2022-03-07Framework Agreement on purchase and renovation of Gas Turbine Meters (Energinet Forretningsservice A/S)
Through the establishment of the present Framework Agreement Energinet wants to purchase new gas turbine meters and renovations for our biogas stations. For further information see Appendix 2: Scope of Works. The procurement is conducted as a negotiated procedure and the Framework Agreement will be entered with one provider for the duration of 8 years.
Se udbuddet »
2017-02-03Framework agreement for Gas Flow Meters (Energinet.dk)
The Contracting authority wants to purchase Gas Flow Meters for both Energinet.dk and Dansk Gas Distribution. The Contracting authority wishes to purchase gas flow meters on 2 lots with 1 supplier for each lot. The Framework agreement is divided into 2 lots.
For lot 2 the object of this framework agreement is to purchase the following type of meters: Diaphragm meters for Dansk Gas Distribution.
Se udbuddet » Nævnte leverandører:Elster-Instromet A/S
2015-10-08HØK — Renewal of CHP plant — Helsingør (Helsingør Kraftvarmeværk A/S)
The existing natural gas fired combined cycle unit was built in 1993 and has an electricity output of 60 MW and district heating output of 60 MW. The configuration is a single shaft arrangement with a gas turbine with HRSG, a steam turbine and 1 generator in common for the gas turbine and steam turbine.
The combined cycle unit shall be modified in order to use the existing steam turbine and generator without operating the gas turbine, i.e. by steam supply to the steam turbine from the new bio-mass …