DTU Physics has a group investigating the interaction of materials with solutions and gases, in the presence and absence of organic compounds. The work aims to understand and control reactions such as dissolution of the materials and the nucleation of secondary phases on the solid surfaces. For this work, we need an atomic force microscope, that is flexible, to allow developments in hardware and software. We require ultrafast scanning, as well as the classical slow and fast scanning, because many of the reactions are rapid. Routine atomic scale resolution is essential, as well as micrometre scale mapping, with a number of approaches that are available using a rapidly oscillating cantilever, including chemical force mapping. Fluid and gas cells, control of temperature and humidity will allow in situ experiments. Reliability of operation and cooperative arrangements for instrument and software modification, repair and maintenance are important.
Deadline
Fristen for modtagelse af bud var på 2022-04-26.
Indkøbet blev offentliggjort på 2022-03-18.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Udbudsbekendtgørelse (2022-03-18) Objekt Omfanget af udbuddet
Titel: Laboratorieudstyr, optisk udstyr og præcisionsudstyr (ikke briller)
Kort beskrivelse:
DTU Physics has a group investigating the interaction of materials with solutions and gases, in the presence and absence of organic compounds. The work aims to understand and control reactions such as dissolution of the materials and the nucleation of secondary phases on the solid surfaces. For this work, we need an atomic force microscope, that is flexible, to allow developments in hardware and software.
We require ultrafast scanning, as well as the classical slow and fast scanning, because many of the reactions are rapid. Routine atomic scale resolution is essential, as well as micrometre scale mapping, with a number of approaches that are available using a rapidly oscillating cantilever, including chemical force mapping. Fluid and gas cells, control of temperature and humidity will allow in situ experiments. Reliability of operation and cooperative arrangements for instrument and software modification, repair and maintenance are important.
DTU Physics has a group investigating the interaction of materials with solutions and gases, in the presence and absence of organic compounds. The work aims to understand and control reactions such as dissolution of the materials and the nucleation of secondary phases on the solid surfaces. For this work, we need an atomic force microscope, that is flexible, to allow developments in hardware and software.
We require ultrafast scanning, as well as the classical slow and fast scanning, because many of the reactions are rapid. Routine atomic scale resolution is essential, as well as micrometre scale mapping, with a number of approaches that are available using a rapidly oscillating cantilever, including chemical force mapping. Fluid and gas cells, control of temperature and humidity will allow in situ experiments. Reliability of operation and cooperative arrangements for instrument and software modification, repair and maintenance are important.
Bekendtgørelsens metadata
Originalsprog: engelsk 🗣️
Dokumenttype: Udbudsbekendtgørelse
Kontraktens art: Varer
Forordning: Den Europæiske Union, med deltagelse af GPA-lande
Fælles glossar for offentlige kontrakter (CPV)
Kode: Laboratorieudstyr, optisk udstyr og præcisionsudstyr (ikke briller)📦
Yderligere CPV-kode: Måleudstyr📦 Sted for udførelsen
NUTS-region: Hovedstaden
🏙️
Procedure
Procedureform: Offentligt udbud
Bud-type: Indsendelse gældende for alle delaftaler
Kriterier for tildeling
Den laveste pris
DTU Physics has a group investigating the interaction of materials with solutions and gases, in the presence and absence of organic compounds. The work aims to understand and control reactions such as dissolution of the materials and the nucleation of secondary phases on the solid surfaces. For this work, we need an atomic force microscope, that is flexible, to allow developments in hardware and software.
DTU Physics has a group investigating the interaction of materials with solutions and gases, in the presence and absence of organic compounds. The work aims to understand and control reactions such as dissolution of the materials and the nucleation of secondary phases on the solid surfaces. For this work, we need an atomic force microscope, that is flexible, to allow developments in hardware and software.
We require ultrafast scanning, as well as the classical slow and fast scanning, because many of the reactions are rapid. Routine atomic scale resolution is essential, as well as micrometre scale mapping, with a number of approaches that are available using a rapidly oscillating cantilever, including chemical force mapping. Fluid and gas cells, control of temperature and humidity will allow in situ experiments. Reliability of operation and cooperative arrangements for instrument and software modification, repair and maintenance are important.
We require ultrafast scanning, as well as the classical slow and fast scanning, because many of the reactions are rapid. Routine atomic scale resolution is essential, as well as micrometre scale mapping, with a number of approaches that are available using a rapidly oscillating cantilever, including chemical force mapping. Fluid and gas cells, control of temperature and humidity will allow in situ experiments. Reliability of operation and cooperative arrangements for instrument and software modification, repair and maintenance are important.
Anslået samlet værdi: 3 000 000 DKK 💰
Anslået værdi uden moms: 3 000 000 DKK 💰
Varighed: 24 måneder
Beskrivelse af mulighederne:
Gas cell; heat and cool (see requirement 1.15 in Appendix 2)
Service technician on-site – Price per. Hour (see requirement 3.5 in Appendix 2)
Sted for udførelsen
Hovedsted eller sted for udførelsen: DTU, Kgs. Lyngby
Procedure
Retsgrundlag: 32014L0024
Tidspunkt for modtagelse af tilbud: 10:00
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Tilbuddets gyldighedsperiode: 6 måneder
Dato for åbning af tilbud: 2022-04-26 📅
Tidspunkt for åbning af tilbud: 10:00
Supplerende oplysninger Gennemgå organ
Navn: Klagenævnet for Udbud
Postadresse: Nævnenes hus, Toldboden 2
Postby: Viborg
Postnummer: 8800
Land: Danmark 🇩🇰
Telefon: +45 35291000📞
E-mail: klfu@erst.dk📧
Internetadresse: http://www.klfu.dk🌏
Oplysninger om frister for klageprocedurer:
Complaint regarding prequalification:
Complaint regarding prequalification must be submitted no later than 20 calendar days after notification has been sent to the concerned Candidates informing them who has been selected, if the notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 1.
Complaint regarding prequalification must be submitted no later than 20 calendar days after notification has been sent to the concerned Candidates informing them who has been selected, if the notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 1.
Complaint regarding award of contract:
Complaint regarding the award of a contract must be submitted no later than 45 calendar days from the date after the Contracting Authority has published a notice in the European Union Official Journal informing that the Contracting Authority has awarded/concluded a contract, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 2, no. 1.
Complaint regarding the award of a contract must be submitted no later than 45 calendar days from the date after the Contracting Authority has published a notice in the European Union Official Journal informing that the Contracting Authority has awarded/concluded a contract, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 2, no. 1.
Complaint regarding award of a contract under a framework agreement with a reopening of the competition (mini-tender):
Complaint regarding the award of a contract under a framework agreement with a reopening of the competition must be submitted no later than 30 calendar days from the date after the Contracting Authority has notified the concerned Tenderers that a contract based on a framework agreement with a reopening of the competition has been awarded/concluded, if the notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 2, no. 2.
Complaint regarding the award of a contract under a framework agreement with a reopening of the competition must be submitted no later than 30 calendar days from the date after the Contracting Authority has notified the concerned Tenderers that a contract based on a framework agreement with a reopening of the competition has been awarded/concluded, if the notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 2, no. 2.
Complaint regarding the award of a framework agreement:
Complaint regarding the award of a contract must be submitted no later than 6 months from the date after the Contracting Authority has notified the concerned Candidates and Tenderers that a framework agreement has been concluded, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 2, no. 3.
Complaint regarding the award of a contract must be submitted no later than 6 months from the date after the Contracting Authority has notified the concerned Candidates and Tenderers that a framework agreement has been concluded, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 2, no. 3.
Complaint regarding direct award of contract:
Complaint that the Contracting Authority, contrary to the Public Procurement Act, has concluded a contract without prior publication of a contract notice in the European Union Official Journal must be submitted no later than 30 calendar days from the date after a contract award notice has been published by the Contracting Authority in the European Union Official Journal and that contract award notice includes the grounds for the decision to award the contract directly, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, section 3.
Complaint that the Contracting Authority, contrary to the Public Procurement Act, has concluded a contract without prior publication of a contract notice in the European Union Official Journal must be submitted no later than 30 calendar days from the date after a contract award notice has been published by the Contracting Authority in the European Union Official Journal and that contract award notice includes the grounds for the decision to award the contract directly, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, section 3.
Compliant regarding public procurements below the EU threshold:
Complaint regarding violation of public procurements below the EU threshold must be submitted no later than 45 calendar days from the date after the Contracting Authority has notified the Tenderers about the award of contract, if this notification includes the grounds for the decision; and no later than 6 months from the date after the Contracting Authority has notified the concerned Candidates and Tenderers that a framework agreement has been concluded, if the notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, section 4, no. 1 and 2. Compliant regarding prequalification on procurement below the EU threshold must be submitted no later than 20 calendar days from the date after the Contracting Authority has sent a notification to the concerned Candidates who has been selected and this notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders)) § 7, Section 5.
Complaint regarding violation of public procurements below the EU threshold must be submitted no later than 45 calendar days from the date after the Contracting Authority has notified the Tenderers about the award of contract, if this notification includes the grounds for the decision; and no later than 6 months from the date after the Contracting Authority has notified the concerned Candidates and Tenderers that a framework agreement has been concluded, if the notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, section 4, no. 1 and 2. Compliant regarding prequalification on procurement below the EU threshold must be submitted no later than 20 calendar days from the date after the Contracting Authority has sent a notification to the concerned Candidates who has been selected and this notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders)) § 7, Section 5.
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence- og Forbrugerstyrelsen
Postadresse: Carl Jacobsens Vej 35
Postby: Valby
Postnummer: 2500
Telefon: +45 41715000📞
E-mail: kfst@kfst.dk📧
Internetadresse: http://www.kfst.dk🌏
Kilde: OJS 2022/S 058-151330 (2022-03-18)
Bekendtgørelse om indgåede kontrakter (2022-06-28) Objekt Omfanget af udbuddet
Den samlede værdi af udbuddet: 452 050 EUR 💰
Bekendtgørelsens metadata
Originalsprog: dansk 🗣️
Dokumenttype: Bekendtgørelse om indgåede kontrakter