De seneste indkøb af fjernstyringsudstyr i Danmark
2020-10-13Metabolic Cages for Microbiome Food Research (Danmarks Tekniske Universitet — DTU)
DTU Biosustain is working with the gut microbiome, including its health and function. Therefore, it is of vital importance that DTU can study the health of mice gut during experiments e.g. studying the effect of various types of treatment. For studying of the muses, DTU wants to buy a 16-24 cage system of metabolic cages. The cages must be able to monitor calorimetry, activity, movement, bodyweight, food intake, endurance, activity and body temperature. This system must be kept in one cabinet in which …
Se udbuddet » Nævnte leverandører:TSE Systems GmbH
2020-10-0918 Metabolic Cages for Microbiome Food Research (Danmarks Tekniske Universitet — DTU)
DTU Biosustain is working with the gut microbiome, including its health and function. Therefore, it is of vital importance that DTU can study the health of mice gut during experiments e.g. studying the effect of various types of treatment.
For studying of the muses, DTU wants to buy an 18 cage system of metabolic cages. The cages must be able to monitor calorimetry, activity, movement, bodyweight, food intake, endurance, activity and body temperature. This system must be kept in one cabinet in which …
Se udbuddet »
2020-09-29High Throughput Screening Platform (Danmarks Tekniske Universitet — DTU)
The DTU Screening Core (DTU-SCore), a sub division of the Department of Chemistry, requires a High Throughput Screening (HTS) platform. The platform will be the main component of the everyday working schedule of DTU-SCore. The instruments that are a part of this platform and the platform it-self, will be used in collaboration with DK-OPENSCREEN, the Danish infrastructure for chemical biology.
The HTS Platform will be used for screening small molecules in different assay formats including bio-chemical, …
Se udbuddet » Nævnte leverandører:Kem-En-Tec Nordic A/SLab-Services BV
2020-07-15Fjernstyring af neutralsektioner i Borup og Sorø (Banedanmark)
Kontrakten omfatter etablering af 2 nye fjernstyringsstationer til nye neutralsektioner ved lokaliteter omkring Borup og Sorø. Herunder teknikhytte, inkl. styring og egenforsyning samt fremføring af styrekabler og forsyningskabler. Opgavens nærmere omfang er beskrevet i SAB (EP_1_6_CCS_005_SAB). Entreprenøren skal udføre detailprojektering, udførelse, test og dokumentation af de 2 understationer. Projektet har grænseflade til en sideløbende entreprise, som udfører køreledningsarbejdet på de 2 …
Se udbuddet »
2012-01-25New Turbine Control System (DCS) at Skærbækværket Power Plant Unit 3 (DONG Energy Power A/S)
This contract notice concerns renewal of CPU-based turbine control and turbine protection system for Power plant Skaerbaek Power Plant Unit 3, 410 MW steam turbine supplied by Alstom commissioned in November 1997. Turbine include cylinders for double reheat, LP-bypass and district heat control. DONG Energy Power A/S foresee new CPU’s include functionalities for all turbine control and protection.
Se udbuddet »