2013-06-07   TP45 Bridges and Earthwork (Banedanmark)
Being the Employer, Banedanmark requires the Contractor to design and build the following permanent works: The Tender Package TP 45 will be let as a Design / Build contract comprising the following main works: — Embankments and excavations for The New Line for a section of cca. 750m and a shunt towards a junction with the existing railway Lille Syd. The work includes preparations for 2 no. points on the shunt; — Sub-ballast and the bottom layer of ballast of crushed stone; — Drainage of the railway incl. … Se udbuddet »
Nævnte leverandører: Arkil A/S
2013-04-08   TP 30 Bridges and Earthwork (Banedanmark)
Being the Employer, Banedanmark requires the Contractor to design and build the following permanent civil works. The tender Package TP 30 will be let as a Design / Build contract comprising the following main works: - Embankments and excavations for the railway. - Sub-ballast and lower layer ballast for the railway. - Drainage of railway embankment including pumping stations and rainwater basins. - Foundations for catenary system (optional outside structures). - Railway crossing of Motorring 4, part I … Se udbuddet »
Nævnte leverandører: CG Jensen Barslund