgas I/S)
The buyer wishes to procure maintenance services related to preventive maintenance work and repair work of the buyer’s existing 29 Fornovo Gas Biomethane Injection Compressors. The compressors are placed at different biogas plant sites around Central and Northern part of Jutland. At most sites, two or more compressors are installed to make failover possible and to mitigate the immediate impact in case of unplanned stops and/or breakdowns.
Maintenance services entail the supplier’s performance of …
Se udbuddet »
2019-03-08Biomethane Injection Compressor (HMN Naturgas I/S)
Buyer request quotations for delivery and service of compressors for injection of upgraded biogas (biomethane). Buyer expect that around 15–20 biogas plants will be connected to the natural gas grid during the next years. Each biogas plant will typically be equipped with 2 injection compressor units.
The scope of the contract includes optional delivery of service and maintenance including spare parts and consumables.
The Buyer cannot guarantee a certain numbers of compressors units to be ordered, and the …
Se udbuddet »
2018-10-26Framework Agreement for Gas Compressor Packages (Energinet Teknik og Anlæg A/S)
Energinet tenders for a Framework Agreement for compressors for injection of upgraded biogas into the 19/40 barg distribution grid or the 80 barg natural gas transmission grid in Denmark.
The compressor packages will have different requirements to capacity range as well as pressure range. Basically, the units shall cover the capacity range from 500 Nm3/hr to 6 000 Nm3/hr, with an inlet pressure of approx. either 4, 7, 19 or 40 barg and an outlet pressure of approx. 19, 40 or 80 barg. They shall be …
Se udbuddet » Nævnte leverandører:Arizaga, Bastarrica Y CiaFornovogas SrlKwangshin Machine Ind. Co. Ltd
2018-09-20Framework Agreement for Gas Compressor Packages (Energinet Teknik og Anlæg A/S)
Energinet tenders for a Framework Agreement for compressors for injection of upgraded biogas into the 19/40 barg distribution grid or the 80 barg natural gas transmission grid in Denmark.
The compressor packages will have different requirements to capacity range as well as pressure range. Basically, the units shall cover the capacity range from 500 Nm3/hr to 6 000 Nm3/hr, with an inlet pressure of approx. either 4, 7, 19 or 40 barg and an outlet pressure of approx. 19, 40 or 80 barg. They shall be …
Se udbuddet »
2018-09-20Gas Compressor Stations for Upgraded Biogas (HMN Naturgas I/S)
The tender comprises non-exclusive framework contract for supply of different sizes of compressor stations, mounted in standard containers. The expected contract volume is 10-30 units over the contract period. The duration of the framework contract is 4 years, with optional extension of duration up to 6 years.
Tender is handled by Mercell sourcing services, use https://permalink.mercell.com/91828244.aspx
Se udbuddet »
2018-07-04Baltic Pipe — Procurement of gas compressors for compressor station Everdrup (Energinet TSO Gas A/S)
The Contracting Authority wishes to purchase natural gas compressors for the Compressor Station located at the South-East coast of Zealand, Denmark. The Compressor Station is referred to as Compressor Station Everdrup (CS Everdrup) and is part of the Baltic Pipe project.
The Baltic Pipe project is connecting the Norwegian gas transmission system Euro Pipe II with the Danish transmission system via a subsea pipeline in the North Sea and connecting the Danish transmission system with the Polish …
Se udbuddet » Nævnte leverandører:Siemens A/S
2017-12-20Procurement of Gas Compressors (Energinet)
The Contracting Authority wants to purchase gas compressors for two projects with an option to purchase a gas compressor for a third project. For further details concerning the purchases, reference is made to the appendices to the tender documents.
Purchase of gas compressors for all three projects is made with an option to purchase the foundation.
Se udbuddet »
2015-05-05Framework agreement for compressors for injection of upgraded biogas into DONG Gas Distributions A/S' natural gas... (Dong Gas Distribution A/S)
DONG Energy Sales & Distribution A/S' intends to install a number of compressors for injection of upgraded biogas into DONG Gas Distributions A/S' natural gas grid in Denmark.
The compressor package under the agreement will have different requirements to capacity range as well as pressure range.
Basically the package shall cover the capacity range from 150 Nm3/h to 10.000 Nm3/h, with an inlet pressure of 2.0 - 10.0 barg and an outlet pressure of 19 - 40 barg.
It is op to the manufacturer to decide the …
Se udbuddet »
2014-06-04Prequalification for Compressor Units for Injection of Upgraded Biogas into the Danish Natural Gas Transmission Network (Energinet.dk)
The Danish state owned gas transmission company Energinet.dk is going to receive upgraded biogas from a number of new biogas plants in Denmark during the coming years. The upgraded biogas will either come directly from the biogas plants at a pressure of 4-10 bar or from the natural gas distribution system at a pressure of 19 to 40 bar. The injection pressure is 80 bar. The flow rates will be in the range from 500 to 6 000 Nm³/h. In order to meet this demand Energinet.dk wishes to enter a non-exclusive …
Se udbuddet »
2014-03-19Naturgas Fyn Distribution A/S (Naturgas Fyn Distribution A/S)
The tender is for 1 compressorstation. The station has the purpose to compress upgraded biogas from 4 or 7 bar(g) gas network to a 18 bar(g) network if the consumption of gas in a connected 4 or 7 bar(g) network is less than the production of biogas.
Se udbuddet »
2014-01-23Prequalification for Compressor Units for Injection of Upgraded Biogas into the Danish Natural Gas Transmission Network (Energinet.dk)
The Danish state owned gas transmission company Energinet.dk is going to receive upgraded biogas from a number of new biogas plants in Denmark during the coming years. The upgraded biogas will either come directly from the biogas plants at a pressure of 4-10 bar or from the natural gas distribution system at a pressure of 19 to 40 bar. The flow rates will be in the range from 500 to 6000 Nm³/h. In order to meet this demand Energinet.dk wishes to enter a non-exclusive frame agreement with two suppliers. …
Se udbuddet »
2012-11-28Gas Compressor Stations for Upgraded Biogas (HMN Naturgas I/S)
Complete compressor stations for upgraded biogas mounted in containers for plug-in installation, including swichboard and remote operation. Two standard sizes are foreseen, 600 and 1200 cubic meters per hour, respectively. Inlet pressure 5 bar(g), outlet pressure 45 bar(g). Oil free compressors with frequency regulation and gas cooling included.
Se udbuddet » Nævnte leverandører:Fornovo Gas Srl