2014-11-14   M-01 Mill-, Burner- and PA-systems (DONG Energy Thermal Power A/S)
The scope of work is related to DONG Energy's conversion of Avedøre Power Station, unit 1, from coal firing to 100 % wood pellets operation, while maintaining the present option of using coal. The present tender covers modification of mill and burner system, primary air system and installation of water soot blower. The modification of the mill and burner systems includes: — Modification of existing coal mills, including installation of explosion suppression system. — Necessary modifications to existing … Se udbuddet »
Nævnte leverandører: MH Power Systems Europe GmbH
2012-12-19   LOT M1: Continuous Ship Unloader (CSU) for wood pellets; LOT M2: Transport and silo discharge equipment for wood... (Vattenfall A/S)
The purchase will be divided into four (4) different lots as described in the following. These may either be ordered as four (4) separate contracts or be freely combined into common contracts. LOT M1: Continuous Ship Unloader (CSU) for wood pellets. Supply of one Continuous Ship Unloader (CSU) for wood pellets at Amager Power Station located in the city of Copenhagen. The supply includes engineering, purchase, manufacturing, installation, commissioning, testing and documentation of one Continuous Ship … Se udbuddet »
2012-05-23   Modification of coal mill and dosing bin for a biomass co-firing plant for wood pellets (Vattenfall A/S)
The supply includes a dosing bin and modification of an existing coal mill for milling wood pellets for a biomass co-firing plant located at Nordjyllandsværket in the city of Aalborg. Se udbuddet »