De seneste indkøb af opførelse af forsknings- og prøvningsfaciliteter i Danmark
2019-11-19DTU Electromagnetic Test Centre — Phase II (Danmarks Tekniske Universitet — DTU)
DTU is establishing the DTU Electromagnetic Test Centre (DTU ETC) for high-accuracy testing of antennas, components and circuits, as well as materials and scattering structures. The DTU ETC will comprise several laboratories in the existing building 353 and a new building 357. Phase I of the DTU ETC was initiated in 2016 and completed in 2018, while phase II was initiated in 2017 and will be completed in 2022.
This procurement includes the following 3 different test facilities:
— millimetre-wave antenna …
Se udbuddet » Nævnte leverandører:ETS-Lindgren OyNSI-MI Technologies LLC
2019-03-20E03 Stål - Veterinær beredskabsbygning (Statens Serum Institut)
SSI udbyder fagentreprise E03 Stål i forbindelse med opførsel af en 800 m2 veterinær beredskabsbygning (etageareal cirka 2 400 m2). Bygningen indeholder laboratorier til diagnostik og analyser, der lever op til BSL 3+ krav.
Formålet med anskaffelsen er at sikre, at der bliver etableret, leveret og monteret de omfattede stålkonstruktioner og arbejder, der er afgørende for, at de øvrige fagentrepriser kan opstarte. Arbejderne omfatter følgende arbejder: tagkonstruktion, mezzanin, parocelementer …
Se udbuddet »
2018-11-06Y40 SDU-SUND (Vejdirektoratet)
I forlængelse af fordyrelsen af byggeriet af Niels Bohr Bygningen har Vejdirektoratet midlertidigt overtaget det styrings- og udførelsesmæssige ansvar for gennemførelsen af 4 af Bygningsstyrelsens byggeprojekter, herunder SDU-SUND, der vedrører et nyt sundhedsvidenskabeligt fakultet på Syddansk Universitet, som denne bekendtgørelse knytter sig til. SDU-SUND kommer til at bestå af ca. 50 600 m2. Nybyggeriet skal huse SUND᾽s forsknings- og uddannelsesaktiviteter.
Se udbuddet » Nævnte leverandører:MT Højgaard A/S
2017-09-15Anechoic room for the Danish National Wind Tunnel (Danmarks Tekniske Universitet / Technical University of Denmark)
The Danish National Wind Tunnel is at the moment being established in Denmark at DTU Risoe Campus close to Roskilde dedicated for wind energy purposes. The wind tunnel has a cross sectional area of the test section of 2 m * 3 m with a maximum flow speed of 105 m/s and a turbulence intensity of below 0.1 %. The wind tunnel is dedicated to measurements on blade sections for wind turbine blades. Customers in the tunnel will be wind turbine manufacturers, but could also be the industry that needs the support …
Se udbuddet » Nævnte leverandører:IAC Acoustics A/S
2015-12-17DTU Life Science and Bioengineering — Special doors and windows (Danmarks Tekniske Universitet (DTU))
Contract regarding delivery and installation of special doors and windows for the new Building 205A connected to the DTU Life Science and Bioengineering. The task comprises the special doors and windows for a new 6 storey building, including basement and technical floor, with a total gross floor area of approximately 8 400 m used for high-level biocontainment laboratories and animal facilities.
Se udbuddet »
2014-10-01DTU Fotonik — opførelse af ny bygning 340 — E02 Hovedentreprisekontrakt (Danmarks Tekniske Universitet (DTU))
Den udbudte kontrakt består af:
— opførelse af ny bygning på 3 700 m² bla. indeholdende optiske laboratorier, undervisningslokaler og kontorer
— landskabsarbejder i forbindelse med ny bygning
— nedrivning af uopvarmet gang
— etablering af ny transformerstation
— ombygning af eksisterende bygninger.
Den udbudte kontrakt udbydes som hovedentreprise med fremrykket medvirken, hvor formålet er, at hovedentreprenøren skal bistå bygherre og dennes totalrådgiver med optimering af det udbudte …
Se udbuddet » Nævnte leverandører:B. Nygaard Sørensen A/S