New Trains — Supply and Maintenance of Electric Trainsets

DSB

DSB seeks to acquire electric trainsets and a variety of interconnected deliverables. The purpose of the acquisition is to enable DSB to carry out its passenger transport operations. Furthermore, DSB intends to acquire full service maintenance including management and performance of maintenance and all related technical support services and delivery of spare parts for the electric trainsets and other supplier services.
Thus, the procurement consists of a framework agreement for acquisition of electric trainsets and other deliverables (Supply Agreement, “SA”) and maintenance services as a Full Service Agreement (FSA) and other Supplier Services for the electric trainsets (Maintenance Agreement, “MA”). The 2 agreements are interconnected and the tender procedure for the agreements is the same. Award will take place for both agreements to the same tenderer in accordance with the common award criteria, see section II.2.5.

Deadline

Fristen for modtagelse af bud var på 2018-09-10. Indkøbet blev offentliggjort på 2018-06-22.

Leverandører

Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:

Hvem? Hvad? Hvor?
Indkøbshistorik
Dato Dokument
2018-06-22 Udbudsbekendtgørelse
2021-06-18 Bekendtgørelse om indgåede kontrakter
2023-11-30 Bekendtgørelse om indgåede kontrakter
2023-12-13 Bekendtgørelse om indgåede kontrakter
Udbudsbekendtgørelse (2018-06-22)
Objekt
Omfanget af udbuddet
Titel: Lokomotiver og motorvogne samt rullende materiel og tilhørende dele
Kort beskrivelse:
DSB seeks to acquire electric trainsets and a variety of interconnected deliverables. The purpose of the acquisition is to enable DSB to carry out its passenger transport operations. Furthermore, DSB intends to acquire full service maintenance including management and performance of maintenance and all related technical support services and delivery of spare parts for the electric trainsets and other supplier services. Thus, the procurement consists of a framework agreement for acquisition of electric trainsets and other deliverables (Supply Agreement, “SA”) and maintenance services as a Full Service Agreement (FSA) and other Supplier Services for the electric trainsets (Maintenance Agreement, “MA”). The 2 agreements are interconnected and the tender procedure for the agreements is the same. Award will take place for both agreements to the same tenderer in accordance with the common award criteria, see section II.2.5.
Vis mere
Bekendtgørelsens metadata
Originalsprog: engelsk 🗣️
Dokumenttype: Udbudsbekendtgørelse
Kontraktens art: Varer
Forordning: Den Europæiske Union, med deltagelse af GPA-lande
Fælles glossar for offentlige kontrakter (CPV)
Kode: Lokomotiver og motorvogne samt rullende materiel og tilhørende dele 📦
Yderligere CPV-kode: Rullende materiel 📦
Sted for udførelsen
NUTS-region: Danmark 🏙️

Procedure
Procedureform: Udbud efter forhandling
Bud-type: Indsendelse gældende for alle delaftaler
Kriterier for tildeling
Det økonomisk mest fordelagtige bud

Ordregivende myndighed
Identitet
Land: Danmark 🇩🇰
Type af ordregivende myndighed: Forsyningsvirksomhed
Navn på ordregivende myndighed: Dsb
Postadresse: Telegade 2
Postnummer: 2360
Postby: Taastrup
Kontakt
Internetadresse: http://www.dsb.dk 🌏
E-mail: naej@dsb.dk 📧
URL til dokumenter: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=214430&B=KA 🌏
URL til deltagelse: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=214430&B=KA 🌏

Reference
Datoer
Afsendelsesdato: 2018-06-22 📅
Tilbudsfrist: 2018-09-10 📅
Offentliggørelsesdato: 2018-06-26 📅
Identifikatorer
Bekendtgørelsesnummer: 2018/S 120-274572
EUT-S-nummer: 120
Yderligere oplysninger
1) Re the European Single Procurement Document (ESPD): The applicant shall complete and submit an ESPD which serves as preliminary evidence of fulfilment of the conditions for participation, incl. absence of the grounds for exclusion. DSB reserves the right, at any time during the tender procedure, to request an applicant/tenderer to provide documentary proof, see section 151 of the Danish Public Procurement Act (Act no 1564 of 15 December 2015), cf. executive order no. 1624 of 15 December 2015 section 11, if required to ensure the proper execution of the procedure. Before awarding the agreements, the tenderer to whom DSB intends to award the agreements must provide documentation concerning the information in the ESPD, see section 153 of the Danish Public Procurement Act. DSB has prepared the ESPD for the applicants to fill out, see the tender material. 2) The amount in sections II.1.5) and II.2.6) is a rough estimate (incl. all options) stated solely for the purpose of giving interested parties an impression of the scope of the contract. 3) The duration in section II.2.7) is the expected duration of the SA and the MA, however not incl. an exercise of the options for extension by 10 years of the MA. 4) An economic operator may only submit one application to participate. "Economic operator" shall be defined as a single economic operator or a group of economic operators (a consortium). In addition, two or more economic operators who are part of the same legal group may not submit more than one application to participate, unless the economic operators can demonstrate that their participation in the tender process is and continuously will be autonomous and independent. "The same legal group" shall be defined as entities covered by directive 2013/34/EU art. 22(1). The same applies if an economic operator participates in more than one prequalification application, e.g. alone and in a consortium, alone and as a supporting entity or in a consortium and as a supporting entity. DSB will, where appropriate, request additional information from such applicants to verify that their participation in the tender process is and continuously will be autonomous and independent. If this cannot be verified, DSB may not take either of the applications into consideration. The same principle applies if the situation arises during the tender procedure. 5) Questions concerning the application for participation may be submitted at the “QnA” section in EU Supply where answers will also be made available. 6) During the negotiation process (at the earliest after receiving INDO2) DSB reserves the right to shortlist, i.e. to reduce the number of tenderers, to two tenderers, based on the initial evaluation of the INDO2 (or later INDOs) in accordance with the award criteria, see the Tender Conditions clause 7.2.1. 7) The signing of the agreements is subject to political approval, incl. final approval of the funding of the project from the Finance Committee of the Danish Parliament. 8) DSB has conducted a preliminary market consultations in order to prepare the procurement. A report summarizing DSB's findings is available at https://www.dsb.dk/om-dsb/virksomheden/rapporter-og-regnskab/fremtidens-tog/ 9) Reference is made to the Tender Conditions clause 10 regarding changes to the composition of the tenderer. 10) Please see the Tender Conditions clause 9 re requirement categorization of the tender material. It is emphasized that all requirements that are not Mandatory Requirements may in principle be subject to negotiation and may be changed or withdrawn according to DSB’s decision. Thus, DSB encourages all economic operators who can comply with the Mandatory Requirements (and fulfil the minimum requirements for participation, see sections III.1.2) and III.1.3)) to apply for prequalification, even if the economic operator cannot comply with all Key Requirements. Please also see the Tender Conditions clause 7 re expected topics for negotiations.
Vis mere

Objekt
Omfanget af udbuddet
Kort beskrivelse:
DSB seeks to acquire electric trainsets and a variety of interconnected deliverables. The purpose of the acquisition is to enable DSB to carry out its passenger transport operations. Furthermore, DSB intends to acquire full service maintenance including management and performance of maintenance and all related technical support services and delivery of spare parts for the electric trainsets and other supplier services.
Vis mere
Thus, the procurement consists of a framework agreement for acquisition of electric trainsets and other deliverables (Supply Agreement, “SA”) and maintenance services as a Full Service Agreement (FSA) and other Supplier Services for the electric trainsets (Maintenance Agreement, “MA”). The 2 agreements are interconnected and the tender procedure for the agreements is the same. Award will take place for both agreements to the same tenderer in accordance with the common award criteria, see section II.2.5.
Vis mere
Anslået samlet værdi: 50 000 000 000 DKK 💰
Kort beskrivelse:
The SA covers electric trainsets and interconnected deliverables (e.g. documentation, training incl. simulator solution, related IT systems and services). The SA has a minimum committed purchase of 100 trainsets and the possibility to acquire further trainsets and interconnected deliverables. The trainsets shall be self propelled electric trainsets for passenger transport in regional and fast services on the infrastructure in Denmark. It shall be possible to operate the trainsets coupled in multiple operation. It is expected that the trains will be required to provide levelled access from 550 mm platforms and provide functionality to support short travel times such as high operational speed, good acceleration and fast passenger exchange.
Vis mere
The SA is expected to have a duration of 8 years with an option for extension for up to 4 years. Due to uncertainty regarding the infrastructure and operational needs and requirements, DSB needs to be able to acquire further trainsets until 2032 if the option is exercised. From an operational and economical perspective DSB needs to have a uniform fleet to minimize complexity in regard to e.g. maintenance, training, spare parts, documentation and to assure flexibility in the operation of the fleet. In the view of DSB, these grounds satisfy the conditions for a contract period of up to 12 years, see the utilities directive art. 51(1). If the option is exercised, the last purchase order shall be placed before expiration of the 12 years, however delivery may take place and guarantees etc. may be valid after the expiration of the 12 years. Preliminary takeover (PTO) of the first trainset is expected to take place 42 months after contract signature. However, the delivery time and rate of delivery depend on a variety of circumstances, e.g. Banedanmark’s projects concerning the railway infrastructure, and delays in these projects may influence the needed time and rate of delivery and these may be changed during the negotiations.
Vis mere
The MA is expected to have a duration of 30 years from PTO of the first trainset. However, the MA shall commence at contract signature. The maintenance shall be carried out in workshops (incl. handover points) provided by DSB, which the supplier shall furnish with machinery, special tools and other equipment needed to maintain the trainsets. The maintenance services shall consist of management and execution of preventive and corrective maintenance incl. planning, onsite fault finding, technical support, provision of spare parts, documentation and training. The other Supplier Services will consist of design authority services, extended engineering support, configuration and documentation management, obsolescence management, IT services and product platform evolution services incl. future modifications of the trainsets.
Vis mere
The exact content of the deliverables under the agreements is subject to negotiation, see Tender Conditions clauses 7 and 9.
DSB has an option to extend the MA for up to 10 years (in total approx. 44 years from contract signature) because the trainsets have a life expectancy of 30 years or more and it is necessary for DSB to have the same supplier throughout the agreement. Furthermore, a great deal of knowledge and experience will be gathered throughout the contract period. The need to minimize the technical and logistical difficulties that a change of supplier will result in also sustains the need for a contract period of the said length. In the view of DSB, the MA is not a framework agreement in itself, but in DSB’s view these grounds in any event satisfy the conditions for a contract period of the said length, see the utilities directive art. 51(1).
Vis mere
The MA may be terminated for convenience after 15, 20 or 25 years. Please note that the MA is expected to contain fallback provisions requiring the supplier to recommence the delivery of maintenance services that may expire or be terminated, e.g. if the transfer to another service provider fails.
Vis mere
Anslået værdi uden moms: 50 000 000 000 DKK 💰
Varighed: 408 måneder
Beskrivelse af fornyelser:
The SA is expected to have a duration of 8 years with an option for extension for further 4 years (2 times 2 years).
The MA is expected to have a duration of 30 years from PTO of the 1
Beskrivelse af mulighederne:
The Supply Agreement contains options for extension for further 4 years (2 times 2 years). The Maintenance Agreement contains options for extension for further 10 years (2 times 5 years).
Sted for udførelsen
Hovedsted eller sted for udførelsen: Denmark

Juridiske, økonomiske, finansielle og tekniske oplysninger
Betingelser for deltagelse
Økonomisk og finansiel stilling:
The applicant must submit a completed version of the European Single Procurement Document (ESPD), including Part IV, section B, which shall contain information concerning the financial ratios, total annual turnover and balance sheet total described below (A - E).
Vis mere
DSB intends to ask the applicants to provide documentation for their fulfillment of the minimum requirements concerning financial and economic standing after pre-qualification. Further information is provided in the tender material. The documentation shall consist of audited financial statements or excerpts thereof for the 3 latest financial years, depending on the date on which the applicant's undertaking was set up or the applicant started trading, where publication of financial statements is required under the law of the country in which the applicant is established, or any other form of documentation which DSB deems appropriate, where the applicant is unable to present audited financial statements for a valid reason. Specifically concerning the calculation of debt ratio it is noted that if the net interest bearing debt cannot be deducted from the audited financial statements of the applicant, the applicant may document fulfillment of the minimum requirement for debt ratio by providing a statement from a state authorized accountant with information about the net interest bearing debt or by performing the calculation of debt ratio based on the applicant’s net debt (instead of net interest bearing debt) and provide documentation for the net debt in the form of audited financial statements or excerpts thereof etc., see above. By ‘financial year’ is meant either a calendar year (1 January — 31 December) or a season (e.g. 1 July — 30 June).
Vis mere
Mindstekrav til niveauet:
The applicant must meet the following minimum requirements at the time of prequalification as an average of the last 3 financial years prior to the deadline for submission of application for prequalification:
(A) A total annual turnover of at least EUR 1,000 million
(B) A balance sheet total of at least EUR 1,500 million
(C) An EBIT margin of at least 5 % - calculated by dividing EBIT with turnover (EBIT/turnover*100)
(D) A debt ratio of under 4 – calculated by dividing net interest bearing debt with EBITDA (net interest bearing debt/EBITDA)
(E) A solvency ratio of at least 20 % – calculated by dividing equity with total assets (equity/total assets*100)
Re (D) please note, that if the net interest bearing debt cannot be deducted from the audited financial statements of the applicant, the applicant may calculate the debt ratio by dividing net debt (instead of net interest bearing debt) with EBITDA.
If the applicant is the parent company of a group of companies (i.e. the same legal group) the turnover, balance sheet total, EBIT margin, debt ratio and solvency ratio may be based on the financial figures of the consolidated financial statement of the group of companies. “The same legal group" shall be defined as entities covered by directive 2013/34/EU (directive on the annual financial statements, consolidated financial statements and related reports of certain types of undertakings) art. 22(1).
Vis mere
If the applicant is an intermediate parent company (i.e. the parent company of a "sub group" of companies) or the applicant is relying on the economic and financial capacity of such an intermediate parent company, the turnover, balance sheet total, EBIT margin, debt ratio and solvency ratio may be based on the financial figures of the consolidated financial statement of the “sub group” of companies.
Vis mere
If the applicant is relying on the capacity of one or more other entities the turnover, balance sheet total, EBIT margin, debt ratio and solvency ratio will be calculated on the basis of the combined financial figures of the applicant and the supporting entities. This means, e.g. in relation to solvency ratio, that the calculation will be based on the combined total equity of the applicant and the supporting entities calculated as an average of the last 3 financial years and the combined total assets of the applicant and the supporting entities calculated as an average of the last 3 financial years (solvency ratio = average combined total equity / average combined total assets).
Vis mere
If the applicant and the supporting entity/entities have consolidated financial statements, the calculations of the turnover, balance sheet total, EBIT margin, debt ratio and solvency ratio will be based on such consolidated financial statements; in this case, the applicant and supporting entities should provide the information necessary in the ESPD to allow for correct calculations.
Vis mere
The applicant must prove that the necessary resources from the supporting entity/entities will be made available to the applicant, e.g. by producing an undertaking on the part of those entities to that effect, see TC.002 to the Tender Conditions. If the applicant is awarded the agreements, the supporting entity/entities shall undertake joint and several liability and co-sign the agreements.
Vis mere
If the applicant is a group of economic operators (e.g. a consortium), the turnover, balance sheet total, EBIT margin, debt ratio and solvency ratio will be calculated in the same manner as applicants with one or more supporting entities, i.e. on the basis of the combined financial figures of the participating economic operators.
Vis mere
If any of the participating economic operators (in the consortium) have consolidated financial statements, the calculations concerning these economic operators will be made based on such consolidated financial statements; in this case, the economic operators in question should provide the information necessary in the ESPD to allow for correct calculations.
Vis mere
Teknisk og faglig kompetence:
The applicant must submit the ESPD part IV.C including the following information:
Firstly, references concerning train solutions. The description should include: Recipient name and contact information (in the “Recipients” section), duration of the contract (start date, i.e. the effective date of the contract, and end date) (in the “Start date” and “End date” sections), value of contract (EUR) (in the “Amount” section), vehicle type/name, number of vehicles, date for commercial operation of first vehicle, number of vehicles delivered within the past 5 years prior to the deadline for submission of application for prequalification, the applicant’s role in the delivery (e.g. sole supplier, consortia member, sub-supplier etc.) and technical data for vehicles, e.g. maximum operational speed, length over couplers, floor height, entrance height, number and width of doors, maximum acceleration rate, passenger capacity, power supply, TSI applicability (Y/N – if yes, please provide certificate no.), equipped with ETCS (Y/N – if yes, please provide certificate no.) (in the “Description” section).
Vis mere
Secondly, references concerning maintenance services. The description should include: Recipient name and contact information (in the “Recipients” section), duration of the contract (start date, i.e. the effective date of the contract, and end date) (in the “Start date” and “End date” sections), value of contract (EUR) (in the “Amount” section), contract type (FSA or TSSSA), scope of services such as onsite fault finding, training of maintenance personnel, management and execution of maintenance and spare part supply, number of workshops and handover points included, number of vehicles covered, date for start of services, number of personnel (permanently) on site(s) under the applicant’s responsibility (both blue and white collar), the applicant’s role in the delivery (e.g. sole supplier, consortia member, sub-supplier etc.) and whether a certified quality system was applicable (in the “Description” section). If a contract for maintenance services has a duration that covers more than 5 years before the deadline for submission of application, the applicant should state which part of the contract has been performed within the last 5 years before the deadline for submission of application.
Vis mere
The applicant may state up to 13 references in total. Of these, at least 3 references shall concern maintenance services (minimum requirement 7a-7c below). It is possible for an applicant with one reference to show fulfilment of more than one minimum requirement. If more than 13 references are submitted, DSB will take the 13 newest references into consideration. If it cannot be determined which 13 references are the newest, DSB will draw lots among all references submitted.
Vis mere
If the applicant is a group of economic operators (e.g. a consortium), the consortium may as a whole submit 13 references including minimum 3 references concerning maintenance services. If the applicant relies on the capacity of one or more other entities, a maximum of 13 references including minimum 3 references concerning maintenance services for the applicant and the supporting entities together.
Vis mere
The references will also be used in the assessment for choosing the limited number of candidates, see section II.2.9). If the tenderer has references that do not fulfil the minimum requirements, such references may still be submitted to support the selection of the tenderer, as long as the tenderer’s total number of references does not exceed the above stated.
Vis mere
Before prequalification DSB may validate the references, incl. by contacting the recipients stated in the submitted references. After prequalification DSB does not intend to ask the applicants to provide further documentation for their fulfilment of the minimum requirements concerning technical and professional ability.
Vis mere
Mindstekrav til niveauet:
The applicant must meet all the minimum requirements below:
Regarding train solution
1) The applicant has delivered an electric mainline regional and/or fast passenger train solution with (a) AC or multi-system (combination of AC/DC), (b) track width 1435 mm, (c) operational speed of min. 160 km/h and (d) a 25 kV 50 Hz voltage system.
Vis mere
2) The applicant has delivered an electric mainline regional and/or fast passenger train solution with (a) AC or multi-system (combination of AC/DC), (b) track width 1435 mm and (c) operational speed of min. 200 km/h.
3) The applicant has delivered an electric mainline regional and/or fast passenger train solution with (a) AC or multi-system (combination of AC/DC), (b) track width 1435 mm, (c) operational speed of min. 160 km/h and (d) low floor that allows level access from 550 mm platforms.
Vis mere
4) The applicant has delivered an electric mainline regional and/or fast passenger train solution with (a) AC or multi-system (combination of AC/DC), (b) track width 1435 mm, (c) operational speed of minimum 160 km/h and (d) multiple operation of minimum 3 trainsets.
Vis mere
Deliveries in minimum requirement 1) - 4) shall have been made within the past 5 years prior to the deadline for submission of application for prequalification. By “delivered” in minimum requirement 1) - 4) and section III.1.3), 1st para., is understood when a train is under production for or taken over and put in commercial service by an external customer.
Vis mere
5) The applicant has obtained TSI approval of electric mainline rolling stock, operational speed of min. 160 km/h, according to TSI HS RST (Dec 2008/232/EC), CR LOC & PAS (Dec 2011/291/EU) or LOC & PAS (Regulation (EU) 1302/2014) or later TSI in an EU/EEA member state.
Vis mere
6) The applicant has obtained approval of ETCS Level 2 onboard system integration on mainline rolling stock, operational speed of min. 160 km/h, according to TSI HS CCS (Dec 2006/860/EC), CR CCS (Dec 2006/679/EC), HS and CR CCS (Dec 2012/88/EU) or CCS (Regulation (EU) 2016/919) or later TSI in an EU/EEA member state.
Vis mere
Regarding maintenance
7a) The applicant has 3 references for maintenance services (TSSSA or FSA) for electric mainline regional and/or fast passenger train solution with AC or multi-system (combination of AC/DC) provided within the past 5 years prior to the deadline for submission of application for prequalification. Of the 3 references:
Vis mere
7b) At least 1 reference shall include maintenance of a fleet of min. 20 trains of one type.
7c) At least 1 reference shall be a FSA.
By ”TSSSA” is understood Technical Support and Spare Part Supply Agreement, incl. at least maintenance management, technical support in any form (e.g. in relation to fault finding etc.), and spare part supply in full or part. By ”FSA” is understood Full Service Agreement incl. at least all preventive and corrective maintenance, maintenance management, fault finding and technical services, and all spare part supply.
Vis mere
If the application is submitted by a joint group of economic operators or the applicant is relying on the capacity of one or more other entities, the minimum requirements must be fulfilled by the joint group/the applicant and the supporting entity/entities as a whole.
Vis mere
Please see TC.003 (Request for prequalification and guide for the ESPD) for examples.
If the applicant is relying on the capacity of one or more other entities, the applicant must prove that the necessary resources from the supporting entity/entities will be made available to the applicant, e.g. by producing an undertaking on the part of those entities to that effect, see TC.002 (Letters of commitment). The applicant may only rely on the capacity of another entity in regard to technical and professional ability where the latter will perform the services for which these capacities are required.
Vis mere
Kontraktens udførelse
Krav om deponering og sikkerhedsstillelse:
The supplier is expected to provide a parent company guarantee as well as an advance payment guarantee and a performance and warranty guarantee; however, DSB's requirements regarding these guarantees may be subject to negotiations during the tender process. Thus, the requirements for the guarantees may be changed or withdrawn entirely according to DSB’s decision.
Vis mere
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem: Reference is made to the tender material with regard to the payment terms.
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have:
No special legal form is required. If the contract is awarded to a group of suppliers (e.g. a consortium) the participants are required to undertake joint and several liability and to appoint one supplier to represent the group.
Furthermore, DSB expects to require that certain assets and liabilities are placed in a special purpose vehicle (a “SPV”) in order to facilitate maintenance services being transferred to DSB in a expiration or termination scenario. However, DSB's requirements in this regard may be subject to negotiations during the tender procedure, and thus, the requirements may be changed or withdrawn entirely according to DSB’s decision.
Vis mere
Betingelser for opfyldelse af kontrakten:
If the supplier uses sub-suppliers, this is subject to certain prerequisites, see the Supply Agreement clause 2.22.5 and the Maintenance Agreement clause 2.9.5.
Please note that the ownership of the trainsets may be transferred to one or more companies ultimately owned by DSB.
Furthermore, please note that the operation of the trainsets may be performed by another train operator in the future.

Procedure
Påtænkt antal ansøgere: 4
Objektive kriterier for udvælgelse af det begrænsede antal ansøgere:
If more than the required number of applicants fulfill the minimum requirements, see sections III.1.2) and III.1.3), the selection of the applicants that will be invited to submit tenders will be based on an evaluation of which applicants have documented the most relevant previous deliveries and services in comparison to the agreements described in sections II.1.4) and II.2.4) above, in terms of the comparability and quantity of the previous deliveries and services. It will be regarded positively in the assessment if each reference fulfills as many minimum requirements as possible, see section III.1.3), and if a train solution has been taken over and put in commercial operation by an external customer. Please note that any ambiguities and/or unclearness in the information submitted in the ESPD in response to section III.1.3) may be regarded negatively in the evaluation when selecting the limited number of candidates.
Vis mere
Tidspunkt for modtagelse af tilbud: 13:00
Sprog, på hvilke bud eller ansøgninger om deltagelse kan indgives: engelsk 🗣️

Ordregivende myndighed
Identitet
Nationalt registreringsnummer: 25050053
Kontakt
Enhed: Nanna Eram Jensen
URL til dokumenter: http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=214430&B=KA 🌏

Reference
Yderligere oplysninger
1) Re the European Single Procurement Document (ESPD):
The applicant shall complete and submit an ESPD which serves as preliminary evidence of fulfilment of the conditions for participation, incl. absence of the grounds for exclusion. DSB reserves the right, at any time during the tender procedure, to request an applicant/tenderer to provide documentary proof, see section 151 of the Danish Public Procurement Act (Act no 1564 of 15 December 2015), cf. executive order no. 1624 of 15 December 2015 section 11, if required to ensure the proper execution of the procedure. Before awarding the agreements, the tenderer to whom DSB intends to award the agreements must provide documentation concerning the information in the ESPD, see section 153 of the Danish Public Procurement Act. DSB has prepared the ESPD for the applicants to fill out, see the tender material.
Vis mere
2) The amount in sections II.1.5) and II.2.6) is a rough estimate (incl. all options) stated solely for the purpose of giving interested parties an impression of the scope of the contract.
3) The duration in section II.2.7) is the expected duration of the SA and the MA, however not incl. an exercise of the options for extension by 10 years of the MA.
4) An economic operator may only submit one application to participate. "Economic operator" shall be defined as a single economic operator or a group of economic operators (a consortium). In addition, two or more economic operators who are part of the same legal group may not submit more than one application to participate, unless the economic operators can demonstrate that their participation in the tender process is and continuously will be autonomous and independent. "The same legal group" shall be defined as entities covered by directive 2013/34/EU art. 22(1). The same applies if an economic operator participates in more than one prequalification application, e.g. alone and in a consortium, alone and as a supporting entity or in a consortium and as a supporting entity. DSB will, where appropriate, request additional information from such applicants to verify that their participation in the tender process is and continuously will be autonomous and independent. If this cannot be verified, DSB may not take either of the applications into consideration. The same principle applies if the situation arises during the tender procedure.
Vis mere
5) Questions concerning the application for participation may be submitted at the “QnA” section in EU Supply where answers will also be made available.
6) During the negotiation process (at the earliest after receiving INDO2) DSB reserves the right to shortlist, i.e. to reduce the number of tenderers, to two tenderers, based on the initial evaluation of the INDO2 (or later INDOs) in accordance with the award criteria, see the Tender Conditions clause 7.2.1.
Vis mere
7) The signing of the agreements is subject to political approval, incl. final approval of the funding of the project from the Finance Committee of the Danish Parliament.
8) DSB has conducted a preliminary market consultations in order to prepare the procurement. A report summarizing DSB's findings is available at https://www.dsb.dk/om-dsb/virksomheden/rapporter-og-regnskab/fremtidens-tog/
9) Reference is made to the Tender Conditions clause 10 regarding changes to the composition of the tenderer.
10) Please see the Tender Conditions clause 9 re requirement categorization of the tender material. It is emphasized that all requirements that are not Mandatory Requirements may in principle be subject to negotiation and may be changed or withdrawn according to DSB’s decision. Thus, DSB encourages all economic operators who can comply with the Mandatory Requirements (and fulfil the minimum requirements for participation, see sections III.1.2) and III.1.3)) to apply for prequalification, even if the economic operator cannot comply with all Key Requirements. Please also see the Tender Conditions clause 7 re expected topics for negotiations.
Vis mere

Supplerende oplysninger
Gennemgå organ
Navn: Klagenævnet for Udbud (The Complaints Board for Public Procurement)
Postadresse: Nævnenes Hus, Toldboden 2
Postby: Viborg
Postnummer: 8800
Land: Danmark 🇩🇰
Telefon: +45 72405600 📞
E-mail: klfu@naevneneshus.dk 📧
Internetadresse: https://erhvervsstyrelsen.dk/klagevejledning-0 🌏
Oplysninger om frister for klageprocedurer:
As a consequence of the Danish Act no. 492 of 12.5.2010 with subsequent amendments regarding enforcement of the rules for procurement etc., complaints regarding a candidate not being prequalified must be filed with the Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, if the notification includes a short account of the relevant reasons for the decision.
Vis mere
Complaints regarding other decisions related to the tender must be filed with The Complaints Board for Public Procurement within 6 months after the Contracting Authority has sent notification to the candidates/ tenderers involved that the Contracting Authority has entered into the framework agreement if the notification included a short account of the relevant reasons for the decision. The complainant must inform the contracting authority of the complaint in writing at the latest simultaneously with the lodging of the complaint to the Complaints Board for Public Procurement. The complainant shall state whether the complaint has been lodged in the stand-still period. If the complaint has not been lodged in the standstill period, the complainant must also state whether the complainant has requested that the complaint be granted suspensive effect.
Vis mere
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Konkurrence- og Forbrugerstyrelsen (The Danish Competition and Consumer Authority)
Postadresse: Carl Jacobsens Vej 35
Postby: Valby
Postnummer: 2500
Telefon: +45 41715000 📞
E-mail: kfst@kfst.dk 📧
Internetadresse: http://www.kfst.dk 🌏
Kilde: OJS 2018/S 120-274572 (2018-06-22)
Bekendtgørelse om indgåede kontrakter (2021-06-18)
Objekt
Omfanget af udbuddet
Kort beskrivelse:
This tender concerns DSB's acquisition of electric trainsets and a variety of interconnected deliverables. The purpose of the acquisition is to enable DSB to carry out its passenger transport operations. Furthermore, DSB will acquire full service maintenance including management and performance of maintenance and all related technical support services and delivery of spare parts for the electric trainsets and other supplier services. Thus, the procurement consists of a framework agreement for acquisition of electric trainsets and other deliverables (Supply Agreement, ‘SA’) and maintenance services as a full service agreement (FSA) and other supplier services for the electric trainsets (Maintenance agreement, ‘MA’). The two agreements are interconnected and has been awarded to the same tenderer in accordance with the common award criteria, see section II.2.5).
Vis mere
Den samlede værdi af udbuddet: 40 000 000 000 DKK 💰
Bekendtgørelsens metadata
Dokumenttype: Bekendtgørelse om indgåede kontrakter

Procedure
Bud-type: Finder ikke anvendelse

Ordregivende myndighed
Identitet
Postnummer: 2630
Kontakt
Telefon: +45 70131415 📞

Reference
Datoer
Afsendelsesdato: 2021-06-18 📅
Offentliggørelsesdato: 2021-06-22 📅
Identifikatorer
Bekendtgørelsesnummer: 2021/S 119-316231
Henviser til bekendtgørelse: 2018/S 120-274572
EUT-S-nummer: 119
Yderligere oplysninger
As the agreements seen as a whole constitute a framework agreement it is not possible to conclusively state the total value of the agreements. With regard to section II.1.7) and V.2.4) it should be noted that the estimated value of the agreements is DKK 20 000 000 000-40 000 000 000. The lower limit of the range thus expresses DSB's estimate of the agreement’s expected minimum value of all contracts awarded in the term of the agreements, whereas the upper limit of the range is an expression of the expected maximum value of all contracts awarded in the term of the agreements. DSB's expectations based on the most likely amount of business on the agreements are thus taken into account, as well as the expected uncertainty of this estimate. Essential to the estimated value of the agreements will be e.g. the number of trainsets acquired and whether the options for extension will be utilised. As regards the lower limit, it is emphasised that the estimate indicated is not a minimum committed purchase by DSB.
Vis mere

Objekt
Omfanget af udbuddet
Kort beskrivelse:
This tender concerns DSB's acquisition of electric trainsets and a variety of interconnected deliverables. The purpose of the acquisition is to enable DSB to carry out its passenger transport operations. Furthermore, DSB will acquire full service maintenance including management and performance of maintenance and all related technical support services and delivery of spare parts for the electric trainsets and other supplier services.
Vis mere
Thus, the procurement consists of a framework agreement for acquisition of electric trainsets and other deliverables (Supply Agreement, ‘SA’) and maintenance services as a full service agreement (FSA) and other supplier services for the electric trainsets (Maintenance agreement, ‘MA’). The two agreements are interconnected and has been awarded to the same tenderer in accordance with the common award criteria, see section II.2.5).
Vis mere
The SA covers electric trainsets and interconnected deliverables (e.g. documentation, training incl. simulator solution, related IT systems and services). The SA has a minimum committed purchase of 100 trainsets and the possibility to acquire further trainsets and interconnected deliverables. The trainsets are self propelled electric trainsets for passenger transport in regional and fast services on the infrastructure in Denmark. It is possible to operate the trainsets coupled in multiple operation. The trains will provide levelled access from 550 mm platforms and provide functionality to support short travel times such as high operational speed, good acceleration and fast passenger exchange.
Vis mere
The SA has a duration of 8 years with an option for extension for up to 4 years. Due to uncertainty regarding the infrastructure and operational needs and requirements, DSB needs to be able to acquire further trainsets until 2032 if the option is exercised. From an operational and economical perspective DSB needs to have a uniform fleet to minimise complexity in regard to e.g. maintenance, training, spare parts, documentation and to assure flexibility in the operation of the fleet. In the view of DSB, these grounds satisfy the conditions for a contract period of up to 12 years, see the utilities directive art. 51(1). If the option is exercised, the last purchase order shall be placed before expiration of the 12 years, however delivery may take place and guarantees etc. may be valid after the expiration of the 12 years. Preliminary takeover (PTO) of the first trainset is expected to take place 42 months after contract signature. However, the delivery time and rate of delivery depend on a variety of circumstances, e.g. Banedanmark’s projects concerning the railway infrastructure, and delays in these projects may influence the needed time and rate of delivery.
Vis mere
DSB has an option to extend the MA for up to 10 years (in total approx. 44 years from contract signature) because the trainsets have a life expectancy of 30 years or more and it is necessary for DSB to have the same supplier throughout the agreement. Furthermore, a great deal of knowledge and experience will be gathered throughout the contract period. The need to minimise the technical and logistical difficulties that a change of supplier will result in also sustains the need for a contract period of the said length. In the view of DSB, the MA is not a framework agreement in itself, but in DSB’s view these grounds in any event satisfy the conditions for a contract period of the said length, see the utilities directive art. 51(1).
Vis mere
The MA may be terminated for convenience after 15, 20 or 25 years. The MA contain fallback provisions requiring the supplier to recommence the delivery of maintenance services that may expire or be terminated, e.g. if the transfer to another service provider fails.
Vis mere
Beskrivelse af mulighederne:
The supply agreement contains options for extension for further 4 years (2 times 2 years). The maintenance agreement contains options for extension for further 10 years (2 times 5 years).
Sted for udførelsen
Hovedsted eller sted for udførelsen: Denmark.

Procedure
Kriterier for tildeling
Kvalitetskriterium (navn): Quality
Kvalitetskriterium (vægtning): 60
Omkostningskriterium (navn): Life Cycle Costs (LCC)
Omkostningskriterium (vægtning): 40

Tildeling af kontrakt
Dato for kontraktindgåelse: 2021-06-17 📅
Navn: Alstom Transport Danmark A/S
Nationalt registreringsnummer: 17184210
Postadresse: Amerika Plads 19
Postby: København Ø
Postnummer: 2100
Land: Danmark 🇩🇰
Telefon: +45 27791705 📞
Internetadresse: www.alstom.com 🌏
Den samlede værdi af udbuddet: 40 000 000 000 DKK 💰
Oplysninger om udbud
Antal modtagne bud: 2

Supplerende oplysninger
Gennemgå organ
Internetadresse: https://naevneneshus.dk/start-din-klage/klagenaevnet-for-udbud/ 🌏
Oplysninger om frister for klageprocedurer:
As a consequence of the Danish Act No 492 of 12 May 2010 with subsequent amendments regarding enforcement of the rules for procurement etc., complaints regarding other decisions related to the tender must be filed with The Complaints Board for Public Procurement within 6 months after the contracting authority has sent notification to the candidates/tenderers involved that the contracting authority has entered into the framework agreement if the notification included a short account of the relevant reasons for the decision. The complainant must inform the contracting authority of the complaint in writing at the latest simultaneously with the lodging of the complaint to the Complaints Board for Public Procurement. The complainant shall state whether the complaint has been lodged in the stand-still period. If the complaint has not been lodged in the standstill period, the complainant must also state whether the complainant has requested that the complaint be granted suspensive effect.
Vis mere
Kilde: OJS 2021/S 119-316231 (2021-06-18)
Bekendtgørelse om indgåede kontrakter (2023-11-30)
Objekt
Omfanget af udbuddet
Titel: New Trains – Supply and Maintenance of Electronic Trainsets
Kort beskrivelse:
Through tender notice no. 2018/S 120-274572 dated June 22, 2018, published on June 26, 2018, DSB (Danish State Railways) tendered out agreements for the procurement of 'New Trains – Supply and Maintenance of Electronic Trainsets', at an estimated value of 50 billion Danish Kroner. The tender was carried out in accordance with the Utilities Directive (2014/25/EU). DSB announces with this notice that DSB intends to enter into an agreement to amend the contract, cf. further details on this in sections 2.1 and 5.1. During the project execution the parties have disagreed about the responsibility for delay of Milestones in the Project Time Schedule and MPM Time Schedule and about certain issues regarding the Reliability regime of the agreements. Furthermore the parties have disagreed regarding a number of raised claims, Variations and Issues. The parties have agreed to settle these matters without changing the economic balance of the agreements in favour of Alstom Transport Danmark A/S ("the supplier") in a manner which was not provided for in the agreements and while maintaining the overall balance of the respective rights and obligations of the parties. The parties have therefore agreed to the following amendments: 1. Changes to the Reliability Regime in terms of a) exclusion of Significant Defects on four specific STM-DK components (however, capped), b) adjustment of parts of the stepwise improvements during Reliability Demonstration Phase, c) change of requirements for Trial Operation Test for the first five trainsets so more than five trainsets (up to seven trainsets) can be used for the Trial Operation Test in Denmark, the number of Defects allowed are reset for the Trial Operation Test in Denmark and modifications will be allowed during the Trial Operation Test outside Denmark under certain conditions, d) increase of the Reliability Target for Significant Defects and decrease of the Reliability Target for Major Defects and e) introduction of an additonal Reliability Performance Penalty. 2. Change concerning time of delivery. The date of the Preliminary Take Over (PTO) of the first trainset has been postponed by 19 months and an additional penalty for delay has been introduced. 3. Monetary compensation converted into trainsets. DSB will receive a number of trainsets at no cost and will have the possibility to receive an additional number of trainsets at no cost, if DSB submits an Additional Purchase Order for additional trainsets within a certain time frame. A new bonus regime has also been implemented in form of a “win back” mechanism, whereby the supplier can “win back” payment for some of the additional trainsets. 4. Settlement of a number of other disagreements regarding raised claims, Variations and Issues.
Vis mere
Kontrakttype: Varer
Produkter/tjenester: Lokomotiver og motorvogne samt rullende materiel og tilhørende dele 📦
Beskrivelse
Intern ID: New Trains – Supply and Maintenance of Electronic Trainsets
Beskrivelse af udbuddet:
Through tender notice no. 2018/S 120-274572 dated June 22, 2018, published on June 26, 2018, DSB (Danish State Railways) tendered out agreements for the procurement of 'New Trains – Supply and Maintenance of Electronic Trainsets', at an estimated value of 50 billion Danish Kroner. The tender was carried out in accordance with the Utilities Directive (2014/25/EU). DSB announces with this notice that DSB intends to enter into an agreement to amend the contract, cf. further details on this in sections 2.1 and 5.1. During the project execution the parties have disagreed about the responsibility for delay of Milestones in the Project Time Schedule and MPM Time Schedule and about certain issues regarding the Reliability regime of the agreements. Furthermore the parties have disagreed regarding a number of raised claims, Variations and Issues. The parties have agreed to settle these matters without changing the economic balance of the agreements in favour of the supplier in a manner which was not provided for in the agreements and while maintaining the overall balance of the respective rights and obligations of the parties. The parties have therefore agreed to the following amendments: 1. Changes to the Reliability Regime in terms of a) exclusion of Significant Defects on four specific STM-DK components (however, capped), b) adjustment of parts of the stepwise improvements during Reliability Demonstration Phase, c) change of requirements for Trial Operation Test for the first five trainsets so more than five trainsets (up to seven trainsets) can be used for the Trial Operation Test in Denmark, the number of Defects allowed are reset for the Trial Operation Test in Denmark and modifications will be allowed during the Trial Operation Test outside Denmark under certain conditions, d) increase of the Reliability Target for Significant Defects and decrease of the Reliability Target for Major Defects and e) introduction of an additonal Reliability Performance Penalty. 2. Change concerning time of delivery. The date of the Preliminary Take Over (PTO) of the first trainset has been postponed by 19 months and an additional penalty for delay has been introduced. 3. Monetary compensation converted into trainsets. DSB will receive a number of trainsets at no cost and will have the possibility to receive an additional number of trainsets at no cost, if DSB submits an Additional Purchase Order for additional trainsets within a certain time frame. A new bonus regime has also been implemented in form of a “win back” mechanism, whereby the supplier can “win back” payment for some of the additional trainsets. 4. Settlement of a number of other disagreements regarding raised claims, Variations and Issues.
Vis mere
Yderligere produkter/tjenester: Land: Danmark 🇩🇰
Sted for udførelsen: Titel
Partiets identifikationsnummer: LOT-0001

Procedure
Type af procedure
Forhandlet procedure uden forudgående indkaldelse af konkurrencer
Retsgrundlag: Direktiv 2014/25/EU
Tildeling af en kontrakt uden forudgående offentliggørelse af en indkaldelse af bud i Den Europæiske Unions Tidende i følgende tilfælde
Kontrakter, der er opført i direktiv 2014/24/EU, art. 7, men som falder uden for anvendelsesområdet for direktiv 2014/25/EU
Type af procedure
Tildeling af en kontrakt uden forudgående offentliggørelse af en indkaldelse af bud i Den Europæiske Unions Tidende (begrundelse):
As noted in section 5.1 the parties have during the project execution disagreed about the responsibility for delay of Milestones in the Project Time Schedule and MPM Time Schedule and about certain issues regarding the Reliability regime of the agreements. Furthermore the parties have disagreed regarding a number of raised claims, Variations and Issues. The parties have reached a consolidated settlement on these matters with due respect to not changing the economic balance of the agreements in favour of the supplier in a manner which was not provided for in the agreements and while maintaining the overall balance of the respective rights and obligations of the parties. The agreements have been subject to tender and DSB does not consider it necessary to conduct a new tender procedure in connection with the changes to the agreements, as the changes are not substantial, cf. Article 89(1)(e) of the Utilities Directive, as defined in Article 89(4) of the Utilities Directive and further elaborated in point (1)-(4) below. (1) The changes do not introduce conditions that, if they had been part of the original tender procedure, would have allowed other applicants than those originally selected access nor would the changes have attracted additional participants in the tender procedure, in this respect it is emphasised that in addition to the four prequalified candidates another three candidates applied but were not prequalified, and the changes would not have changed this and there were no other relevant applicants in the market that would have been able to fulfil the minimum requirements for suitability, (2) the changes would not have resulted in DSB accepting a different offer than the one originally accepted, as the changes would not have led to the submission of significantly different offers, if the changes had been part of DSB’s tender material initially, and because the award of the contract to a large extent was determined by a large difference between the received offers, (3) the changes do not alter the economic balance of the contract in the supplier’s favour in a way that the original contract or framework agreement did not allow for, in this respect it is emphasised that the overall balance of the respective rights and obligations of the parties are maintained as the compensation received by DSB balances the relaxation of the requirements made in favour of the supplier, and (4) the changes do not significantly expand the scope of the contract or framework agreement. In addition to the changes not being substantial, the supplier has previously communicated in early warnings to DSB that the supplier is facing difficulties in their supply chain due to the global shortage of electronic components and raw materials caused by the Russian invasion of Ukraine and the aftermath from the Covid-19 health situation. The supplier has also communicated in early warnings to DSB that they are very challenged with regards to availability of test facilities, as the test facilities in Europe are limited and overbooked due to the many train acquisition projects in the EU. To the extent that the changes should be deemed to be due to these factors, and in particular the Russian invasion of Ukraine, the need for the change could also have arisen due to circumstances that DSB could not have foreseen at the time of entering into the contract. In this case, the amendment may be entered into without a new tender procedure in accordance with Article 89(1)(c) of the Utilities Directive.
Vis mere

Tildeling af kontrakt
Partiets identifikationsnummer: LOT-0001
Kontraktnummer: New Trains – Supply and Maintenance of Electronic Trainsets

Ordregivende myndighed
Navn og adresser
Navn: Dsb
Nationalt registreringsnummer: 25050053
Postadresse: Telegade 2
Postnummer: 2630
Postby: Taastrup
Region: Københavns omegn 🏙️
Land: Danmark 🇩🇰
E-mail: nyetog@dsb.dk 📧
Telefon: +45 24684033 📞
URL: www.dsb.dk 🌏
Den ordregivende myndigheds type
Offentligretligt organ
Hovedaktivitet
Jernbanetjenester

Supplerende oplysninger
Gennemgå organ
Navn: Danish Complaints Board for Public Procurement
Nationalt registreringsnummer: 37795526
Postadresse: Toldboden 2
Region: Vestjylland 🏙️
URL: https://www.klfu.naevneneshus.dk/ 🌏
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: Danish Competition and Consumer Authority
Nationalt registreringsnummer: 10294819
Region: Byen København 🏙️
URL: https://www.kfst.dk/ 🌏
Gennemgangsprocedure
Præcise oplysninger om fristerne for gennemgangsprocedurer:
Complaints that DSB has concluded a contract without prior publication of a notice must be submitted to the Danish Complaints Board for Public Procurement within 30 calendar days from the day after the day on which DSB has published a notice in the Official Journal of the European Union that DSB has concluded the contract, cf. Section 7(3) of the Danish Act on the Complaints Board for Public Procurement (Lov om Klagenævnet for Udbud). No later than at the same time as a complaint is submitted to the Danish Complaints Board for Public Procurement, the complainant must inform DSB in writing that a complaint is submitted to the Danish Complaints Board for Public Procurement and whether the complaint has been submitted within the period of 10 calendar days (calculated from the day after the day on which this notice is published in the Official Journal of the European Union) as set out in section 4(1)(2) of the Danish Act on the Complaints Board for Public Procurement.
Vis mere
Kilde: OJS 2023/S 232-731310 (2023-11-30)
Bekendtgørelse om indgåede kontrakter (2023-12-13)
Objekt
Omfanget af udbuddet
Kort beskrivelse:
Through tender notice no. 2018/S 120-274572 dated June 22, 2018, published on June 26, 2018, DSB (Danish State Railways) tendered out agreements for the procurement of 'New Trains – Supply and Maintenance of Electronic Trainsets', at an estimated value of 50 billion Danish Kroner. The tender was carried out in accordance with the Utilities Directive (2014/25/EU). DSB announces with this notice that DSB has entered into an agreement to amend the contract, cf. further details on this in sections 2.1 and 5.1. DSB has submitted voluntary ex-ante transparency notice no. 731310-2023 concerning the amendments to the contract. During the project execution the parties have disagreed about the responsibility for delay of Milestones in the Project Time Schedule and MPM Time Schedule and about certain issues regarding the Reliability regime of the agreements. Furthermore the parties have disagreed regarding a number of raised claims, Variations and Issues. The parties have agreed to settle these matters without changing the economic balance of the agreements in favour of Alstom Transport Danmark A/S ("the supplier") in a manner which was not provided for in the agreements and while maintaining the overall balance of the respective rights and obligations of the parties. The parties have therefore agreed to the following amendments: 1. Changes to the Reliability Regime in terms of a) exclusion of Significant Defects on four specific STM-DK components (however, capped), b) adjustment of parts of the stepwise improvements during Reliability Demonstration Phase, c) change of requirements for Trial Operation Test for the first five trainsets so more than five trainsets (up to seven trainsets) can be used for the Trial Operation Test in Denmark, the number of Defects allowed are reset for the Trial Operation Test in Denmark and modifications will be allowed during the Trial Operation Test outside Denmark under certain conditions, d) increase of the Reliability Target for Significant Defects and decrease of the Reliability Target for Major Defects and e) introduction of an additonal Reliability Performance Penalty. 2. Change concerning time of delivery. The date of the Preliminary Take Over (PTO) of the first trainset has been postponed by 19 months and an additional penalty for delay has been introduced. 3. Monetary compensation converted into trainsets. DSB will receive a number of trainsets at no cost and will have the possibility to receive an additional number of trainsets at no cost, if DSB submits an Additional Purchase Order for additional trainsets within a certain time frame. A new bonus regime has also been implemented in form of a “win back” mechanism, whereby the supplier can “win back” payment for some of the additional trainsets. 4. Settlement of a number of other disagreements regarding raised claims, Variations and Issues.
Vis mere
Samlet værdi af indkøbsaftalen (ekskl. moms): 0 EUR 💰
Beskrivelse
Beskrivelse af udbuddet:
Through tender notice no. 2018/S 120-274572 dated June 22, 2018, published on June 26, 2018, DSB (Danish State Railways) tendered out agreements for the procurement of 'New Trains – Supply and Maintenance of Electronic Trainsets', at an estimated value of 50 billion Danish Kroner. The tender was carried out in accordance with the Utilities Directive (2014/25/EU). DSB announces with this notice that DSB has entered into an agreement to amend the contract, cf. further details on this in sections 2.1 and 5.1. DSB has submitted voluntary ex-ante transparency notice no. 731310-2023 concerning the amendments to the contract. During the project execution the parties have disagreed about the responsibility for delay of Milestones in the Project Time Schedule and MPM Time Schedule and about certain issues regarding the Reliability regime of the agreements. Furthermore the parties have disagreed regarding a number of raised claims, Variations and Issues. The parties have agreed to settle these matters without changing the economic balance of the agreements in favour of the supplier in a manner which was not provided for in the agreements and while maintaining the overall balance of the respective rights and obligations of the parties. The parties have therefore agreed to the following amendments: 1. Changes to the Reliability Regime in terms of a) exclusion of Significant Defects on four specific STM-DK components (however, capped), b) adjustment of parts of the stepwise improvements during Reliability Demonstration Phase, c) change of requirements for Trial Operation Test for the first five trainsets so more than five trainsets (up to seven trainsets) can be used for the Trial Operation Test in Denmark, the number of Defects allowed are reset for the Trial Operation Test in Denmark and modifications will be allowed during the Trial Operation Test outside Denmark under certain conditions, d) increase of the Reliability Target for Significant Defects and decrease of the Reliability Target for Major Defects and e) introduction of an additonal Reliability Performance Penalty. 2. Change concerning time of delivery. The date of the Preliminary Take Over (PTO) of the first trainset has been postponed by 19 months and an additional penalty for delay has been introduced. 3. Monetary compensation converted into trainsets. DSB will receive a number of trainsets at no cost and will have the possibility to receive an additional number of trainsets at no cost, if DSB submits an Additional Purchase Order for additional trainsets within a certain time frame. A new bonus regime has also been implemented in form of a “win back” mechanism, whereby the supplier can “win back” payment for some of the additional trainsets. 4. Settlement of a number of other disagreements regarding raised claims, Variations and Issues.
Vis mere

Procedure
Type af procedure
Tildeling af en kontrakt uden forudgående offentliggørelse af en indkaldelse af bud i Den Europæiske Unions Tidende (begrundelse):
As noted in section 5.1 the parties have during the project execution disagreed about the responsibility for delay of Milestones in the Project Time Schedule and MPM Time Schedule and about certain issues regarding the Reliability regime of the agreements. Furthermore the parties have disagreed regarding a number of raised claims, Variations and Issues. The parties have reached a consolidated settlement on these matters with due respect to not changing the economic balance of the agreements in favour of the supplier in a manner which was not provided for in the agreements and while maintaining the overall balance of the respective rights and obligations of the parties. The agreements have been subject to tender and DSB does not consider it necessary to conduct a new tender procedure in connection with the changes to the agreements, as the changes are not substantial, cf. Article 89(1)(e) of the Utilities Directive, as defined in Article 89(4) of the Utilities Directive and further elaborated in point (1)-(4) below. (1) The changes do not introduce conditions that, if they had been part of the original tender procedure, would have allowed other applicants than those originally selected access nor would the changes have attracted additional participants in the tender procedure, in this respect it is emphasised that in addition to the four prequalified candidates another three candidates applied but were not prequalified, and the changes would not have changed this and there were no other relevant applicants in the market that would have been able to fulfil the minimum requirements for suitability, (2) the changes would not have resulted in DSB accepting a different offer than the one originally accepted, as the changes would not have led to the submission of significantly different offers, if the changes had been part of DSB’s tender material initially, and because the award of the contract to a large extent was determined by a large difference between the received offers, (3) the changes do not alter the economic balance of the contract in the supplier’s favour in a way that the original contract or framework agreement did not allow for, in this respect it is emphasised that the overall balance of the respective rights and obligations of the parties are maintained as the compensation received by DSB balances the relaxation of the requirements made in favour of the supplier, and (4) the changes do not significantly expand the scope of the contract or framework agreement. In addition to the changes not being substantial, the supplier has previously communicated in early warnings to DSB that the supplier is facing difficulties in their supply chain due to the global shortage of electronic components and raw materials caused by the Russian invasion of Ukraine and the aftermath from the Covid-19 health situation. The supplier has also communicated in early warnings to DSB that they are very challenged with regards to availability of test facilities, as the test facilities in Europe are limited and overbooked due to the many train acquisition projects in the EU. To the extent that the changes should be deemed to be due to these factors, and in particular the Russian invasion of Ukraine, the need for the change could also have arisen due to circumstances that DSB could not have foreseen at the time of entering into the contract. In this case, the amendment may be entered into without a new tender procedure in accordance with Article 89(1)(c) of the Utilities Directive.
Vis mere

Tildeling af kontrakt
Der tildeles en kontrakt/et parti
Dato for indgåelse af kontrakten: 2023-12-13 📅
Titel: New Trains – Supply and Maintenance of Electronic Trainsets
Oplysninger om udbud
Antal modtagne bud: 1
Antal bud, der er modtaget ad elektronisk vej: 1
Antal modtagne bud fra SMV'er: 1
Antal modtagne bud fra bydende fra lande uden for EU: 0
Antal modtagne bud fra tilbudsgivere fra andre EU-medlemsstater: 0
Tilbud – Identifikator: New Trains – Supply and Maintenance of Electronic Trainsets
ID for delkontrakt eller gruppe af delkontrakter: LOT-0001
Navn på tilbudsgiver: Dsb
Navn og adresse på kontrahenten
Navn: Alstom Transport Danmark A/S
Nationalt registreringsnummer: 17184210
Postadresse: Amerika Plads 19
Postnummer: 2100
Postby: Copenhagen
Region: Byen København 🏙️
Land: Danmark 🇩🇰
E-mail: reception.dk.transport@alstomgroup.com 📧
Telefon: +45 23224492 📞
URL: http://www.alstom.com/ 🌏
Den økonomiske operatørs størrelse: Mikrovirksomhed, lille eller mellemstor virksomhed

Ordregivende myndighed
Kommunikation
ID for den foregående bekendtgørelse: 731310-2023
Kilde: OJS 2023/S 241-756823 (2023-12-13)