2020-09-22Thor Offshore Wind Farm Tender (Energistyrelsen)
In 2018, all political parties in the Danish Parliament entered into an energy agreement to ensure the green transition and provide security for long term investments. As part of the agreement, the parties decided to establish three new large-scale offshore wind farms before 2030, which will expand the supply of energy from offshore wind by at least 2,400 MW. The first of the three wind farms to be tendered is Thor Offshore Wind Farm. Please see the elaborate description in section II.2.4) and the tender …
Se udbuddet » Nævnte leverandører:Thor Wind Farm I/S
2018-08-14Wind Turbine Generator (WTG) (Limfjord Cluster — Nørre Økse Sø / Nørrekjær Enge 2)
Vattenfall Wind A/S bundle the procurement process for two onshore projects in Denmark. The two projects currently bundled for the purpose of this project are Nørre Økse Sø and Nørrekjær Enge 2 located in the northern part of Jylland about 50 km west of Aalborg.
The scope of delivery preliminary consist of 51 WTGs including a monopile foundation (MP) design, both certified, with options for service agreements (SA).
The main scope with the WTGs/MPs is planned as a complete delivery including design, …
Se udbuddet »
2017-02-08Levering, opstilling og idriftsættelse af landvindmøller samt drift, service og vedligeholdelse af disse vindmøller... (Hofor Vind A/S)
Hofor Vind A/S ønsker at indgå kontrakter om levering, opstilling og idriftsættelse af landvindmøller samt drift, service og vedligeholdelse af disse vindmøller på sites »Thorsminde« og »Rødby Fjord«. Udbuddet består af 2 delkontrakter. Delkontrakt 1 består af 1 kontrakt om levering, opstilling og idriftsættelse af 3 landvindmøller samt 1 kontrakt om drift, service og vedligeholdelse på sitet Thorsminde. Delkontrakt 2 består af 1 kontrakt om levering, opstilling og idriftsættelse af 8 landvindmøller samt …
Se udbuddet » Nævnte leverandører:Vestas Northern Europe A/S
2016-10-11Levering, opstilling og idriftsættelse samt drift, service og vedligeholdelse af tre landvindmøller (Hofor Vind A/S)
Hofor Vind A/S ønsker at indgå en kontrakt om levering, opstilling og idriftsættelse af 3 stk. landvindmøller med en maksimal højde på 140 m. Vindmøllerne skal opstilles ved Krejbjerg, Skive Kommune. Hofor Vind A/S ønsker samtidigt at indgå en 10-årig kontrakt vedrørende drift, service og vedligeholdelse af de 3 vindmøller. Vindmøllerne skal nettilsluttes senest den 17. november 2017.
Hofor Vind A/S har vurderet, at det vil give den bedste økonomiske ramme at lade opgaverne udføre af 1 leverandør, …
Se udbuddet » Nævnte leverandører:Siemens Wind Power A/S
2016-01-20Wind Turbine Service for offshore wind farms in Denmark and Germany (DONG Energy Wind Power A/S)
DONG Energy has three offshore windfarms in Denmark with a total of 274 turbines. The three offshore windfarms are Anholt located off coast of Grenå, Horns Rev 2 located off coats of Esbjerg and Nysted located off coast of Gedser. DONG Energy is the O&M provider of the turbines but due to lack of internal resources there is a need for a third party service provider for ad hoc wind turbine service including bolt tensioning and replacement of major components.
One contract will be entered.
In the contract …
Se udbuddet » Nævnte leverandører:Apro Wind A/S
2015-12-02Offshore Subsea Structural inspections on Windfarms in the Germany and Denmark (DONG Energy Wind Power A/S)
DONG Energy has 3 windfarms consisting of, Borkum and Gode Wind in the German northsea. Anholt Windfarm in the Kattegat sea off the Danish Coast. As part of DONG Energys OMA obligation, a requirement of a specialist 3rd party or parties contractor to undertake sub-sea structural inspections at the locations specified. The work shall be carried out between April -September 2016 The tasks expected to be undertaken are but not limited to.
General Visual Inspection:
Transition Piece (TP)/Jacket steel …
Se udbuddet » Nævnte leverandører:Hughes Sub Surface Engineering Ltd
2015-08-31WTG tender for offshore wind farms (DONG Energy Wind Power A/S)
The contract(s) will cover works in the form of a Turbine Supply Agreement and service and maintenance in the form of a Service & Warranty Agreement and potentially a Spare Part Agreement for offshore wind farm projects. The tender comprises up to 5 different sets of contracts as described above covering 5 projects with a total maximum capacity of 3 800 MWh.
The works and services and maintenance are expected to comprise, but not limited to, design, engineering, certification, procurement, supply, …
Se udbuddet »
2014-02-07Vindmøllepark St. Røttinge (St. Røttinge Wind Park A/S)
St. Røttinge Wind Park A/S har udviklet et vindmølleprojekt, der omfatter 3 vindmøller i St. Røttinge i Næstved Kommune. Formålet med dette udbud er at anskaffe de 3 vindmøller, inkl. levering, opførelse og idriftsættelse af vindmøllerne. Endvidere omfatter udbuddet efterfølgende service af vindmøllerne.
Hver vindmølle skal have et nominelt output på 3,0-3,3 MW svarende til et samlet output for vindmølleparken på 9-10 MW.
Vindmøllerne skal herudover bl.a. leve op til følgende krav:
— Antal vinger: 3
— …
Se udbuddet » Nævnte leverandører:Vestas Northern Europe A/S
2013-12-11Delivery, Installation, Commissioning and Maintenance of Wind Tunnel Axial Fan (Danmarks Tekniske Universitet / Technical University of Denmark)
DTU (Technical University of Denmark) is building a new wind tunnel at Campus Risø, Roskilde, Denmark for use in aerodynamic and aeroacoustic measurements. This tender is for the delivery, installation, commissioning and maintenance of the fan of the wind tunnel. The fan should be an Axial fan with a motoreffect between 1,8 MW and 2,8 MW (expected around 2,5 MW) with a diameter of approximately 5 meters. The fan must be able to deliver a flow rate of approximately 760 m3/sec. The contract in main terms …
Se udbuddet » Nævnte leverandører:TLT Turbu GmbH
2013-11-12Mejlflak Nearshore Wind Farm (Havvind Århus Bugt A/S)
Havvind Århus Bugt A/S ("HÅB") acting through its technical advisor COWI A/S are seeking main contractors that are interested in becoming pre-qualified for the subsequent tender of the turneky/EPCI contract for the Mejlflak Wind Farm in the Bay of Aarhus. COWI A/S has been employed by HÅB as owner's engineer and will as such make and receive all communication relating to prequalification and subsequent tendering. All communications hereunder shall be submitted to COWI A/S via e-mail to pevl@cowi.dk.
The …
Se udbuddet »
2013-07-09Levering, opstilling og idriftsættelse samt service af et anlæg med seks landvindmøller i Sønder Herreds Plantage, Morsø (Morsø Vind A/S)
Kontrakten omfatter levering, opstilling og idriftsættelse af et anlæg med 6 landvindmøller og tilhørende teknikhuse med bl.a. centralt SCADA-anlæg, kobling af internt og eksternt el-net og fiberanlæg for kommunikation samt tilhørende vej og pladsfaciliteter. Anlægget skal placeres og udformes i overensstemmelse med bestemmelserne i Morsø Kommunes lokalplan 40.34 og opfylde samtlige betingelser i Morsø Kommunes VVM-tilladelse af 4.7.2012. Det betyder bl.a., at anlægget i al væsentlighed skal etableres …
Se udbuddet »
2013-05-03Klim wind farm (Vattenfall Vindkraft A/S)
The scope of the whole project is to replace thirty five 600kW wind turbines (WTG) with twenty one new WTG and to build associated WTG foundations, roads and cables. The wind farm is located in Jammerbugt municipality in the north west of Jylland, Denmark. The Klim project is equipped with an irrevocable permit.
The contract comprises the design, transportation, installation, commissioning and maintenance of 21 wind turbines to Klim wind farm. The contract shall be governed under Danish law.
Se udbuddet »