2023-02-22Re-tendering of Steam Turbine Major Overhaul (Sønderborg Kraftvarme A/S)
Sønderborg Kraftvarme A/S needs a major overhaul of the 5 MW combined high- and low-pressure stage steam turbine type NGS 40/40/80-3 & WK 40/45-3 and Renk-Tacke gearbox type TNA-630 delivered by Siemens AG in 1995 and commissioned by Siemens AG in 1996.
The generator unit of the steam turbine is not included in this tender.
Tender is handled by Mercell Sourcing Services, use https://permalink.mercell.com/197587539.aspx
Se udbuddet »
2023-01-24Steam Turbine Major Overhaul (Sønderborg Kraftvarme A/S)
Sønderborg Kraftvarme A/S needs a major overhaul of the 5 MW combined high- and low-pressure stage steam turbine type NGS 40/40/80-3 & WK 40/45-3 and Renk-Tacke gearbox type TNA-630 delivered by Siemens AG in 1995 and commissioned by Siemens AG in 1996.
The generator unit of the steam turbine is not included in this tender.
Tender is handled by Mercell Sourcing Services, use https://permalink.mercell.com/193063481.aspx
Se udbuddet »
2022-04-08Major overhaul of HP/IPO turbine (Nordjyllandsværket A/S)
This procurement procedure concerns the award of a Contract regarding the execution of a major overhaul of the 410 MW Alsthom GEC HP-IP0 steam turbine at Nordjyllandsværket uni 3 (NJV3) in 2023. The execution and the award of the Contract require Tenderers, who are able to complete a major overhaul of the turbine, including the following main Scope of Supply:
- Major overhaul of the HP-IP0 turbine
- Commissioning of the unit, including vibration measurements and verification tests, and
- Supply of new …
Se udbuddet » Nævnte leverandører:Fortum Sverige ABTGS Sweden AB
2021-10-07BB2 - Steam Turbine Unit (Fjernvarme Fyn Produktion A/S)
Fjernvarme Fyn Produktion A/S is located in Odense, Denmark and has initiated a procurement procedure concerns the award of a contract for a new steam turbine unit.
The award of the contract requires Tenderers, who can be responsible for a complete project execution (including deliveries of components) for the new steam turbine unit, including the following main supplies
-Engineering, design and QA
-Delivery of a back pressure steam turbine designed for district heating
-Gear if needed
-Generator 10 …
Se udbuddet »
2020-05-20Major Overhaul of HP-IP0 Turbine (Nordjyllandsværket A/S)
This procurement procedure concerns the award of a contract regarding the execution of a major overhaul of the 410 MW Alsthom GEC HP-IP0 steam turbine at Nordjyllandsværket uni 3 (NJV3) in 2021. The execution and the award of the contract require tenderers, who are able to complete a major overhaul of the turbine, including the following main scope of supply:
— major overhaul of the HP-IP0 turbine,
— commissioning of the unit, including vibration measurements and verification tests, and
— supply of new …
Se udbuddet »
2020-04-03Major Overhaul of HP-IP0 Turbine (Nordjyllandsværket A/S)
This procurement procedure concerns the award of a contract regarding the execution of a major overhaul of the 410 MW Alsthom GEC HP-IP0 steam turbine at Nordjyllandsværket uni 3 (NJV3) in 2021. The execution and the award of the contract require tenderers, who are able to complete a major overhaul of the turbine, including the following main scope of supply:
— major overhaul of the HP-IP0 turbine;
— commissioning of the unit, including vibration measurements and verification tests; and
— supply of new …
Se udbuddet »
2019-05-07Major overhaul of HP - IP0 turbine (Nordjyllandsværket A/S)
This tender procedure concerns the award of a Contract regarding the execution of major overhaul of the Alsthom GEC HP-IP0 steam turbine at Nordjyllandsværket unit 3 (NJV3) in 2020. The execution and the award of the contract requires Tenderers who is able to complete a major overhaul of a GEC ALSTOM HP/IP0 turbine.
Scope:
— Major overhaul of the HP/IP0 turbine including inspection of crossover pipes,
— Commissioning of the unit including vibration measurements and verification tests,
— Refurbishment / …
Se udbuddet »
2016-12-20HØK — Renewal of CHP plant — Helsingør (Helsingør Kraftvarmeværk A/S)
Helsingør Kraftvarmeværk A/S is operating a gas-fired combined cycle plant at the site of Energivej 19 in
Helsingør. A decision has been made to renew the existing plant by establishing a biomass-fired boiler at the
site.
The existing turbine condensers (district heating) to the existing steam turbine (combined cycle) will be utilised
for the new steam turbine. Only one steam turbine will be in operation at a time. It will not be possible to run
combined cycle plant and bio boiler plant in parallel. The …
Se udbuddet » Nævnte leverandører:MAN Diesel and Turbo SE
2015-10-08HØK — Renewal of CHP plant — Helsingør (Helsingør Kraftvarmeværk A/S)
The existing natural gas fired combined cycle unit was built in 1993 and has an electricity output of 60 MW and district heating output of 60 MW. The configuration is a single shaft arrangement with a gas turbine with HRSG, a steam turbine and 1 generator in common for the gas turbine and steam turbine.
The combined cycle unit shall be modified in order to use the existing steam turbine and generator without operating the gas turbine, i.e. by steam supply to the steam turbine from the new bio-mass …
Se udbuddet »
2013-09-10SKV steam turbine major overhaul at Skaerbaek Power Plant (DONG Energy Thermal Power A/S)
The contract will cover at complete overhaul of the high pressure and (assymetric) intermediate pressure turbine cylinders, see below in Section II.2.1 re Scope of the Contract.
The 416 MW GEC Alstom 5-cylinder steam turbine was commissioned in 1998 with approximately 100 000 operationg hours. It is a double re-heat system operating a live steam pressure of 290 bar and 580°C. The live steam flow is 270 kg/s.
Se udbuddet »
2011-05-17Mechanical and electrical technology supplies for a new combined heat and power producing waste incineration line in... (I/S Nordforbrænding)
Mechanical and electrical works for a new combined heat and power producing waste incineration line with a capacity of 10 tonnes waste per hour, with one common turbine/generator system.
The waste incineration line is based on a moving grate concept, steam boiler with SNCR, followed by semi-dry flue gas treatment, including electrical system, control and monitoring system and all necessary auxiliary systems.
The works are divided in 3 lots:
Lot A: one waste incineration unit including incinerator based …
Se udbuddet »