2018-01-05HBS Standard 3 Upgrade — Hold Baggage Screening System (HBSS) (Copenhagen Airports A/S)
The HBSS supplier is required to provide ECAC Standard 3 EDS Machines and associated infrastructure as is required for the Project.The BHS Portion of the works will be supplied by others. The EDS machines shall be installed in 3 locations:
— 4 machines in baggage factory 2,
— 3 machines in the terminal 3 Basement,
— 2 machines in the baggage factory 3.
In addition, the HBSS contractor shall provision:
— 20 HBS level 2 operator workstations,
— 4 HBS level 3 workstations,
— 6 training workstations,
— 2 TIP …
Se udbuddet » Nævnte leverandører:Rapiscan Systems
2017-12-15HBS Standard 3 Upgrade - Baggage Handling System (BHS) (Copenhagen Airports A/S)
The Contractor is required to provide a Baggage Handling System (BHS) upgrade to facilitate the installation of ECAC Standard 3 EDS Machines (supplied and installed by others). The new machines will be installed in 3 locations:
— 4 machines in Bag Factory 2,
— 3 machines in the Terminal 3 basement
— 2 machines in the Bag Factory 3
The existing BHS system will be modified as indicated by the tender drawings in order to accomplish the installation of these new machines, including a re-build of the existing …
Se udbuddet »
2014-12-02Renovation of Runway 04R/22L including side extension of shoulders (Copenhagen Airports A/S)
The contract covers renovation of Runway 04R/22L including side extension of the shoulders.
The construction work approximately includes the following:
— Asphalt pavement 15 000 - 20 000 tons,
— Asphalt milling 150 000 m²,
— Rainwater drainage 5 500 m pipe and 100 wells,
— Soil and tarrain work 90 000 - 110 000 m³,
— Gravel work 20 000 - 35 000 m³,
— Electrical works.
Se udbuddet » Nævnte leverandører:Per Aarsleff A/S
2014-02-05Pier C Extension 2015 (Copenhagen Airports A/S)
The extension of Pier C will provide bridge served aircraft stands to three gates for the long-haul air traffic. A small part of the building will consist of technical rooms on apron. The first floor is the primary passenger area. The extension will be connected to the existing Pier C by a ramp leading over an airport traffic lane. The necessary demolition and adjustment of existing facility is a part of the project. The second floor will consist of a technical area and a corridor for arriving non EU …
Se udbuddet »
2012-03-08CPH long term capacity plan. Planning and technical consultancy (Copenhagen Airports A/S)
CPH is working on a development plan for terminal expansion of Copenhagen Airport.
The master plan involves terminals (incl. baggage facilities, commercial areas etc.), airfield development incl. Infrastructure for stands/gates, infrastructure for landside access to the airport (curbside, trains, metro, roads etc.), as well as support functions (hangars, utilities etc.).
Planning and technical consulting is required to define and analyse options for development of terminals, airfield, landside …
Se udbuddet » Nævnte leverandører:Ove Arup & Partners International Ltd.