2017-12-13
Professional Indemnity Insurance for a Large Construction Project (2018-2024) (A/S Femern Landanlæg)
A/S Femern Landanlaeg would like to obtain insurance coverage for professional indemnity in connection with a large construction project. — Period of insurance: 2018-2024, — Insurance limit EUR 25 or 50M, — Deductible EUR 1M, — Inception 1st of May 2018. Se udbuddet »
A/S Femern Landanlaeg would like to obtain insurance coverage for professional indemnity in connection with a large construction project. — Period of insurance: 2018-2024, — Insurance limit EUR 25 or 50M, — Deductible EUR 1M, — Inception 1st of May 2018. Se udbuddet »
2017-07-17
Insurance Tender — Contract Works, Third Party Liability and Contractor's Pollution Liability (A/S Femern Landanlæg)
A/S Femern Landanlaeg, part of Sund og Baelt Holding A/S are undertaking the following works along the alignment from Ringsted to Femern Banen. The existing line from Ringsted to Nykoebing F. will be expanded to a double track and upgraded to allow for 200km/h train system. The new track will be laid between Vordingborg and Holeby/Rødby. Additional signalling/electrification works are expected to be undertaken at some stage in the future — to be completed by 2024. Fermern Landanlaeg would like to … Se udbuddet »
A/S Femern Landanlaeg, part of Sund og Baelt Holding A/S are undertaking the following works along the alignment from Ringsted to Femern Banen. The existing line from Ringsted to Nykoebing F. will be expanded to a double track and upgraded to allow for 200km/h train system. The new track will be laid between Vordingborg and Holeby/Rødby. Additional signalling/electrification works are expected to be undertaken at some stage in the future — to be completed by 2024. Fermern Landanlaeg would like to … Se udbuddet »