2013-12-20   Rock-dump around the 4 piers for Little Belt Bridge of 1935 (Banedanmark)
The geotechnical stability of the four offshore piers of the Little Belt Bridge of 1935 has to be improved. The strengthening of the piers is to be carried out by dumping rocks round the piers. The strengthening project is yet to be planned in detail, however preliminary analyses suggest that approximately 125,000 m³ of rocks are to be dumped around the four main piers of the bridge in embankments of up to 7 m thickness. The dumping of rocks must follow a schedule which will be specified in the tender … Se udbuddet »
Nævnte leverandører: Aarsleff-VG J.V. I/S