2023-07-07   Procurement of M/R station Smorup (Energinet Gastransmission A/S)
The Contracting Authority wants to purchase a M/R station (Measuring & Regulating Station). The station is to be used for pressure reduction of natural gas between the transmission pipeline (80-55 barg) and the distribution pipeline (35-55 barg). The M/R station is part of FTB (Fast track Biogas) project, in which the gas from the distribution line pressurizes and deodorizes the gas to the transmission line. This will enable flow of biogas both ways, making it possible to distribute gas national in … Se udbuddet »
2023-04-14   Framework Agreement for deodorization units with THT analyser (Energinet)
In Denmark, the amount of biogas in the distribution grids increases. When bio natural gas (biomethane) from distribution grids is fed into the transmission grid, the concentration of odorant present in the gas needs to be reduced to accepted trace amounts max (1.0 mg THT/Nm3). The removal of the odorant, tetrahy-drothiophene (THT), will be executed by a deodorization unit, at the place of injection into the transmission system. The Framework Agreement covers purchase of a number of deodorizing units for … Se udbuddet »
2023-03-13   Framework agreement for deodorization units with THT analyses (Energinet)
In Denmark, the amount of biogas in the distribution grids increases. When bio natural gas (biomethane) from distribution grids is fed into the transmission grid, the concentration of odorant present in the gas needs to be reduced to accepted trace amounts max (1.0 mg THT/Nm3). The removal of the odorant, tetrahy-drothiophene (THT), will be executed by a deodorization unit, at the place of injection into the transmission system. The Framework Agreement covers purchase of a number of deodorizing units for … Se udbuddet »
2022-01-20   Framework Agreement concerning M/R stations for Green Gas Lolland-Falster-, Kildedal- and West Funen projects (Energinet Teknik og Anlæg A/S)
The Contracting Authority wants to establish a framework agreement concerning M/R-stations (Measuring & Regulating Stations). The stations are to be used for pressure reduction of natural gas between the transmission pipeline (80-46 barg) and the distribution pipeline (55-12 barg). The three stations might need to be delivered simultaneously. The framework agreement concerns potentially three M/R-station for three different projects. The three projects are: - Green Gas Lolland-Falster: M/R-station … Se udbuddet »
Nævnte leverandører: Bohlen & Doyen Bau GmbH
2020-05-29   Nyt gasmotoranlæg, Esbjerg Renseanlæg Øst (DIN Forsyning A/S)
Projektering og etablering af nyt gasmotoranlæg, herunder bl.a. gasmotor, udstødningsvekslersystem, maskinkomponenter, motorstyretavleanlæg og gaskedel med skorsten samt service for gasmotor. Se udbuddet »
Nævnte leverandører: Krebs A/S
2020-05-27   Deodorisation Unit for Tetrahydrothiophene (THT) Removal from Bio Natural Gas (Energinet Teknik og Anlæg A/S)
In Denmark, the amount of bio gas on the distribution grids increases. When bio natural gas (biomethane) from distribution grids is fed into the transmission grid, the concentration of odorant present in the gas needs to be reduced to trace amounts before the gas enters the transmission grid. The removal of the odorant, tetrahydrothiophene (THT), will be executed by a deodorisation unit at the place of injection into the transmission system. The tendered assignment is the supply and installation of a … Se udbuddet »
Nævnte leverandører: Bilfinger EMS GmbH
2020-04-30   Gasmotoranlæg til Esbjerg Renseanlæg Øst (DIN Forsyning A/S)
Projektering og etablering af nyt gasmotoranlæg, herunder bl.a. gasmotor, udstødningsvekslersystem, maskinkomponenter, motorstyretavleanlæg og gaskedel med skorsten samt service for gasmotor. Se udbuddet »
2019-12-19   Deodorization Units for Tetrahydrothiophene (THT) Removal from Bio Natural Gas (Energinet Teknik og Anlæg A/S)
In Denmark, the amount of biogas on the distribution grids increases. When bio natural gas (biomethane) from distribution grids is fed into the transmission grid, the concentration of odorant present in the gas needs to be reduced to trace amounts before the gas enters the transmission grid. The removal of the odorant, tetrahydrothiophene (THT), will be executed by a deodorization unit, at the place of injection into the transmission system. The tendered assignment is the supply and installation of 2 … Se udbuddet »
Nævnte leverandører: Bilfinger EMS GmbH
2019-07-15   Contract for Procurement of Gas Preheaters and Gas Filters for Nybro Gas Installation (Energinet Gas TSO A/S)
The Contracting Authority wants to purchase three (3) Gas Pre-Heaters (heat exchange units) and three (3) Gas Filters incl. commissioning support, spare parts and storage cost in total for installation at Nybro Gas Terminal. The scope is divided into 2 product groups. Each of the 2 product groups (preheaters/heat exchanges and gas filters) listed above will be described in separate lot. The technical specification for the gas preheaters consists of the following documents: — Appendix 2A.1: Data Sheet: … Se udbuddet »
Nævnte leverandører: FILTAN Bau- und Anlagentechnik GmbH
2019-06-12   Contract for Procurement of Gas Pre-Heaters and Gas Filters for Nybro Gas Installation (Energinet TSO Gas A/S)
The Contracting Authority wants to purchase three (3) gas pre-heaters (heat exchange units) and three (3) gas filters incl. commissioning support, spare parts and storage cost in total for installation at Nybro Gas Terminal. The scope is divided into 2 product groups. Each of the 2 product groups (pre-heaters/heat exchanges and gas filters) listed above will be described in separate lot. The technical specification for the gas pre-heaters consist of the following documents: — Appendix 2A: Data Sheet: … Se udbuddet »
2011-10-06   Turn key SCR deNOx system for gas turbine boiler at DONG Energy Horsens CHP (combined heat and power) plant A/S (Horsens CHP Plant A/S. c/o DONG Energy Power A/S)
The main data of the existing plant are as follows: 1. Flue gas amount: 71,5 kg/s; 2. Gas turbine, model GE LM250PE; 3. Degasification type: Aalborg Ciserv A/S LV24; 4. Current NOx level, both with and without water injection: a) Without water injection: 1 100 mg/Nm3; b) With water injection: 680 mg/Nm3. The new SCR (selective catalytic reduction) plant must comply with the following requirements: 5. The following emissions must as a minimum be observed after installation and commissioning. When … Se udbuddet »
Nævnte leverandører: Industrivarme