E106: Electrical and lighting installations, PHS installations and ventilation works
The works contain design, production, delivery and installation of electrical and lighting installations, PHS installations and ventilation works in the process building, waste bunker area and the reception hall in the new energy plant at I/S Amager Ressourcecenter (hereafter referred to as ARC). The new energy plant is approximately 60 m x 205 m of which the administration building forms 60 x 10 m. At it's highest point the new energy plant is approximately 85 m. the The new energy plant consists of reception hall, waste bunker, 2 incinerators/boilers, 1 common turbine, 2 flue gas treatment facilities and supporting facilities. There will be public access to the roof via a ramp on the northern side of the new energy plant. Works in the administration building are not part of the present contract. Contract E106 is the 6th contract of the contracts which will be published in connection with construction of the new energy plant.
Deadline
Fristen for modtagelse af bud var på 2014-05-09.
Indkøbet blev offentliggjort på 2014-03-28.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2014-03-28
|
Udbudsbekendtgørelse
|
2014-12-16
|
Bekendtgørelse om indgåede kontrakter
|