2012-08-17   Supply, erection and commissioning of bypass flue gas duct for Studstrup 400 MW power plant (DONG Energy Thermal Power A/S)
Bypass flue gas duct. — Supply, erection, commissioning and bypass of DeSox plant including dampers for the purpose of converting a fossil fueled power plant into biomass fired power plant. The power plant are in the size of several hundred MW. Se udbuddet »
Nævnte leverandører: Alstom Danmark A/S
2012-03-27   Purchase of apparatus and instruments etc (Aarhus University)
The Contracting Authority wants to consolidate all purchases of apparatus and instruments as well as laboratory furniture and related consumables, including software, after-sales services and service agreements in a number of framework agreements. These agreements will substitute the agreements that the Contracting Authority currently holds with a number of suppliers based on two tenders, with a total of 25 lots, conducted and awarded in 2010. Furthermore the Contracting Authority will in this tender … Se udbuddet »
2011-12-09   Udbud af klimaskabe med option på serviceaftale (Region Midtjylland)
Region Midtjylland iværksætter hermed et nyt udbud gennemført med forhandling efter forudgående udbudsbekendtgørelse i medfør af Udbudsdirektivet art. 30, stk. 1, litra a. Udbuddet omhandler levering af klimaskabe til de i Region Midtjylland praktiserende læger med option på serviceaftale. Klimaskabene skal anvendes til opbevaring af blodprøver og skal kunne holde en stabil temperatur på 21 grader med en afvigelse på +/- 1 grad. Antallet af klimaskabe er endnu ikke fastlagt, men det anslås, at kontrakten … Se udbuddet »
Nævnte leverandører: Vibocold A/S
2011-12-07   Hjørring Varmeforsyning - Multibrændselsanlæg - Maskinentreprise (Hjørring Varmeforsyning)
Multibrændselsanlægget omfatter projektering, levering, montering og opstart af et komplet multibrændselsanlæg, med en ydelse på 25 MW (inkl. røggaskondenseringen), til varmeproduktion baseret på forskellige typer brændsel (f.eks. savsmuld, træpiller, pileflis, flisede trærødder, skovflis, m.m.). Brændslerne vil kunne variere i vandindhold fra 10 – 70 %. Multibrændselsanlægget skal udføres med blandeanlæg, således at brændslet der tilføres kedel vil ligge på 30 – 55 %. Kedelanlægget skal udformes som et … Se udbuddet »
Nævnte leverandører: Weiss A/S
2011-11-10   Modernization of "Ljungström" Air Preheater sealing system for Studstrup 400 MW power station (DONG Energy Power A/S)
Renovation and modernization of mechanical sealing system at existing Air Preheater. The flue gas air preheater at Studstrup is made as a regenerative Ljungstrom sector-divided type. The new sealing system shall cope with the thermal expansion of the rotor system. The supply includes actuators. Se udbuddet »
2011-11-10   Hjørring Varmeforsyning - Multibrændselsanlæg - Maskinentreprise (Hjørring Varmeforsyning)
Multibrændselsanlægget omfatter projektering, levering, montering og opstart af et komplet multibrændselsanlæg, med en ydelse på 25 MW (inkl. røggaskondenseringen), til varmeproduktion baseret på forskellige typer brændsel (f.eks. savsmuld, træpiller, pileflis, flisede trærødder, skovflis, m.m.). Brændslerne vil kunne variere i vandindhold fra 10 – 70 %. Multibrændselsanlægget skal udføres med blandeanlæg, således at brændslet der tilføres kedel vil ligge på 30 – 55 %. Kedelanlægget skal udformes som et … Se udbuddet »
2011-10-20   Automated Biobanking Cryogenic Facility for long term storage at -86°C (Statens Serum Institut)
Automated Biobanking Cryogenic Facility for the longterm storage of cryotubes at -86°C for the National Biobank at the Statens Serum Institut, Denmark. Se udbuddet »
2011-10-20   — 86°C ultra-low temperature laboratory freezers (Statens Serum Institut)
— 86°C ultra-low temperature laboratory freezers for the National Biobank at the Statens Serum Institut, Denmark. Se udbuddet »
Nævnte leverandører: Holm & Halby A/S
2011-10-07   Udbud af klimaskabe med option på serviceaftale (Region Midtjylland)
Region Midtjylland inviterer herved interesserede tilbudsgivere til at byde på udbud af klimaskabe med option på serviceaftale. Klimaskabene skal anvendes til opbevaring af blodprøver hos de i Region Midtjylland praktiserende læger. Antallet af klimaskabe er endnu ikke fastlagt, men det anslås, at kontrakten omfatter et omfang på mellem 300-450 stk. Der ønskes at indgå kontrakt med én leverandør. Se udbuddet »
2011-10-06   Turn key SCR deNOx system for gas turbine boiler at DONG Energy Horsens CHP (combined heat and power) plant A/S (Horsens CHP Plant A/S. c/o DONG Energy Power A/S)
The main data of the existing plant are as follows: 1. Flue gas amount: 71,5 kg/s; 2. Gas turbine, model GE LM250PE; 3. Degasification type: Aalborg Ciserv A/S LV24; 4. Current NOx level, both with and without water injection: a) Without water injection: 1 100 mg/Nm3; b) With water injection: 680 mg/Nm3. The new SCR (selective catalytic reduction) plant must comply with the following requirements: 5. The following emissions must as a minimum be observed after installation and commissioning. When … Se udbuddet »
Nævnte leverandører: Industrivarme
2011-09-20   Cryogenic facility (Statens Serum Institut)
Biobanking cryogenic facility for the long-term storage of blood, serum, plasma, and buffycoat in 2D cypher microtubes in the vapour phase of liquid nitrogen (-196 C). Se udbuddet »
2011-09-16   Supply of 2 district heaters for DONG Energy Power Studstrup 400 MW Power Station (DONG Energy Power A/S)
This pre-qualification notice concerns the design, manufacturing, delivery and commissioning of 2 district heaters for a “one-to-one” replacement of existing heaters at Studstrup power station. The heater capacity is 240 MJ/s for each heater. Se udbuddet »
2011-09-14   Renovering af vekslerplader til Varmeplan Aarhus (Aarhus Kommune Teknik og Miljø)
Nedtagning, rengøring, renovering, trykprøvning og genopsætning af vekslerplader på Varmeplan Aarhus' vekslerstationer. Se udbuddet »
2011-09-09   Tårnby Renseanlæg - Ombygning og renovering (Tårnbyforsyning Spildevand A/S)
Udbudet omfatter ombygning og renovering på Tårnby Renseanlæg i totalentreprise indeholdende projektering, levering, montage, idriftsættelse mv. Service og garantier i forbindelse med procesindkøring og -aflevering vil indgå i aftalen, og de nærmere vilkår vil fremgå af udbudsmaterialet. Bygge- og anlægsarbejdet opdeles i 4 delaftaler der bl.a. omfatter etablering af nye efterklaringstanke, nedrivning af gl. tanke, etablering af ny parkeringsplads, etablering af nyt luftrenseanlæg med 25 m skorsten, … Se udbuddet »
2011-08-31   Levering og installering af SCR deNOx anlæg på Horsens Kraftvarmeværk A/S - Gasturbinekedel (Horsens Kraftvarmeværk A/S. c/o DONG Energy Power A/S)
Levering og installering af Turn Key SCR deNOx anlæg på Horsens Kraftvarmeværk A/S - Gasturbinekedel. Det eksisterende anlægs hoveddata er som følger: 1. Røggasmængde: 71,5 kg/s 2. Gasturbine, model: GE LM250PE 3. Afgaskedeltype: Aalborg Ciserv A/S LV24 4. Nuværende NOx niveau, både med og uden vandindsprøjtning: a) Uden vandindsprøjtning: 1100 mg/Nm3 b) Med vandindsprøjtning: 650 mg/Nm3 Det nye SCR anlæg skal opfylde følgende krav: 5. Følgende emissioner skal som minimum opfyldes efter installation og … Se udbuddet »
2011-07-01   Automated Biobanking Cryogenic Facility for long term storage at -20°C (Statens Serum Institut)
Automated Biobanking Cryogenic Facility for the long-term storage of DNA and PKU-cards at – 20°C. Se udbuddet »
Nævnte leverandører: RTS Life Science Limited
2011-05-17   Mechanical and electrical technology supplies for a new combined heat and power producing waste incineration line in... (I/S Nordforbrænding)
Mechanical and electrical works for a new combined heat and power producing waste incineration line with a capacity of 10 tonnes waste per hour, with one common turbine/generator system. The waste incineration line is based on a moving grate concept, steam boiler with SNCR, followed by semi-dry flue gas treatment, including electrical system, control and monitoring system and all necessary auxiliary systems. The works are divided in 3 lots: Lot A: one waste incineration unit including incinerator based … Se udbuddet »
2011-04-20   Udbud af rammeaftale om bygherreleverance af energianlæg (Lejerbo)
Lejerbo har udviklet et nyt boligkoncept (Energi-0-boligen), som tilbyder beboerne meget lave forbrugsudgifter til en konkurrencedygtig husleje. Konceptet indebærer, at boligernes meget lave energiforbrug til varme og varmt vand dækkes af forsyning fra solfangere og varmepumper, mens elforbruget til varmepumper, ventilatorer og pumper dækkes af solcellepaneler. Energianlægget, som skal forsyne boligerne, skal være uafhængigt af varmeforsyning i lokalområdet, da Energi-0-boligerne skal opføres mange … Se udbuddet »
2011-02-08   Udbud af kontrakt om pilotprojekt for individuel rådgivning vedr. installation af varmepumpe (Energistyrelsen)
Kontrakten vedrører et pilotprojekt, der skal vurdere effekten af individuel rådgivning om varmepumper (luft til vand og jordvarme) til private husejere. Pilotprojektet skal indeholde følgende: 1. Etablering af rådgivningsfunktion 2. Rådgivning af private husejere 2.a. Telefon og mailrådgivning (minimum 15 timer om ugen fordelt på tre dage) 2.b. Rådgivning hos husejeren (minimum 50 besøg) 3. Evaluering og måling af effekten af rådgivningen 3.a. Erfaringsopsamling inkl. udarbejdelse af diverse værktøjer … Se udbuddet »
Nævnte leverandører: Energistjenesten c/o VedvarendeEnergi
2011-02-07   Central Egelund (Aabenraa-Rødekro Fjernvarme a.m.b.a.)
Totalentreprise for projektering, levering og montering af komplet 30 MW flisfyret- og 15 MW oliefyret kedelcentral inkl. ca. 3 500 m2 bygninger og inkl. diverse hjælpeanlæg og en akkumuleringstank. Der er tale om såvel hedtvandsanlæg som traditionelt fjernvarmeanlæg, 3 stk. forsyningssystemer i alt. Se udbuddet »
2011-01-25   Servicering af DSB koncernens ventilations- & køleanlæg (DSB)
Landsdækkende servicering af DSB koncernens ventilations & køleanlæg på stationer, butikker, værksteder og administrative lokaler. Se udbuddet »