Nylige indkøb, hvor leverandøren Ammongas A/S er nævnt
2022-01-21CO2 capture and conversion demonstration plant (Danmarks Tekniske Universitet - DTU)
As part of the Horizon 2020 project ConcenCUS, a mobile CO2 capture and conversion demonstration plant must be built and operated on site at industrial partners in Denmark, Romania and Greece. DTU is responsible for the production and demonstration of the plant, and now needs a process engineering supplier for specific tasks within design, production and commissioning of the plant.
Se udbuddet » Nævnte leverandører:Ammongas A/S
2015-09-25Framework agreement for Biogas Upgrading Plants (NGF Nature Energy Biogas A/S)
The Tenderers of BUPs are to provide their standard (off-the-shelf) Biogas Upgrading Plants (BUP) in the nominal capacity range of 200-5 000 Nm³/h of raw biogas volumetric flow rate at normal conditions (0 °C at 1 013 mbar) under Framework Agreement NE-FWA005-2015. The BUPs shall all be located in Denmark, but the exact number of BUPs and their location is not yet decided. This is subject to, amongst other, the number of biogas plants that will be developed in Denmark and their commercial rate of return …
Se udbuddet » Nævnte leverandører:Ammongas A/S