Fibre installation - early deployment east

Banedanmark

Banedanmark (BDK), the Danish Railway Manager, is running the Signalling Programme (SP) aiming at renewing the entire signalling and telecommunication systems nationwide. As an early stage and to serve as a proof-of-concept the SP shall implement the Early Deployment Line (EDL) of about 60 km between Roskilde and Næstved. The EDL consists on a fully functional signalling and telecommunication portion of the entire system. This tender includes the building of the passive Fixed Transmission Network (FTN) in the EDL. Thus, the supplier is expected to provide a complete solution in terms of:
— Project design and planning;
— Construction of cable ducts, wells, undershootings, etc;
— Installation of tube, optical fibers, ODF, cabinets, tube dividers, etc;
— Execute of fiber splicing, fiber terminations, tune continuity, etc;
— Execute testing of the installed components, including, tubes, wells, ODFs, fibers, etc;
— Run the entire life-cycle of the project execution from tender assignment to transfer of a full operational passive FTN, including planning and documentation.
The execution of the work is expected to be performed in close proximity of the railway. However, it is expected that the main parts of the work can be performed without track possessions (i.e. closing of the tracks), if the supplier uses machines that can operate in terrain that can access difficult terrain (e.g. slopes).
The entire project is expected to be run according to the project specific details and BDK's internal guidelines on FTN to be provided during the tender phase.

Deadline
Fristen for modtagelse af bud var på 2014-07-14. Indkøbet blev offentliggjort på 2014-06-12.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2014-06-12 Udbudsbekendtgørelse
2014-11-26 Bekendtgørelse om indgåede kontrakter