Indkøb: Varmevekslere, udstyr til luftkonditionering og køling, apparater til filtrering (side 5)

2013-01-18   LOT M5: Upgrading of control and refurbishment of existing ElectroStatic Precipitator (ESP) for wood pellets (Vattenfall A/S)
LOT M5: Upgrading of control and refurbishment of existing Electro Static Precipitator (ESP) for wood pellets. Se udbuddet »
2012-12-20   Tail end (low dust) SCR system for Fynsværket unit 8 (Vattenfall A/S)
The purpose of the Qualification System is to establish a list of qualified Suppliers for a tail end (low dust) SCR system. The entire DeNOx system will require re-heating of the flue gas before the SCR-system and recovering the energy from the warm flue gas after the SCR-system by use of heat exchanger. The Works include design, manufacturing, supply, testing and commissioning. Flue gas flow: Approx 160.000 Nm3/h Fuel: Biomass (straw and wood chips) The SCR plant will be installed in a bio fired … Se udbuddet »
2012-12-19   LOT M1: Continuous Ship Unloader (CSU) for wood pellets; LOT M2: Transport and silo discharge equipment for wood... (Vattenfall A/S)
The purchase will be divided into four (4) different lots as described in the following. These may either be ordered as four (4) separate contracts or be freely combined into common contracts. LOT M1: Continuous Ship Unloader (CSU) for wood pellets. Supply of one Continuous Ship Unloader (CSU) for wood pellets at Amager Power Station located in the city of Copenhagen. The supply includes engineering, purchase, manufacturing, installation, commissioning, testing and documentation of one Continuous Ship … Se udbuddet »
2012-11-16   Automated biobanking cryogenic facility for long term storage of cryotubes at -80°C (Statens Serum Institut)
Automated biobanking cryogenic facility for the long-term storage of cryotubes at -80°C for the National Biobank at the Statens Serum Institut, Denmark. Se udbuddet »
2012-11-14   Kontrakt om levering af fjernvarmekedler (også kaldet fjernvarmeunits) (Gentofte Fjernvarme)
Kontrakten angår levering af fjernvarmekedler (også kaldet fjernvarmeunits), som Gentofte Fjernvarme løbende har til hensigt at få installeret i de borgeres hjem, som tilslutter sig Gentofte Fjernvarmes lejeordning. Fjernvarmekedlen forventes at skulle kunne leveres gennem/til grossist, VVS installatør eller direkte til installationsadressen. Der vil være mulighed for at have et mindre antal fjernvarmekedler på lager hos Gentofte Fjernvarme. Leverandøren er ikke garanteret salg af et bestemt antal … Se udbuddet »
2012-10-05   F2-06-00 - DNU - Køle- /varmeproduktionsanlæg (Region Midtjylland, Det Nye Universitetshospital, Projektafdelingen)
Nærværende kontrakt omhandler levering og etablering af et køle- og varmeproduktionsanlæg i forbindelse med byggeriet af Det Nye Universitetshospital DNU i Århus. Arbejdet består i hovedtræk i etablering af: — Komplet kølecentral med varmepumper, køleeffekt ca. 5 MW, 1 500 m3 akkumuleringstank og frikølere, — El og SRO til maskinanlæg, — 4 stk. hovedfordelingstavler á 1.250 A til teknikbygning, — Ventilation af teknikrum. Bygnings- og anlægsarbejder er ikke indeholdt i entreprisen. Baggrunden for … Se udbuddet »
2012-09-17   10 MW Træpillefyret Kedelanlæg (Halsnæs Forsyning)
Halsnæs Forsyning - Varme har besluttet at udskifte et træpillefyret kedelanlæg. Kedelanlægget opføres i eksisterende kedelhal. Kedelanlægget vil få en varmeydelse på 10 MW. Opgaven omfatter projektering, levering, montering og idriftsætning af komplet maskinleverance inkl. SRO-anlæg og el. Se udbuddet »
2012-08-31   Flue gas cooler for a biomass co-firing plant for wood pellets (Vattenfall A/S)
The supply includes a flue gas cooler including ducts to be installed at an existing coal fired power plant located at Nordjyllandsværket in the city of Aalborg. The flue gas cooler will be established as a part of a biomass co-firing project. The supply includes process design and mechanical design incl. CFD calculations, manufacturing, supply, installation, testing and commissioning. The flue gas cooler shall have a thermal capacity of 25 MW and shall be connected to the existing flue gas ducts in … Se udbuddet »
2012-03-27   Purchase of apparatus and instruments etc (Aarhus University)
The Contracting Authority wants to consolidate all purchases of apparatus and instruments as well as laboratory furniture and related consumables, including software, after-sales services and service agreements in a number of framework agreements. These agreements will substitute the agreements that the Contracting Authority currently holds with a number of suppliers based on two tenders, with a total of 25 lots, conducted and awarded in 2010. Furthermore the Contracting Authority will in this tender … Se udbuddet »
2011-12-07   Hjørring Varmeforsyning - Multibrændselsanlæg - Maskinentreprise (Hjørring Varmeforsyning)
Multibrændselsanlægget omfatter projektering, levering, montering og opstart af et komplet multibrændselsanlæg, med en ydelse på 25 MW (inkl. røggaskondenseringen), til varmeproduktion baseret på forskellige typer brændsel (f.eks. savsmuld, træpiller, pileflis, flisede trærødder, skovflis, m.m.). Brændslerne vil kunne variere i vandindhold fra 10 – 70 %. Multibrændselsanlægget skal udføres med blandeanlæg, således at brændslet der tilføres kedel vil ligge på 30 – 55 %. Kedelanlægget skal udformes som et … Se udbuddet »
Nævnte leverandører: Weiss A/S
2011-11-10   Modernization of "Ljungström" Air Preheater sealing system for Studstrup 400 MW power station (DONG Energy Power A/S)
Renovation and modernization of mechanical sealing system at existing Air Preheater. The flue gas air preheater at Studstrup is made as a regenerative Ljungstrom sector-divided type. The new sealing system shall cope with the thermal expansion of the rotor system. The supply includes actuators. Se udbuddet »
2011-11-10   Hjørring Varmeforsyning - Multibrændselsanlæg - Maskinentreprise (Hjørring Varmeforsyning)
Multibrændselsanlægget omfatter projektering, levering, montering og opstart af et komplet multibrændselsanlæg, med en ydelse på 25 MW (inkl. røggaskondenseringen), til varmeproduktion baseret på forskellige typer brændsel (f.eks. savsmuld, træpiller, pileflis, flisede trærødder, skovflis, m.m.). Brændslerne vil kunne variere i vandindhold fra 10 – 70 %. Multibrændselsanlægget skal udføres med blandeanlæg, således at brændslet der tilføres kedel vil ligge på 30 – 55 %. Kedelanlægget skal udformes som et … Se udbuddet »
2011-10-20   Automated Biobanking Cryogenic Facility for long term storage at -86°C (Statens Serum Institut)
Automated Biobanking Cryogenic Facility for the longterm storage of cryotubes at -86°C for the National Biobank at the Statens Serum Institut, Denmark. Se udbuddet »
2011-10-20   — 86°C ultra-low temperature laboratory freezers (Statens Serum Institut)
— 86°C ultra-low temperature laboratory freezers for the National Biobank at the Statens Serum Institut, Denmark. Se udbuddet »
Nævnte leverandører: Holm & Halby A/S
2011-10-06   Turn key SCR deNOx system for gas turbine boiler at DONG Energy Horsens CHP (combined heat and power) plant A/S (Horsens CHP Plant A/S. c/o DONG Energy Power A/S)
The main data of the existing plant are as follows: 1. Flue gas amount: 71,5 kg/s; 2. Gas turbine, model GE LM250PE; 3. Degasification type: Aalborg Ciserv A/S LV24; 4. Current NOx level, both with and without water injection: a) Without water injection: 1 100 mg/Nm3; b) With water injection: 680 mg/Nm3. The new SCR (selective catalytic reduction) plant must comply with the following requirements: 5. The following emissions must as a minimum be observed after installation and commissioning. When … Se udbuddet »
Nævnte leverandører: Industrivarme
2011-09-20   Cryogenic facility (Statens Serum Institut)
Biobanking cryogenic facility for the long-term storage of blood, serum, plasma, and buffycoat in 2D cypher microtubes in the vapour phase of liquid nitrogen (-196 C). Se udbuddet »
2011-09-16   Supply of 2 district heaters for DONG Energy Power Studstrup 400 MW Power Station (DONG Energy Power A/S)
This pre-qualification notice concerns the design, manufacturing, delivery and commissioning of 2 district heaters for a “one-to-one” replacement of existing heaters at Studstrup power station. The heater capacity is 240 MJ/s for each heater. Se udbuddet »
2011-09-14   Renovering af vekslerplader til Varmeplan Aarhus (Aarhus Kommune Teknik og Miljø)
Nedtagning, rengøring, renovering, trykprøvning og genopsætning af vekslerplader på Varmeplan Aarhus' vekslerstationer. Se udbuddet »
2011-09-09   Tårnby Renseanlæg - Ombygning og renovering (Tårnbyforsyning Spildevand A/S)
Udbudet omfatter ombygning og renovering på Tårnby Renseanlæg i totalentreprise indeholdende projektering, levering, montage, idriftsættelse mv. Service og garantier i forbindelse med procesindkøring og -aflevering vil indgå i aftalen, og de nærmere vilkår vil fremgå af udbudsmaterialet. Bygge- og anlægsarbejdet opdeles i 4 delaftaler der bl.a. omfatter etablering af nye efterklaringstanke, nedrivning af gl. tanke, etablering af ny parkeringsplads, etablering af nyt luftrenseanlæg med 25 m skorsten, … Se udbuddet »
2011-08-31   Levering og installering af SCR deNOx anlæg på Horsens Kraftvarmeværk A/S - Gasturbinekedel (Horsens Kraftvarmeværk A/S. c/o DONG Energy Power A/S)
Levering og installering af Turn Key SCR deNOx anlæg på Horsens Kraftvarmeværk A/S - Gasturbinekedel. Det eksisterende anlægs hoveddata er som følger: 1. Røggasmængde: 71,5 kg/s 2. Gasturbine, model: GE LM250PE 3. Afgaskedeltype: Aalborg Ciserv A/S LV24 4. Nuværende NOx niveau, både med og uden vandindsprøjtning: a) Uden vandindsprøjtning: 1100 mg/Nm3 b) Med vandindsprøjtning: 650 mg/Nm3 Det nye SCR anlæg skal opfylde følgende krav: 5. Følgende emissioner skal som minimum opfyldes efter installation og … Se udbuddet »
2011-07-01   Automated Biobanking Cryogenic Facility for long term storage at -20°C (Statens Serum Institut)
Automated Biobanking Cryogenic Facility for the long-term storage of DNA and PKU-cards at – 20°C. Se udbuddet »
Nævnte leverandører: RTS Life Science Limited
2011-05-17   Mechanical and electrical technology supplies for a new combined heat and power producing waste incineration line in... (I/S Nordforbrænding)
Mechanical and electrical works for a new combined heat and power producing waste incineration line with a capacity of 10 tonnes waste per hour, with one common turbine/generator system. The waste incineration line is based on a moving grate concept, steam boiler with SNCR, followed by semi-dry flue gas treatment, including electrical system, control and monitoring system and all necessary auxiliary systems. The works are divided in 3 lots: Lot A: one waste incineration unit including incinerator based … Se udbuddet »
2011-04-20   Udbud af rammeaftale om bygherreleverance af energianlæg (Lejerbo)
Lejerbo har udviklet et nyt boligkoncept (Energi-0-boligen), som tilbyder beboerne meget lave forbrugsudgifter til en konkurrencedygtig husleje. Konceptet indebærer, at boligernes meget lave energiforbrug til varme og varmt vand dækkes af forsyning fra solfangere og varmepumper, mens elforbruget til varmepumper, ventilatorer og pumper dækkes af solcellepaneler. Energianlægget, som skal forsyne boligerne, skal være uafhængigt af varmeforsyning i lokalområdet, da Energi-0-boligerne skal opføres mange … Se udbuddet »
2011-02-08   Udbud af kontrakt om pilotprojekt for individuel rådgivning vedr. installation af varmepumpe (Energistyrelsen)
Kontrakten vedrører et pilotprojekt, der skal vurdere effekten af individuel rådgivning om varmepumper (luft til vand og jordvarme) til private husejere. Pilotprojektet skal indeholde følgende: 1. Etablering af rådgivningsfunktion 2. Rådgivning af private husejere 2.a. Telefon og mailrådgivning (minimum 15 timer om ugen fordelt på tre dage) 2.b. Rådgivning hos husejeren (minimum 50 besøg) 3. Evaluering og måling af effekten af rådgivningen 3.a. Erfaringsopsamling inkl. udarbejdelse af diverse værktøjer … Se udbuddet »
Nævnte leverandører: Energistjenesten c/o VedvarendeEnergi
2011-02-07   Central Egelund (Aabenraa-Rødekro Fjernvarme a.m.b.a.)
Totalentreprise for projektering, levering og montering af komplet 30 MW flisfyret- og 15 MW oliefyret kedelcentral inkl. ca. 3 500 m2 bygninger og inkl. diverse hjælpeanlæg og en akkumuleringstank. Der er tale om såvel hedtvandsanlæg som traditionelt fjernvarmeanlæg, 3 stk. forsyningssystemer i alt. Se udbuddet »