2025-11-20   Udbud af levering og montering af landstrømsanlæg (Fredericia Havn A/S)
Kontrakten omfatter levering og montering af et Landstrømsanlæg samt efterfølgende teknisk oplæring deri. Landstrømsanlægget skal forsyne containerskibe med landstøm fra en containerløsning indeholdende OPS. Tilbudsgiver skal tilslutte OPS til forsyningskablet, der er trukket fra TreFor transformerstation. Forsyningskablet er typen: 3x1x185/35 mm2 X-VOLT®Nordic/TSLF CU 6/10 (12) kV. Fra OPS skal Tilbudsgiver trække kabler ud til 2 tilslutningspunkter ved henholdsvis Kaj 18 og Kaj 19, hvor der skal laves … Se udbuddet »
2021-04-12   Tender for the Tunnel Power Supply contract for the Fehmarnbelt Fixed Link (Femern Bælt A/S)
The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 19 km distance across the Fehmarnbelt between Rødbyhavn on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany (incl. approx. 6 km on the landside). Femern A/S requires design, procurement and building/installation, … Se udbuddet »
2021-01-27   Tender for the Tunnel Electrical and Mechanical Contract for the Fehmarnbelt Fixed Link (Femern Bælt A/S)
The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 19 km distance across the Fehmarnbelt (*transportation infrastructure) between Rødbyhavn on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. The Tunnel Electrical and Mechanical ('TEM') contract covers the … Se udbuddet »
2014-02-03   Fehmarnbelt Fixed Link Project: Tunnel Power Supply Contract (Femern A/S)
The Fehmarnbelt Fixed Link Project (‘Project’) is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. This is intended to be an immersed tunnel containing two dual carriageways and a twin-track railway (‘Tunnel’). It will traverse the 18 km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S has been appointed as the infrastructure manager of the … Se udbuddet »
2014-02-03   Fehmarnbelt Fixed Link Project: Tunnel Electrical and Mechanical Contract (Femern A/S)
The Fehmarnbelt Fixed Link Project (‘Project') is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. This is intended to be an immersed tunnel containing two dual carriageways and a twin-track railway (‘Tunnel'). It will traverse the 18km distance across the Fehmarnbelt between Rødby on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. Femern A/S requires Mechanical, Electrical, Instrumentation, Control … Se udbuddet »