The object of the contract will include A) Design, engineer, supply on a turnkey EPC (Engineering, Procurement, Construction) basis, erect and commission a gasification plant (app. 60MJ/s) as an add on to DONG Energy's power plant Asnæs#2, based on the technology developed and owned by a subsidiary within the Contracting Authority's group and with other ancillary contracts necessary for completion of the project, and B) Acquisition (100 %) by the successful Candidate as a necessary precondition for contracting the EPC contract of a Subsidiary Entity owning and holding all rights to the technology to be applied in the works, including technology and employees, based on a share purchase agreement
A) DONG Energy has developed a low temperature gasification process suitable for the gasification of straw or other biomass. The process has been proven at demonstration plant scale (6 MJ/s) at DONG Energy's power plant Asnæs#2. Various tests have been executed on the plant since first commissioning in 2011. The technology owned by one of DONG Energy subsidiaries is almost ready for commercial operation and DONG Energy intends to install the first unit at its Asnæs#2 power plant in Kalundborg, Denmark. The scope of this contract will be to design, engineer, supply, erect and commission a low temperature gasification plant (approx. 60 MJ/s) as an add on to Asnæs#2, and any possible ancillary contracts necessary, including such to govern access to reference plant, service and supply of gas produced.
The plant consists of the main sub systems;
— Fuel feeding system;
— Gasification reactors;
— High efficiency cyclones;
— Ash extraction systems (both bottom ash and fly ash);
— Ash handling system;
— Gas duct and burner;
— Partial load flare.
The Candidates shall be responsible for the correct sizing and integration of these 7 main systems as well as the other auxiliary systems required for the integrity of the gasification plant. The primary fuel will be straw but other biomass might also be used. The plant will produce a low temperature syngas for combustion in the Asnæs#2 boiler and an ash which might be used on farmland as fertiliser.
B)The Candidates must notice that in order to be awarded the contract and perform the EPC, the Candidates shall acquire from the Contracting Entity 100 % shares of a subsidiary to the Contracting Entity owning and holding all rights to the technology and Employee in scope for the delivery of the gasification Plant. (The takeover of employees will be effected under the rules of the Law on Employees' right in the event of Transfer of Undertakings, Act No. 710 of August 20th 2002.) Any special conditions regarding the takeover of the employees(no more than 7 persons) including employment conditions, will be described in the tender conditions.
Deadline
Fristen for modtagelse af bud var på 2014-04-16.
Indkøbet blev offentliggjort på 2014-04-02.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2014-04-02
|
Udbudsbekendtgørelse
|
2014-04-11
|
Supplerende oplysninger
|
2014-05-07
|
Supplerende oplysninger
|