2013-04-19Major overhaul of generator at Kyndby Power Plant unit 22 (DONG Energy Thermal Power A/S)
Major overhaul of a 307 MVA static excitation generator, including stator core and rotor repair. The scope includes all mechanical engineering, services and tests. The planned outage for finalizing the the scope is 5 weeks. The time period is expected to be in calendar week 36-42, 2013.
Se udbuddet »
2013-03-07New generator for the waste treatment facility in Esbjerg (L90)
A new approx. 25MVA generator to replace the existing generator at the waste-to-energy facility L90 in Esbjerg. Furthermore all mechanical and electrical installation work, control and monitoring systems and all necessary auxiliary systems shall be included.
Se udbuddet »
2012-12-21Major overhaul of generator at Avedøre power plant unit 2 (DONG Energy Thermal Power A/S)
Major overhaul of a 565 MVA static excitation generator, including stator core and rotor repair. The scope includes all mechanical and electrical engineering, services and tests. The planned outage for finalizing the scope is 5 weeks. The time period is expected to be in calendar week 26-30, 2013.
Se udbuddet »
2012-09-25Conversion of ENV3 to Synchronous Condenser Unit (DONG Energy Thermal Power A/S)
Modification of an existing 33 year old steam turbine driven 50 Hz, 850 MVA generator in order to allow it to be operated as a synchronous condenser at 150 kV level. The work involves design, manufacturing, erection and commissioning of the modification among others involving separation of steam turbine rotor and generator rotor, implementation of a thrust bearing, modification of generator radial bearing concept and implementation of a starting device (motor or static starting device) capable of running …
Se udbuddet »
2011-05-17Mechanical and electrical technology supplies for a new combined heat and power producing waste incineration line in... (I/S Nordforbrænding)
Mechanical and electrical works for a new combined heat and power producing waste incineration line with a capacity of 10 tonnes waste per hour, with one common turbine/generator system.
The waste incineration line is based on a moving grate concept, steam boiler with SNCR, followed by semi-dry flue gas treatment, including electrical system, control and monitoring system and all necessary auxiliary systems.
The works are divided in 3 lots:
Lot A: one waste incineration unit including incinerator based …
Se udbuddet »