2021-02-02Outdoor Wood Chip Storage for AMV4 Lot M1 Mechanical (HOFOR A/S)
Outdoor wood chip storage for AMV4. The contract concerns the design, production and erection of outdoor wood chip storage with conveyer system for AMV4 — Mechanical part. The installations shall be integrated with existing systems at Amagerværket.
Se udbuddet »
2020-12-21Lot D: Wood Chips Reception and Storage for DIN Forsyning Varme A/S (DIN Forsyning Varme A/S)
This invitation to tender concerns the procurement of Lot D: Wood chips reception and storage for DIN Forsyning Varme A/S. The invitation to tender is implemented as a negotiated procedure in accordance with the procedure laid down in Art. 47 in The Utilities Directive, Directive 2014/25/EU of 26. February 2014 and consists of a pre-qualification phase, an initial tendering phase and a negotiation phase with subsequent submission of final tenders.
Se udbuddet » Nævnte leverandører:Lachenmeier Monsun A/SPersolit Entreprenørfirma A/S
2020-08-24AMV4 – Disponibelt flislager, entreprise B1, konstruktion og anlægsarbejder (HOFOR A/S)
Kontrakten omhandler produktion, levering og udførelse/montage af konstruktioner for udendørs disponibelt lager for flis på Amagerværket, herunder bl.a.:
- Etablering, drift og vedligeholdelse af byggeplads for egne arbejder og for entreprise M1 og E1, E2
- Jordarbejder
- Pæleramning
- Belægningsarbejder
- Afvandingsarbejder
- Kablerør, brønde og øvrige ledningsarbejder
- Beton og stålkonstruktioner for el-bygning og bufferlager samt støttevæg
- Fundering for transportbånd
- Facadebeklældning og …
Se udbuddet »
2020-08-11Outdoor Wood Chip Storage for AMV4 (1) (HOFOR A/S)
Outdoor wood chip storage for AMV4. The contract concerns the design, production and erection of outdoor wood chip storage with conveyer system for AMV4. The installations shall be integrated with existing systems at Amagerværket.
Se udbuddet »
2020-07-16Hillerød Dampværk - Dampværk (M-01) (Hillerød Kraftvarme ApS)
Hillerød Forsyning planlægger at bygge og drifte et dampanlæg til produktion af procesdamp til nærliggende biotekvirksomheder og til fjernvarmenettet. Dette udbud indeholder M01 – dampanlæg. Mekanisk udstyr til produktion af damp og varme baseret på biomasse og elektriske kedler.
Se udbuddet »
2020-07-14Outdoor Wood Chips Storage for AMV4 (HOFOR A/S)
Outdoor wood chips storage for AMV4. The contract concerns the design, production and erection of outdoor wood chip storage with conveyer system for AMV4. The installations shall be integrated with existing systems at Amagerværket.
Se udbuddet »
2018-03-06Fornyelse af Helsingør Kraftvarmeværk (HØK) - Prøveudtagning - LOT 5Q (ii) (Cowi a/s)
"Helsingør Kraftvarmeværk A/S ønsker at forny det eksisterende kraftvarmeværk ved at opføre en ny biomassefyret kedel, som placeres i umiddelbar nærhed af det eksisterende kraftvarmeværk på Energivej 19, DK-3000 Helsingør. Brændslet til det nye anlæg er træflis, som ankommer i lastbiler. Til analyse af brændslet skal der etableres et automatisk prøveudtagningsanlæg, der kan tage repræsentative prøver af træflis fra alle indkommende lastbiler.
Denne leverance omfatter design, projektering, produktion, …
Se udbuddet » Nævnte leverandører:TOMCA AB
2014-06-12SKV40 Wood Chips-stack (DONG Energy Thermal Power A/S)
Dong Energy Thermal Power is planning to implement district heating production based on biofuels through erection of a number of wood-chip boilers, providing steam for existing steam turbine and/or stand-alone district heating condensor. Two boilers are envisaged as an add-on to the existing gas fired plant, Skærbækværket. The new biomass fired boilers shall deliver up to 320 MW heat to the district heating system. It is envisaged that the new boiler plant shall have a capacity of maximum 280 MW and the …
Se udbuddet » Nævnte leverandører:VL Staal A/S
2012-12-19LOT M1: Continuous Ship Unloader (CSU) for wood pellets; LOT M2: Transport and silo discharge equipment for wood... (Vattenfall A/S)
The purchase will be divided into four (4) different lots as described in the following. These may either be ordered as four (4) separate contracts or be freely combined into common contracts.
LOT M1: Continuous Ship Unloader (CSU) for wood pellets.
Supply of one Continuous Ship Unloader (CSU) for wood pellets at Amager Power Station located in the city of Copenhagen.
The supply includes engineering, purchase, manufacturing, installation, commissioning, testing and documentation of one Continuous Ship …
Se udbuddet »
2012-08-31Flue gas cooler for a biomass co-firing plant for wood pellets (Vattenfall A/S)
The supply includes a flue gas cooler including ducts to be installed at an existing coal fired power plant located at Nordjyllandsværket in the city of Aalborg.
The flue gas cooler will be established as a part of a biomass co-firing project.
The supply includes process design and mechanical design incl. CFD calculations, manufacturing, supply, installation, testing and commissioning. The flue gas cooler shall have a thermal capacity of 25 MW and shall be connected to the existing flue gas ducts in …
Se udbuddet »
2012-05-23Modification of burners for a biomass co-firing plant for wood pellets (Vattenfall A/S)
The supply includes modification of existing coal fired burners for a biomass co-firing plant for wood pellets located at Nordjyllandsværket in the city of Aalborg.
The supply includes design, manufacturing, supply, installation, testing and commissioning of modifications of four existing coal dust burners at the unit 3 at Nordjyllandsværket in the city of Aalborg. The unit 3 is an 845 MW thermal super critical coal dust fired boiler with sixteen burners where four burners shall be modified to be able to …
Se udbuddet »
2012-05-23Transport and storage equipment for a biomass co-firing plant for wood pellets (Vattenfall A/S)
The purchase will be divided into two different lots as described in the following. These may either be ordered as two separate contracts or as one common contract.
LOT no. 1: Wood pellet receiving and transport equipment.
The supply includes a wood pellet receiving facility and transport equipment for a biomass co-firing plant for wood pellets located at Nordjyllandsværket in the city of Aalborg.
The supply includes design, manufacturing, supply, installation, testing and commissioning of a wood pellet …
Se udbuddet »
2012-04-26Flue gas dedusting filter for biofuel boiler at a CHP in the city of Køge (VEKS, Vestegnens Kraftvarmeselskab I/S)
Mechanical and electrical works for conversion electrostatic precipitator (ESP) to fabric filter (FF). The plant is burning wood chips and saw dust in a grate boiler.
Lot 1: removal of internals from ESP - unit 7, design, construction, manufacturing, erection and commissioning new internals for fabric filtration in the ESP casing. The unit has a capacity of 46, MW thermal. The flue gas is lead from the filter through 2 existing ID-fans to the chimney. Fly ash will be handled in existing systems.
Lot 2: …
Se udbuddet »
2011-09-28Transport and storage equipment for a biomass co-firing plant for wood chips (Vattenfall A/S)
The supply includes design, manufacturing, supply, installation, testing and commissioning of wood chip receiving facilities, transport and storage equipment for a biomass co-firing plant for wood chips located at Nordjyllandsværket in the city of Aalborg.
The supply includes design, manufacturing, supply, installation, testing and commissioning of an A-type wood chip storage with a capacity of 150 000 m³ including unloading facilities for receiving wood chips from wood chip and bulk carriers and a …