2020-12-07Shore Power System in the Port of Aarhus (Port of Aarhus)
This contract includes the delivery of a DS/IEC/IEEE 80005 compliant Shore Power System (SPS) in the Port of Aarhus, Denmark. The SPS supply one ship at a time at a specific berth at Polensgade, Aarhus C. The cruise ship terminal in question can accept ships with a size of up to approx. 300 m LOA. The contract includes: converter station, Medium voltage underground cabling between SPS and connection boxes, mobile cable management device, training of personal etc., see furthermore section II.2.4).
Se udbuddet » Nævnte leverandører:PowerCon A/S