The contract includes design and build of the new Sydhavn Traction power Sub Station (TSS) including 25 KV cable tracée to neutralsection placed in ‘Sydhavns tunnellen’, as well as building, foundation work, drainage, earthwork, technical equipment, test and commission etc. The contract includes delivery and installation of a complete turn-key substation in operational condition.
Further description of the contract can be found in the tender documents.
Deadline
Fristen for modtagelse af bud var på 2020-02-21.
Indkøbet blev offentliggjort på 2020-01-20.
Objekt Omfanget af udbuddet
Titel: Modernisation of Traction Power
Produkter/tjenester: Transformatorstation📦
Kort beskrivelse:
“The contract includes design and build of the new Sydhavn Traction power Sub Station (TSS) including 25 KV cable tracée to neutralsection placed in...”
Kort beskrivelse
The contract includes design and build of the new Sydhavn Traction power Sub Station (TSS) including 25 KV cable tracée to neutralsection placed in ‘Sydhavns tunnellen’, as well as building, foundation work, drainage, earthwork, technical equipment, test and commission etc. The contract includes delivery and installation of a complete turn-key substation in operational condition.
Further description of the contract can be found in the tender documents.
Vis mere
Anslået værdi uden moms: DKK 186 000 000 💰
The contract includes design and build of the new Sydhavn Traction power Sub Station (TSS) including 25 KV cable tracée to neutralsection placed in ‘Sydhavns tunnellen’, as well as building, foundation work, drainage, earthwork, technical equipment, test and commission etc. The contract includes delivery and installation of a complete turn-key substation in operational condition.
Further description of the contract can be found in the tender documents.
Vis mere Kriterier for tildeling
Prisen er ikke det eneste tildelingskriterium, og alle kriterier er kun anført i udbudsdokumenterne
Omfanget af udbuddet
Anslået samlet værdi ekskl. moms: DKK 186 000 000 💰
Kontraktens, rammeaftalens eller det dynamiske indkøbssystems varighed
Nedenstående tidsramme er udtrykt i antal måneder.
Beskrivelse
Varighed: 43
Oplysninger om begrænsningerne i antallet af ansøgere, der kan indbydes
Påtænkt antal ansøgere: 6
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
“Selection of the tenderers will be made on the following 2 criteria:
1) The tenderer’s references: the tenderers with the most relevant references, cf....”
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere
Selection of the tenderers will be made on the following 2 criteria:
1) The tenderer’s references: the tenderers with the most relevant references, cf. Tender Conditions Section 3.6.1 References; and
2) The tenderer’s solvency ratio: the tenderers with the highest solvency ratios.
The selection criteria is included in the assessment with equal importance.
Vis mere Oplysninger om valgmuligheder
Indstillinger ✅
Beskrivelse af mulighederne:
“The contract includes the following 2 options
— design and build of new traction power sub station in Slagelse,
— design and build of new traction power sub...”
Beskrivelse af mulighederne
The contract includes the following 2 options
— design and build of new traction power sub station in Slagelse,
— design and build of new traction power sub station in Marslev.
Further description of the contract can be found in the tender documents.
Vis mere Omfanget af udbuddet
Oplysninger om EU-midler: Ten-t
Juridiske, økonomiske, finansielle og tekniske oplysninger Økonomisk og finansiel stilling
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The tenderer must submit the following information as preliminary proof that the tenderer meets the economic and financial requirements for eligibility:
The...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The tenderer must submit the following information as preliminary proof that the tenderer meets the economic and financial requirements for eligibility:
The tenderer’s solvency ratio in the latest available financial year.
Information on the economic and financial capacity must be submitted in Part IV.B of the ESPD.
“As a minimum it is required that the tenderer’s solvency ratio in the latest available financial year is 20,0 % or higher.
Insofar as the tenderer bases the...”
As a minimum it is required that the tenderer’s solvency ratio in the latest available financial year is 20,0 % or higher.
Insofar as the tenderer bases the economic and financial capacity on another entity the solvency ratio will be calculated as the total of the tenderer’s and the supporting entity’s solvency ratio in the latest available financial year.
If the tenderer consists of several entities, i.e. a joint venture or consortium, the solvency ratio will be calculated as the total of the joint entities solvency ratio in the latest available financial year.
Vis mere Teknisk og faglig kompetence
Liste og kortfattet beskrivelse af udvælgelseskriterier:
“The tenderer must submit the following information as preliminary proof that the tenderer meets the technical and professional requirements for...”
Liste og kortfattet beskrivelse af udvælgelseskriterier
The tenderer must submit the following information as preliminary proof that the tenderer meets the technical and professional requirements for eligibility:
The tenderer must submit a reference list of the most substantial similar references carried out within the past 5 years from the call for tender, cf. the call for tender Section II.1.4) and II.2.4)
each reference should contain a short description of delivery pertaining the works delivered. Insofar as it is possible, the references should likewise contain the economic value of the works carried out, date of performance as well as the name of the client. The date of performance must contain the start date and the conclusion date. If this is not possible due to the nature of the performance (e.g. a framework agreement) the tenderer is asked to specify how the dates in the reference is defined. If the tenderer’s reference was performed as part of a consortium, or the tenderer has acted as sub-supplier in the references the exact contribution by the candidate must be elaborated.
The reference list can only contain 3 references as a maximum, regardless that the tenderer consists of several entities, i.e. a joint venture or consortium or the tenderer bases the technical and professional capacity on another entity. Should more than 3 references be listed in the application for pre-qualification, Banedanmark will only regard the first 3 references on the list. All other references will be disregarded in the assessment.
If the tenderer bases the technical and professional capacity on another entity this entity must carry out the actual works pertaining to the contract that the Tenderer based the capacity on.
Vis mere Betingelser for deltagelse
Betingelser for deltagelse (tekniske og faglige kvalifikationer):
“As a minimum it is required that the tenderer submits 1 reference regarding design, build, delivery, test commissioning and installation of substations in...”
Betingelser for deltagelse (tekniske og faglige kvalifikationer)
As a minimum it is required that the tenderer submits 1 reference regarding design, build, delivery, test commissioning and installation of substations in operational condition including, HV transformer cable tracée from power station to TSS, building, foundation work, drainage, earthwork, technical equipment, test and commission.
It is not a requirement that the tenderer presents all of the above in one reference. I.e. the Tenderer can present one reference containing design and build of a substation as well as other references containing delivery and installation of substations in operational conditions.
Vis mere
Krav om deponering og sikkerhedsstillelse: Refer to the tender documents.
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem: Refer to the tender documents.
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have:
“If the contract is awarded to a group of entities (e.g. a consortium or joint venture), such group is required to undertake joint and several liability and...”
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have
If the contract is awarded to a group of entities (e.g. a consortium or joint venture), such group is required to undertake joint and several liability and to authorize 1 entity to represent the group.
Vis mere Betingelser i forbindelse med kontrakten
Betingelser for opfyldelse af kontrakten: Refer to the tender documents.
Procedure Type af procedure
Forhandlet procedure med forudgående indkaldelse af konkurrencer
Oplysninger om reduktion af antallet af løsninger eller tilbud under forhandling eller dialog
Anvendelse af en trinvis procedure for gradvist at reducere antallet af løsninger, der skal drøftes, eller af tilbud, der skal forhandles
Administrative oplysninger
Frist for modtagelse af bud eller ansøgninger om deltagelse: 2020-02-21
14:00 📅
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: dansk 🗣️
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️
Nedenstående tidsramme er udtrykt i antal måneder.
Minimumsfrist, inden for hvilken tilbudsgiveren skal opretholde tilbuddet: 6
Supplerende oplysninger Gennemgå organ
Navn: The Complaints Board for Public Procurement
Postadresse: Nævnenes Hus, Toldboden 2
Postby: Viborg
Postnummer: 8800
Land: Danmark 🇩🇰
Telefon: +45 72405600📞
E-mail: klfu@naevneneshus.dk📧
URL: https://erhvervsstyrelsen.dk/klagevejledning-0🌏 Gennemgangsprocedure
Præcise oplysninger om fristerne for gennemgangsprocedurer:
“Complaints about not being pre-qualified shall be submitted to The Complaints Board for Public Procurement within 20 calendar days from the day following...”
Præcise oplysninger om fristerne for gennemgangsprocedurer
Complaints about not being pre-qualified shall be submitted to The Complaints Board for Public Procurement within 20 calendar days from the day following the day on which the contracting entity has sent a notification to the applicants about who have been pre-qualified, if the notification contains a short statement of relevant reasons for the decision, cf. Act on the Complaints Board for Public Procurement § 7, subsection 1.
Complaints about the award of the contract must be submitted to The Complaints Board for Public Procurement within 45 calendar days after the contracting entity has published a contract award notice in the Official Journal of the European Union (TED).
Simultaneously with the appeal to The Complaints Board for Public Procurement, the claimant shall inform the contracting entity in writing that the complaint is lodged to the Board and whether the complaint has been lodged during the standstill period, cf. § 3 subsection 1. In case the complaint has not been lodged in the standstill period, the claimant must specify whether suspensory effect of the appeal has been requested, cf. § 12 subsection 1.
Vis mere Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: The Danish Competition and Consumer Authority
Postadresse: Carl Jacobsens Vej 35
Postby: Valby
Postnummer: 2500
Land: Danmark 🇩🇰
Telefon: +45 41715000📞
E-mail: kfst@kfst.dk📧
URL: http://www.kfst.dk🌏
Kilde: OJS 2020/S 015-032104 (2020-01-20)
Supplerende oplysninger (2020-02-13) Objekt Omfanget af udbuddet
Kort beskrivelse:
“The contract includes design and build of the new Sydhavn Traction power Sub Station (TSS) including 25 KV cable tracée to neutralsection placed in...”
Kort beskrivelse
The contract includes design and build of the new Sydhavn Traction power Sub Station (TSS) including 25 KV cable tracée to neutralsection placed in ‘Sydhavns tunnellen’, as well as building, foundation work, drainage, earthwork, technical equipment, test and commission, etc.
The contract likewise includes the design and build of the new Gelsted Traction power sub station (TSS) (GvF) including 25 KV cable tracée to neutralsection, and 150 KV cables from Energinet transformator station Kingstrup, incl. building, foundation work, drainage, earthwork, technical equipment, test and commission, etc.
Final contract, on this part of the project (Gelsted TSS), is provided that it can be financed with public funds.
The contract includes delivery and installation of a complete turnkey substation in operational condition.
Further description of the contract can be found in the tender documents.
Supplerende oplysninger Oprindelig reference til meddelelsen
Meddelelsesnummer i EUT S: 2020/S 015-032104
Ændringer Tekst, der skal berigtiges i den oprindelige meddelelse
Afsnittets nummer: II.1.4)
Sted for den tekst, der skal ændres: Short description:
Tomme gamle værdier
Ny værdi
Tekst:
“The contract includes design and build of the new Sydhavn Traction power Sub Station (TSS) including 25 KV cable tracée to neutralsection placed in...”
Tekst
The contract includes design and build of the new Sydhavn Traction power Sub Station (TSS) including 25 KV cable tracée to neutralsection placed in ‘Sydhavns tunnellen’, as well as building, foundation work, drainage, earthwork, technical equipment, test and commission, etc.
The contract likewise includes the design and build of the new Gelsted Traction power sub station (TSS) (GvF) including 25 KV cable tracée to neutralsection, and 150 KV cables from Energinet transformator station Kingstrup, incl. building, foundation work, drainage, earthwork, technical equipment, test and commission, etc.
Final contract, on this part of the project (Gelsted TSS), is provided that it can be financed with public funds.
The contract includes delivery and installation of a complete turnkey substation in operational condition.
Further description of the contract can be found in the tender documents.
Vis mere
Kilde: OJS 2020/S 034-081255 (2020-02-13)
Supplerende oplysninger (2020-02-25) Objekt Omfanget af udbuddet
Kort beskrivelse:
“The contract includes design and build of the new Sydhavn Traction power Sub Station (TSS) including 25 KV cable tracée to neutralsection placed in...”
Kort beskrivelse
The contract includes design and build of the new Sydhavn Traction power Sub Station (TSS) including 25 KV cable tracée to neutralsection placed in ‘Sydhavns tunnellen’, as well as building, foundation work, drainage, earthwork, technical equipment, test and commission, etc. The contract includes delivery and installation of a complete turnkey substation in operational condition.
Further description of the contract can be found in the tender documents.
Ændringer Tekst, der skal berigtiges i den oprindelige meddelelse
Afsnittets nummer: II.1.5)
Sted for den tekst, der skal ændres: Estimated total value
Gammel værdi
Tekst: Value excluding VAT: 186 000 000,00 DKK
Ny værdi
Tekst: Value excluding VAT: 231 000000,00 DKK
Tekst, der skal berigtiges i den oprindelige meddelelse
Afsnittets nummer: II.2.6)
Sted for den tekst, der skal ændres: Estimated value
Gammel værdi
Tekst: Value excluding VAT: 186 000 000,00 DKK
Ny værdi
Tekst: Værdi eksklusive moms: 231 000 000,00 DKK
Andre supplerende oplysninger
“Due to the change notification as published in 2020/S 034-081255 including Gelsted Traction power sub-station (TSS) in the contract, the overall value of...”
Due to the change notification as published in 2020/S 034-081255 including Gelsted Traction power sub-station (TSS) in the contract, the overall value of the contract is increased to 231 000 000,00 DKK
Vis mere
Kilde: OJS 2020/S 041-097724 (2020-02-25)