2022-03-07Framework Agreement on purchase and renovation of Gas Turbine Meters (Energinet Forretningsservice A/S)
Through the establishment of the present Framework Agreement Energinet wants to purchase new gas turbine meters and renovations for our biogas stations. For further information see Appendix 2: Scope of Works. The procurement is conducted as a negotiated procedure and the Framework Agreement will be entered with one provider for the duration of 8 years.
Se udbuddet »
2014-05-20Kontrakt om turbinerevision (Vordingborg Kraftvarme A/S)
Udbuddet omfatter indgåelse af en kontrakt vedrørende en hovedrevision (Major Overhaul) af en ABB V25 (10 MW) dampturbine for Vordingborg Kraftvarme A/S.
Hovedrevisionen inkluderer følgende opgaver:
1. Turbine hovedrevision, inklusive reduktionsgear, ventiler og server;
2. Levering af nye reservedele og renovering/reparation af eksisterende dele.
For så vidt angår leverancerne nævnt under punkt 2 bemærkes, at disse ydelser aktualiseres i indhold og omfang alt efter hovedrevisionens resultat og det …
Se udbuddet »
2013-09-10SKV steam turbine major overhaul at Skaerbaek Power Plant (DONG Energy Thermal Power A/S)
The contract will cover at complete overhaul of the high pressure and (assymetric) intermediate pressure turbine cylinders, see below in Section II.2.1 re Scope of the Contract.
The 416 MW GEC Alstom 5-cylinder steam turbine was commissioned in 1998 with approximately 100 000 operationg hours. It is a double re-heat system operating a live steam pressure of 290 bar and 580°C. The live steam flow is 270 kg/s.
Se udbuddet »
2012-08-30HEV steam turbine and generator major overhaul (DONG Energy Thermal Power A/S)
The 89 MW BBC single cylinder steam turbine was commissioned in 1982. It operates at a live steam pressure of 115 bar at 525°C. The steam flow is 120 kg/s. It’s at back pressure turbine supplying district heating to the city of Herning. The generator is an air/water cooled BBC type wx18L-083LLT of 111 MVA/50Hz.
Se udbuddet »
2011-09-20Major overhaul of Avedøreværket(AVV) unit 1 steam turbine section MP2 and LP (Avedøreværket)
Major overhaul of AVV unit 1 steam turbine section MP2 and LP.
Unit 1 was commissioned in 1990 and is a 262 MW BBC turbine with a steam pressure of 240 bar and steam temperature of 540 C running at 3000 RPM. It consist of a high pressure section, two medium pressure sections and a low pressure section. The work concerns the second medium pressure (IP2) section and the low pressure section (LP), both of which are with dual outlet with asymmetrical outlet pressures. The condenser pressure after the …
Se udbuddet » Nævnte leverandører:Turbocare Sp.zo.o