Nordværk I/S - an environmental waste handling facility - is in need of a replacement of a generator and gearbox of the unit 4 at the WTE plant at Nordværk, Aalborg, Denmark. The generator of 23,5 MVA is driven by a steam turbine. The delivery will include a turn-key delivery of a new generator and gear box and auxiliary equipment. The steam turbine is not to be replaced.
Deadline
Fristen for modtagelse af bud var på 2023-05-05.
Indkøbet blev offentliggjort på 2023-03-31.
Objekt Omfanget af udbuddet
Titel: Replacement of Generator and Gearbox
Produkter/tjenester: Generatorer📦
Kort beskrivelse:
“Nordværk I/S - an environmental waste handling facility - is in need of a replacement of a generator and gearbox of the unit 4 at the WTE plant at Nordværk,...”
Kort beskrivelse
Nordværk I/S - an environmental waste handling facility - is in need of a replacement of a generator and gearbox of the unit 4 at the WTE plant at Nordværk, Aalborg, Denmark. The generator of 23,5 MVA is driven by a steam turbine. The delivery will include a turn-key delivery of a new generator and gear box and auxiliary equipment. The steam turbine is not to be replaced.
Nordværk I/S is an environmental waste handling facility. One of the methods of getting rid of waste, is a waste incinerator. For this purpose, Nordværk I/S has two lines. Furnace line 3 (unit 3) and furnace line 4 (unit 4). Furnace line 4 comprises a steam turbine connected through a planetary gear to a generator. The generator is a LDW from 2005 and has been in operation since then. In 2016, while the rotor was dismantled and sent to workshop for rewinding, a reversal of the star point was performed on the generator. In
this operation, the terminals and the star point were moved to the other end of the generator. The reasoning behind the reversal was that the stator was starting to suffer from severe partial discharge. This operation had positive effects on the partial discharge level. The generator's partial discharge level has been monitored since April 2017.
The level of partial discharge has now reached a level of intensity, where prolonged usage of the generator may cause economic consequences. I conjunction with the partial discharge, the generator's main terminal box is showing signs of heavy ozone contamination. This is visible on wires where some of the insulation is deteriorated and the metal in the main terminal box has layers of discoloration.
To avoid a critical, undue breakdown a replacement of the generator is required.
Further, the unit have a history of leakage current damages to the gear teeth, which have necessitated frequent and costly maintenance works to be carried out, and the rotating parts are getting closer to their end of life. On top of this, the future operating profile of the unit will differ from the original design basis. Thus, as part of the project of replacing the generator, the gear box must be replaced by a parallel shaft gear box.
The delivery will include a turn-key delivery of a new generator and gear box and auxiliary equipment. It includes removal of the old equipment, design, engineering and installation of the new equipment including necessary changes to and reallocations of foundations and sup-porting structures and piping systems. It includes testing and commissioning, and the interoperability of the complete unit must be guaranteed.
The delivery will include optional work as well. The optional work covers strategic spare parts and some back-up equipment and system set up.
Vis mere Kriterier for tildeling
Kvalitetskriterium (navn): Quality of the Scope of Work
Kvalitetskriterium (vægtning): 30
Kvalitetskriterium (navn): Time Schedule
Kvalitetskriterium (vægtning): 15
Kvalitetskriterium (navn): Reusage of existing facility
Kvalitetskriterium (vægtning): 5
Pris (justeringskoefficient): 50
Kontraktens, rammeaftalens eller det dynamiske indkøbssystems varighed
Nedenstående tidsramme er udtrykt i antal måneder.
Beskrivelse
Varighed: 24
Oplysninger om begrænsningerne i antallet af ansøgere, der kan indbydes
Påtænkt antal ansøgere: 3
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
“From the applicants, who fulfill the minimum requirement for economic and financial standing and are not subject to any of the grounds of exclusions,...”
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
From the applicants, who fulfill the minimum requirement for economic and financial standing and are not subject to any of the grounds of exclusions, Nordværk will select 3 applicants, who will be invited to submit a tender.
The selection will be based on the technical and professional ability of the applicant.
The selection will be based on Nordværk's assessment of which of the applicants who have the most relevant references, as understood by Nordværk as:
- The better the similarity to the Scope of Work
- The more recent references
- References that comply to Commision Regulation (EU) 2016/631 of 14 april 2016 establishing a network code on requirements for grid connection of generators (RFG)
Vis mere Oplysninger om valgmuligheder
Indstillinger ✅
Beskrivelse af mulighederne:
“The delivery will include optional work as well. The optional work covers spare parts, strategic spare parts, service agreement, back-up automatic voltage...”
Beskrivelse af mulighederne
The delivery will include optional work as well. The optional work covers spare parts, strategic spare parts, service agreement, back-up automatic voltage regulator system, back up generator protection system and continuous online partial discharge measurement. The optional work will not be a part of the evaluation.
Juridiske, økonomiske, finansielle og tekniske oplysninger Økonomisk og finansiel stilling
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The applicant must inform the following regarding economic and financial standing:
- Solvency ratio, which is defined as (Equity/Total Assets) x 100% , in...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The applicant must inform the following regarding economic and financial standing:
- Solvency ratio, which is defined as (Equity/Total Assets) x 100% , in the Last Fiscal Year (LFY).
“Nordværk I/S has the following minimum requirements regarding the economic and financial standing of the
applicant:
- A solvency ratio of minimum 10% in the...”
Nordværk I/S has the following minimum requirements regarding the economic and financial standing of the
applicant:
- A solvency ratio of minimum 10% in the Last Fiscal Year (LFY).
Vis mere Teknisk og faglig kompetence
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The applicant must inform the following regarding technical and professional ability:
- References:
List of relevant references describing the applicant's...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The applicant must inform the following regarding technical and professional ability:
- References:
List of relevant references describing the applicant's experience from similar projects and scope.
The Applicant must provide references from similar projects understood as a project with delivery and installation of generator and gear, covering the full scope of work and responsibility including all needed services (design, engineering, erection and installation, test and commissioning).
The Applicant is encouraged to inform whether the reference comply to Commision Regulation (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of generators (RFG) or not.
Vis mere Betingelser for deltagelse
Betingelser for deltagelse (tekniske og faglige kvalifikationer):
“Nordværk I/S has the following minimum requirements regarding references:
- Tenderer shall document a minimum of one (1) references from similar projects,...”
Betingelser for deltagelse (tekniske og faglige kvalifikationer)
Nordværk I/S has the following minimum requirements regarding references:
- Tenderer shall document a minimum of one (1) references from similar projects, that are no older than eight (8) years dated from 01/03-2023.
- The reference statements must include year of execution, Scope of Work and responsibilities of the Applicant, contact information of the client.
Procedure Type af procedure
Forhandlet procedure med forudgående indkaldelse af konkurrencer
Administrative oplysninger
Frist for modtagelse af bud eller ansøgninger om deltagelse: 2023-05-05
23:59 📅
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: dansk 🗣️
Nedenstående tidsramme er udtrykt i antal måneder.
Minimumsfrist, inden for hvilken tilbudsgiveren skal opretholde tilbuddet: 3
Supplerende oplysninger Yderligere oplysninger
“As a precondition for an applicant to be declared eligible to undertake the Contract, the applicant must submit a completed and dated ESPD (European Single...”
As a precondition for an applicant to be declared eligible to undertake the Contract, the applicant must submit a completed and dated ESPD (European Single Procurement Document), which must contain the following:
1 Information about the applicant, information about the representatives of the applicant, information about reliance on the capacities of other entities (if any) and information concerning subcontractors on whose capacity the economic operator does not rely (if any)
2 Information about the applicant not being subject to the grounds of exclusion in section 134a-136 of The Public Procurement Act
3 Information about the economic and financial standing of the applicant
4 Information about the technical and professional ability of the applicant
Please notice, if the applicant is a consortium all members of the consortium must complete and submit a separate ESPD with the information listed above.
Regarding the minimum requirements this must be fulfilled by the consortium as a whole.
In relation to the selection among applicants Nordværk I/S will make an assessment of the overall suitability of the consortium.
Please notice, if the applicant rely on the capacity of one or more third parties regarding economic and financial standing and/or technical and professional ability those third parties must complete and submit a separate ESPD with the information listed above, including the information regarding the conditions of which the applicate rely on.
Vis mere Gennemgå organ
Navn: Klagenævnet for udbud
Postadresse: Toldboden 2
Postby: Viborg
Postnummer: 8800
Land: Danmark 🇩🇰
Telefon: +45 72405708📞
E-mail: klfu@naevneneshus.dk📧
URL: https://erhvervsstyrelsen.dk/klagenaevnet-for-udbud🌏 Gennemgangsprocedure
Præcise oplysninger om fristerne for gennemgangsprocedurer:
“Pursuant to the Act on the Complaints Board for Tenders, the following deadlines apply for the submission of an appeal:
Complaints about not having been...”
Præcise oplysninger om fristerne for gennemgangsprocedurer
Pursuant to the Act on the Complaints Board for Tenders, the following deadlines apply for the submission of an appeal:
Complaints about not having been pre-qualified must be submitted to the Complaints Board for Tenders within 20 calendar days from the day after sending a notification to the affected applicants about who has been selected when the notification is accompanied by a justification for the decision. In other situations, a complaint about a tender must be submitted to the Complaints Board for Tenders before:
1) 45 calendar days after the contracting entity has published a notice in the Official Journal of the European Union stating that the contracting entity has entered into a contract. The deadline is calculated from the day after the day on which the executive order has been published.
2) 30 calendar days from the day following the day on which the contracting authority notifies the tenderers concerned that a contract based on a framework agreement reopening the competition or a dynamic purchasing system has been concluded, if the notification has stated a reason for the decision.
3) six months after the contracting authority has entered into a framework agreement calculated from the day after the day on which the contracting authority has notified the affected applicants and tenderers.
4) 20 calendar days calculated from the day after the contracting authority has announced its decision.
At the latest at the same time as a complaint is submitted to the Complaints Board for Tenders, the complainant must notify the contracting authority in writing that a complaint is submitted to the Complaints Board for Tenders, and whether the complaint has been submitted during the standstill period. In cases where the complaint has not been submitted during the standstill period, the complainant must also state whether a suspensive effect is requested of the complaint.
The Complaints Board for the E-mail Address of the Tender is specified in section VI.4.1).
The Complaints Guide from the Complaints Board for Tenders can be found on the Complaints Board's website.
Vis mere Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence- og Forbrugerstyrelsen
Postadresse: Carl Jacobsens Vej 35
Postby: Valby
Postnummer: 2500
Land: Danmark 🇩🇰
Telefon: +45 41715000📞
E-mail: kfst@kfst.dk📧
URL: www.kfst.dk🌏
Kilde: OJS 2023/S 068-204176 (2023-03-31)