Indkøb: DONG Energy Thermal Power A/S (side 2)

2013-07-07   Replacement and commissioning of super- and reheater parts of the boiler of Studstrup 400 MW Power station (DONG Energy Thermal Power A/S)
This prequalification notice concerns erection and commissioning of superheater, reheater, primary and secondary boxes. The works includes dismantling of existing heaters. All pressure parts material are supplied by others. Se udbuddet »
2013-06-30   80 MVA transformer for electrical boiler plant at Studstrup power station (DONG Energy Thermal Power A/S)
Design, manufacturing, delivery, installation and commissioning of 80 MVA three-windings transformer for electrical boiler plant. Transformer primary system voltage of approx. 150 kV and secondary voltages of 10 kV. Se udbuddet »
2013-06-30   Electrical boiler plant for district heating for Studstrup power station (DONG Energy Thermal Power A/S)
Design, manufacturing, delivery, installation and commissioning of 2 electrical hot water boilers. Effect: 2 x 40 MJ/s. Se udbuddet »
2013-05-24   Heating elements for gas-gas heaters (Ljungström type) at Avedøre Power Plant (DONG Energy Thermal Power A/S)
Heating elements for one air preheater (APH) and for one gas-gas heater (GGH) at Avedøre Power Plant unit 1. The scope includes dismantling of existing elements, delivery and installation etc. of the heating elements. The installation is expected to be done in May 2014. Se udbuddet »
Nævnte leverandører: Alstom Power Energy Recovery GmbH
2013-04-22   Stevedoringsarbejde samt oplagring i Danmark i forbindelse med håndtering af biomasse (DONG Energy Thermal Power A/S)
Stevedoringsarbejde samt oplagring i Danmark i forbindelse med håndtering af biomasse Se udbuddet »
Nævnte leverandører: Kloster A/S Svane Shipping A/S
2013-04-19   Major overhaul of generator at Kyndby Power Plant unit 22 (DONG Energy Thermal Power A/S)
Major overhaul of a 307 MVA static excitation generator, including stator core and rotor repair. The scope includes all mechanical engineering, services and tests. The planned outage for finalizing the the scope is 5 weeks. The time period is expected to be in calendar week 36-42, 2013. Se udbuddet »
2013-01-10   Laboratorieydelser for DONG Energy Thermal Power A/S (DONG Energy Thermal Power A/S)
Laboratorieydelser for DONG Energy Thermal Power A/S's kraftværker i Danmark, herunder: Asnæsværket, Avedøreværket, Enstedværket, Esbjergværket, H. C. Ørstedværket, Herningværket, Kyndbyværket, Skærbækværket, Stigsnæsværket, Studstrupværket og Svanemølleværket. På Enstedværket er der et centrallaboratorium, mens der på Asnæsværket, Avedøreværket, Esbjergværket og Studstrupværket er driftslaboratorier. Leverandøren, der får tildelt kontrakten, skal overtage medarbejderne på laboratorierne fordelt på de … Se udbuddet »
Nævnte leverandører: Force Technology
2012-12-21   Major overhaul of generator at Avedøre power plant unit 2 (DONG Energy Thermal Power A/S)
Major overhaul of a 565 MVA static excitation generator, including stator core and rotor repair. The scope includes all mechanical and electrical engineering, services and tests. The planned outage for finalizing the scope is 5 weeks. The time period is expected to be in calendar week 26-30, 2013. Se udbuddet »
2012-12-19   Fuel feeders for Avedøre Power Plant unit 1 (DONG Energy Thermal Power A/S)
Four gravimetric fuel feeders and four bunker shut-off gate valves for Avedøre Power Plant unit 1. The fuel feeders must be able to handle coal and biomass. The capacity of each fuel feeder must be designed for approximately 40 ton/h (both for coal and biomass). The installation is expected to take place second half 2013. Se udbuddet »
Nævnte leverandører: Tekfa A/S
2012-11-02   Fuel handling for DONG Energy Thermal Power A/S (DONG Energy Thermal Power A/S)
Manpower for handling of fuels and mineral products on the following of DONG Energy Thermal Power A/S's central power stations in Denmark: Asnæs power station, Avedøre power station, Esbjerg power station, and Studstrup power station. Fuel handling at Stigsnæs power station is expected to start up ultimo 2013. If the Tenderer is awarded a contract, it must expect to acquire the staff in the assigned location(s) in accordance with the rules in the Law on Employees' right in the event of Transfer of … Se udbuddet »
2012-09-25   Conversion of ENV3 to Synchronous Condenser Unit (DONG Energy Thermal Power A/S)
Modification of an existing 33 year old steam turbine driven 50 Hz, 850 MVA generator in order to allow it to be operated as a synchronous condenser at 150 kV level. The work involves design, manufacturing, erection and commissioning of the modification among others involving separation of steam turbine rotor and generator rotor, implementation of a thrust bearing, modification of generator radial bearing concept and implementation of a starting device (motor or static starting device) capable of running … Se udbuddet »
2012-09-12   Filter bags for flue gas desulphurization plant at Studstrup Power Station (DONG Energy Thermal Power A/S)
Filter bags for flue gas desulphurization for Studstrup Power Station. The contract involves 9 000 filter bags. The delivery must be at site latest 1.3.2013. Se udbuddet »
2012-09-06   DeNOx catalysts for power plants (DONG Energy Thermal Power A/S)
High dust DeNOx catalysts (modules) for Avedøre power plant unit 1 and the Esbjerg power plant unit 3. Se udbuddet »
Nævnte leverandører: Johnson Matthey Catalysts (Germany) GmbH
2012-08-30   HEV steam turbine and generator major overhaul (DONG Energy Thermal Power A/S)
The 89 MW BBC single cylinder steam turbine was commissioned in 1982. It operates at a live steam pressure of 115 bar at 525°C. The steam flow is 120 kg/s. It’s at back pressure turbine supplying district heating to the city of Herning. The generator is an air/water cooled BBC type wx18L-083LLT of 111 MVA/50Hz. Se udbuddet »
2012-08-17   Supply, erection and commissioning of Combustion air fans/booster for Studstrup 4000 MW plants (DONG Energy Thermal Power A/S)
Supply, erection and commisioning of Combustion air fans/booster air fans for the purpose of converting a fossil fueled power plant into biomass fired power plants. The power plant are in size of several hundred MW. The 4 mills are capable of grinding biomass pellets down to a particle size that allows the biomass to be used as fuel in suspension fired boilers. Each mill has a capacity of 46 tonnes pr. hour. Se udbuddet »
Nævnte leverandører: Howden Turbowerke GmbH
2012-08-17   Supply, erection and commissioning of bypass flue gas duct for Studstrup 400 MW power plant (DONG Energy Thermal Power A/S)
Bypass flue gas duct. — Supply, erection, commissioning and bypass of DeSox plant including dampers for the purpose of converting a fossil fueled power plant into biomass fired power plant. The power plant are in the size of several hundred MW. Se udbuddet »
Nævnte leverandører: Alstom Danmark A/S