2020-08-28   Energinet, Insurance Procurement, Project: Kassø-Lykkegård (Energinet including all subsidaries)
The project ‘New 150 kV net structure in southwest Jutland’ aims to reorganize, strengthen and modernize the 150 kV electricity infrastructure in southwest Jutland in preparation of the future strengthening of Jutland´s 400 kV infrastructure and future-proof the capacity for new renewable energy connections in southwest Jutland. Further information can be found in the document Risk and Insurance Information. Tender is handled by Mercell Sourcing Services, use https://permalink.mercell.com/129070141.aspx Se udbuddet »
Nævnte leverandører: IF Skadeforsikring, filial af IF... Swiss Re International, filial af Swiss...
2019-12-05   Construction ‘All Risks’ and Third Party Liability Insurance of the Fehmarnbelt Fixed Link Project — Co-insurance (Femern A/S)
Femern A/S requires insurance services related to the construction of the Fehmarnbelt Fixed Link comprising: Lot 1: Construction ‘All Risks’ and third party liability insurance; Lot 2: Excess third party liability insurance. The owner has completed a separate procedure calling for tenders from lead insurers for each lot. The lead insurers who were awarded the contracts on each lot are: Lot 1: SCOR Europe SE (32,5 % capacity); Lot 2: Chubb European Group SE (30 % capacity). However, it is noted that the … Se udbuddet »
Nævnte leverandører: Allianz Global Corporate and Specialty,... AXA Versicherung AG Berkshire Hathaway European Insurance... Codan Forsikring A/S Great Lakes Insurance SE, UK Branch Helvetia Swiss Insurance Company in... Starr Europe Insurance Limited Swiss Re International, filial af Swiss...
2017-07-17   Insurance Tender — Contract Works, Third Party Liability and Contractor's Pollution Liability (A/S Femern Landanlæg)
A/S Femern Landanlaeg, part of Sund og Baelt Holding A/S are undertaking the following works along the alignment from Ringsted to Femern Banen. The existing line from Ringsted to Nykoebing F. will be expanded to a double track and upgraded to allow for 200km/h train system. The new track will be laid between Vordingborg and Holeby/Rødby. Additional signalling/electrification works are expected to be undertaken at some stage in the future — to be completed by 2024. Fermern Landanlaeg would like to … Se udbuddet »
Nævnte leverandører: Chubb European Group ltd RiskPoint A/S Starr Companies StarStone Insurance Swiss Re International, filial af Swiss... XL Insurance Co SE