Tekst
Field: List and and brief description of selection criteria:
In part IV, C of ESPD, the applicant may provide up to a maximum of 5 references to contracts comparable to the contract that is out for tender, this includes contracts for route control systems, shunting yard systems and interlocking systems.
Each reference should address the following issues:
— the name of DSB, the name of the contact person, title, telephone number and e-mail address,
— the location of the established system,
— date for handover of the construction,
— a description of the systems functionality,
— the number of trains using the system on a daily basis,
— the number of routes being handled by the system on a daily basis.
Also containing the above information, the reference must also contain special information for the following systems:
Route control system:
The objects and the number per objects in the system and level of safety integrity, thereby meaning the following objects:
— driver panels,
— local operation panels,
— point,
— emergency operation panels,
— track detection systems,
— point position indications,
— supervisor terminals,
— number of different routes in the system, and
— safety integrity level.
Shunting yard system
The objects and the number per objects in the system and level of safety integrity, thereby meaning the following objects:
— signals,
— local operation panels,
— points,
— track detection systems,
— local position indicators,
— number of different routes in the system and the level of safety integrity.
Interlocking system
The objects and the number per objects in the system and level of safety integrity, thereby meaning the following objects:
— main signals,
— shunting signals,
— local operation panels,
— point,
— track detection systems,
— local position indicators,
— number of different routes in the system and safety integrity level.
It is a requirement that the references provided concern projects where hand over is completed.
For references regarding route control systems, DSB has chosen to allow for references where handover of the construction has taken place within the past 10 years prior to the deadline for submission of application for pre-qualification.
For references regarding shunting yard systems, DSB has chosen to allow for references where handover of the construction has taken place within the past 10 years prior to the deadline for submission of application for pre-qualification.
For references regarding interlocking systems, DSB has chosen to allow for references where handover of the construction has taken place within the past 5 years prior to the deadline for submission of application for pre-qualification.
All references provided by the applicant should be listed in the ESPD of the applicant or lead of the consortium. The applicant may also provide the description of the references in a separate document, however, the ESPD of the applicant/lead of the consortium should contain a list of names of the references. DSB prefers if the list of references is given by using Reference sheet (A101716-125). The headlines of the references should be listed in the ESPD.
Each reference must not exceed 3-A4 pages. If a description of a reference exceeds more than 3-A4 pages, DSB will only use the first 3-A4 pages of the reference.
A reference can only be filled out with 1 system per reference (ex. if a reference regards an interlocking system, the tenderer shall only fill out the general information and the special information regarding the interlocking system).
The applicant may provide up to a maximum of 5 of the most relevant contracts in the list as DSB wishes to evaluate whether the minimum requirements have been fulfilled and who has submitted the most relevant references; cf. based on the first 5 references listed in part IV C of the ESPD.