De seneste indkøb af installation af gasmålere i Danmark
2023-07-07Procurement of M/R station Smorup (Energinet Gastransmission A/S)
The Contracting Authority wants to purchase a M/R station (Measuring & Regulating Station). The station is to be used for pressure reduction of natural gas between the transmission pipeline (80-55 barg) and the distribution pipeline (35-55 barg). The M/R station is part of FTB (Fast track Biogas) project, in which the gas from the distribution line pressurizes and deodorizes the gas to the transmission line. This will enable flow of biogas both ways, making it possible to distribute gas national in …
Se udbuddet »
2022-01-20Framework Agreement concerning M/R stations for Green Gas Lolland-Falster-, Kildedal- and West Funen projects (Energinet Teknik og Anlæg A/S)
The Contracting Authority wants to establish a framework agreement concerning M/R-stations (Measuring & Regulating Stations). The stations are to be used for pressure reduction of natural gas between the transmission pipeline (80-46 barg) and the distribution pipeline (55-12 barg).
The three stations might need to be delivered simultaneously.
The framework agreement concerns potentially three M/R-station for three different projects. The three projects are:
- Green Gas Lolland-Falster: M/R-station …
Se udbuddet » Nævnte leverandører:Bohlen & Doyen Bau GmbH
2019-10-16Fiscal Gas Metering and Analysis System (Energinet Gas TSO A/S)
Tender for a fiscal gas metering and analysis system as a complete system that will be fully compliant with NORSOK standard l-106 2014. A complete fiscal gas metering and analysis system is scope of the tendered assignment. The system must be fully equipped with analyzer instruments for determination and reporting of gas quality parameters.
Se udbuddet » Nævnte leverandører:Emerson Automation Solutions
2015-03-31Framework agreement for gas pressure control and metering (GPCM) stations (DONG Energy Sales & Distribution)
DONG Energy is receiving and will in the future receive requests for connection of Biogas Upgrading Plant
(BUP) to the gas distribution grid. Every connection requires one or more Biogas Måle- og Regulatorstationer (BMR = Bio Gas Pressure Control and Metering) stations. Depending on BUP outlet pressure and flow the BMR station shall operate at pressures from 3 to 16 barg with flow up to 4000 nm3/h or from 35 to 40 barg with flow up to 7000 nm3/h and typical with two runs and one meter
...
The upstream …
Se udbuddet »