This Tender concerns a Contract for the design, engineering, manufacturing/procurement, installation, testing, commissioning and trial operation of a complete Sorting Line for the new sorting and recycling Plant that will be constructed on the new site in Fredericia (Jutland), Denmark. The primary function of the Sorting Line is to sort and bale Compacted Beverage Packaging of ALU and PET.
Deadline
Fristen for modtagelse af bud var på 2023-09-25.
Indkøbet blev offentliggjort på 2023-08-23.
Objekt Omfanget af udbuddet
Titel: Sorting Line for a new Production Plant
Produkter/tjenester: Industrimaskiner📦
Kort beskrivelse:
“This Tender concerns a Contract for the design, engineering, manufacturing/procurement, installation, testing, commissioning and trial operation of a...”
Kort beskrivelse
This Tender concerns a Contract for the design, engineering, manufacturing/procurement, installation, testing, commissioning and trial operation of a complete Sorting Line for the new sorting and recycling Plant that will be constructed on the new site in Fredericia (Jutland), Denmark. The primary function of the Sorting Line is to sort and bale Compacted Beverage Packaging of ALU and PET.
1️⃣
Yderligere produkter/tjenester: Industrimaskiner📦
Sted for udførelsen: Sydjylland🏙️
Hovedsted eller sted for udførelsen: DK-7000 Fredericia
Beskrivelse af udbuddet:
“This Tender concerns a Contract for the design, engineering, manufacturing/procurement, installation, testing, commissioning and trial operation of a...”
Beskrivelse af udbuddet
This Tender concerns a Contract for the design, engineering, manufacturing/procurement, installation, testing, commissioning and trial operation of a complete Sorting Line for the new sorting and recycling Plant that will be constructed on the new site in Fredericia (Jutland), Denmark. The primary function of the Sorting Line is to sort and bale Compacted Beverage Packaging of ALU and PET.
The Works shall include a:
- Receiving and storage system
- Sorting system
- Buffer and baling system
- Control and monitoring system
The execution of the Contract is divided into five phases, cf. Part III.c Contract Time Schedule and Payment Schedule:
- The design, engineering & manufacturing/procurement phase
- The installation on Site phase
- The testing & commissioning phase
- The trial operation phase
- The Guarantee Period
The Contract will be a turnkey contract, meaning the Sorting Line is to be delivered as a complete production facility ready to use.
DRS has described the principle and basic design of the Sorting Line on a functional basis and set out the technical specifications in Part IV (Scope of Work).
The Contractor is given the freedom to carry out the work in its chosen manner, provided that the result meets requirements set out by DRS in Part IV (Scope of Work).
The purpose of the tender and negotiation phase is to establish an appropriate framework for dialogue between DRS and the Tenderers regarding the Tenders (Preliminary and Revised Tenders) and the Tender Documents, cf. section 6 in the Tender Conditions. The dialogue in the negotiations should ensure that the Final Tenders meet DRS’ needs to the best possible extent, support effective competition and prevent misunderstandings and errors in the Tender Procedure. The tender and negotiation phase is sequential and begins with the submission of a Preliminary Tender. Based on the Preliminary Tender, DRS will initiate negotiations with the Tenderers in accordance with the guidelines set out below, see sections 9.4 to 9.6 in the Tender Conditions. DRS expects that there will be two rounds of negotiations (i.e. after the submission of Preliminary Tenders and after the submission of Revised Tenders). However, DRS reserves the right to award the Contract on the basis of the Preliminary Tenders or Revised Tenders without conducting further negotiations, cf. the Contract Notice. DRS also reserves the right to carry out additional rounds of negotiation, if this is deemed necessary.
Vis mere Kriterier for tildeling
Kvalitetskriterium (navn): Process and Technology
Kvalitetskriterium (vægtning): 24
Kvalitetskriterium (navn): Line Layout
Kvalitetskriterium (vægtning): 8
Kvalitetskriterium (navn): Project Approach
Pris (justeringskoefficient): 60
Omfanget af udbuddet
Anslået samlet værdi ekskl. moms: EUR 5 500 000 💰
Kontraktens, rammeaftalens eller det dynamiske indkøbssystems varighed
Nedenstående tidsramme er udtrykt i antal måneder.
Beskrivelse
Varighed: 41
Oplysninger om begrænsningerne i antallet af ansøgere, der kan indbydes
Påtænkt antal ansøgere: 5
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
“The selection will be based on the Candidates' references submitted in the ESPD. DRS will assess which Candidates have the most relevant experience (based...”
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
The selection will be based on the Candidates' references submitted in the ESPD. DRS will assess which Candidates have the most relevant experience (based on the criteria set out in section 8.3.3.2 of the Tender Conditions).
Vis mere Beskrivelse
Yderligere oplysninger:
“The Contract is not divided into lots due to the complexity of the Sorting Line. DRS needs one main contractor to design, engineer, manufacture/procure,...”
Yderligere oplysninger
The Contract is not divided into lots due to the complexity of the Sorting Line. DRS needs one main contractor to design, engineer, manufacture/procure, install, test, commission and trial operate a complete Sorting Line (turnkey contract).
Juridiske, økonomiske, finansielle og tekniske oplysninger Betingelser for deltagelse
“DRS has the following minimum requirements concerning the Candidates’ economic and financial standing:
- The Candidate must have equity of at least 1...”
DRS has the following minimum requirements concerning the Candidates’ economic and financial standing:
- The Candidate must have equity of at least 1 million EUR in the most recently submitted annual report (at the
time of the submission of the Prequalification Application).
- The Candidate must have a turnover of at least 10 million EUR on average for the past 3 financial years,
i.e. the three most recently submitted annual reports (at the time of the submission of the Prequalification
Application).
The Candidate must fill in the specifications to the above-mentioned minimum requirements in the following
fields in the ESPD, Part IV B: ‘Average yearly turnover’ and ‘Other economic or financial requirements’.
Vis mere
Betingelser for deltagelse (tekniske og faglige kvalifikationer):
“DRS has the following minimum requirements concerning the Candidates’ technical and professional ability:
- The Candidate must provide a minimum of three...”
Betingelser for deltagelse (tekniske og faglige kvalifikationer)
DRS has the following minimum requirements concerning the Candidates’ technical and professional ability:
- The Candidate must provide a minimum of three (3) and a maximum of five (5) references meeting the following minimum requirements:
- The references must concern ongoing or completed works within the past 3 years counted from the deadline for the submission of the Prequalification Application.
- The references must concern contracts relating to sorting facilities within the field of recycling, waste handling
or similar of equivalent scope and complexity to the Contract.
-- For at least one of the references, the Candidate must - as the main supplier - have performed works
according to the contract with a value of at least 3 million EUR.
- The references should contain a description of the contract, including i) the location of performance, ii) the time
of performance, iii) the scope, iv) name and title of the key personnel who participated in the performance of the
contract (not a CV) and v) the customers’ contact information, including contact person, email and telephone
number.
The Candidate must fill in the following fields in the ESPD, Part IV C: ‘For supply contracts: performance of
deliveries of the specified type’. The Candidate can add references by clicking the ‘+’ button. As an alternative,
the Candidate can make reference in the ESPD to a separate document(s) to the ESPD containing the
references as part of the Prequalification Application.
Moreover, DRS has the following minimum requirement concerning the Candidates’ technical facilities and
measures for ensuring quality:
- The Candidates’ must have a quality assurance scheme.
The Candidates must answer the ESPD, Part IV C:‘Technical facilities and measures for ensuring quality’ with a
‘yes’.
Vis mere Betingelser i forbindelse med kontrakten
Betingelser for opfyldelse af kontrakten: See Part III - Contract and its appendices.
Procedure Type af procedure
Konkurrencepræget procedure med forhandling
Oplysninger om reduktion af antallet af løsninger eller tilbud under forhandling eller dialog
Anvendelse af en trinvis procedure for gradvist at reducere antallet af løsninger, der skal drøftes, eller af tilbud, der skal forhandles
Oplysninger om forhandling
Den ordregivende myndighed forbeholder sig ret til at tildele kontrakten på grundlag af de første tilbud uden at føre forhandlinger
Administrative oplysninger
Frist for modtagelse af bud eller ansøgninger om deltagelse: 2023-09-25
12:00 📅
Anslået dato for afsendelse af invitationer til at afgive tilbud eller deltage til udvalgte ansøgere: 2023-09-29 📅
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Nedenstående tidsramme er udtrykt i antal måneder.
Minimumsfrist, inden for hvilken tilbudsgiveren skal opretholde tilbuddet: 6
Supplerende oplysninger Oplysninger om elektroniske arbejdsgange
Elektronisk fakturering vil blive accepteret
Der vil blive anvendt elektronisk betaling
Yderligere oplysninger
“All communication concerning the Tender, including Q&A and submission of Application and Tenders, must take
place in EU-Supply. Access to the Tender...”
All communication concerning the Tender, including Q&A and submission of Application and Tenders, must take
place in EU-Supply. Access to the Tender Documents and participation in the Tender Procedure requires online
registration (free of charge).
Candidates/Tenderers will be excluded from participation in the Tender Procedure if the mandatory exclusion
grounds listed in sections 135-136 or the voluntary exclusion grounds listed in sections 137(1)-(5) of the Danish
Public Procurement Act apply. However, DRS may not exclude a Candidate or a Tenderer which has provided
sufficient documentation that the Candidate or Tenderer is reliable (self-cleaning) pursuant to Section 138 of
the Danish Public Procurement Act. Final documentation relating to grounds for exclusion and fulfillment of the
minimum requirements for suitability are described in the Tender Conditions, section 8.9.
DRS will also exclude a Candidate covered by the exclusion ground in section 134a of the Danish Public
Procurement Act, concerning Candidates from non-cooperative tax jurisdictions. However, the Candidate shall
not answer any questions relating to this exclusion ground in the ESPD.
The Candidate must declare not to be covered by Article 5k (1) in Council Regulation
(EU) No 833/2014 of 31 July 2014 ("Russia declaration"). The Candidate may use Appendix T8 to fulfill this
requirement.
If the Candidate is a group of economic operators (e.g. a consortium), the Candidate must provide statements
or other documentation proving that the group of economic operators is jointly and severally liable for the
completion of the Contract. The statement or the other documentation must also contain a statement declaring
the economic operator in the group who can act as an agent with mandate to legally bind all operators in agreement with DRS. The Candidate may use Appendix T3 (Statement from Consortium) to fulfil this
requirement. The statement must be signed by all participating economic operators.
If a Candidate rely on other entities to fulfil the minimum requirements for suitability, the Candidate must provide
statements of support or other documentation proving the following:
- That the Candidate has access to the necessary economic and financial standing and/or technical and
professional ability.
- The statement of support shall provide documentation of the fact that the entity referred to has a legal
obligation to the Candidate.
- If the Candidate bases its economic and financial standing on an entity, the entity must be jointly and severally
liable for the completion of the contract with DRS.
- If the Candidate bases its technical and professional ability on an entity, the entity must perform the specific
aspects of the contract.
The Candidate may use Appendix T4 (Statement of Support) to fulfil this requirement.
The Candidates will be notified simultaneously in EU-Supply of the Prequalification decision and the selected
Candidates will be encouraged to submit Preliminary Tenders. In this notification the Candidates will be asked to
submit ESPD documentation with their Preliminary Tender.
DRS will pay a remuneration of 15,000 EUR (excluding VAT) to the prequalified Candidates/the Tenderers
(with the exception of the Tenderer who has been awarded the Contract) for their participation in the Tender
Procedure conditioned upon i) the Tenderer’s submission of complete and serious Tenders (at the discretion of
DRS), i.e. both Preliminary Tender, Revised Tender and Final Tender and ii) participation in the entire Tender
Procedure.
DRS reserves the right to award the Contract on the basis of the Preliminary Tenders or the Revised Tenders
without conducting further negotiations.
DRS reserves the right to reduce the number of Tenderers (shortlisting).
DRS reserves the right to ask for submission of additional Tenders and to carry out additional rounds of
negotiations, if deemed necessary.
Vis mere Gennemgå organ
Navn: Klagenævnet for Udbud
Postadresse: Toldboden 2
Postby: Viborg
Postnummer: 8800
Land: Danmark 🇩🇰
Telefon: +45 72405600📞
E-mail: klfu@naevneneshus.dk📧
URL: https://klfu.naevneneshus.dk🌏 Gennemgangsprocedure
Præcise oplysninger om fristerne for gennemgangsprocedurer:
“Precise information on deadline(s) for review procedures:
The rules concerning deadlines for review procedures are found in the Danish Complaints Board for...”
Præcise oplysninger om fristerne for gennemgangsprocedurer
Precise information on deadline(s) for review procedures:
The rules concerning deadlines for review procedures are found in the Danish Complaints Board for Public
Procurement Act (Act no. 593 of 2.6.2016) available at www.retsinformation.dk
Complaints concerning a candidate not being prequalified must be submitted with The Complaints Board
for Public Procurement (the Complaints Board) within 20 calendar days starting the day after DRS has sent notification to the candidates involved, cf. Section 7(1) of the Danish Complaints Board for Public Procurement
Act.
Other complaints must be filed with the Complaints Board within 45 calendar days after DRS has published
a contract award notice in the Official Journal of the European Union (with effect from the day following the
publication date), cf. Section 7(2)(i).
The complainant must notify DRS of the complaint in writing at the latest simultaneously with the submission
as well as whether the complaint has been submitted in the standstill-period, cf. Section 6(4) of the Danish
Complaints Board for Public Procurement Act. If the complaint has not been submitted within the standstill period, the complainant must notify DRS in writing whether the complainant has requested the complaint to be
given suspensory effect pursuant to Section 12(1) of the Act, cf. Section 6(4) of the Act.
Vis mere Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence- og Forbrugerstyrelsen
Postadresse: Carl Jacobsens Vej 35
Postby: Valby
Postnummer: 2500
Land: Danmark 🇩🇰
Telefon: +45 41715000📞
E-mail: kfst@kfst.dk📧
URL: www.kfst.dk🌏
Kilde: OJS 2023/S 164-519106 (2023-08-23)