TP 82 The Vigerslev Substation

Banedanmark

Banedanmark requests the contractor to make a detailed design, delivery and commissioning of a new 25 kV railway substation Vigerslev in the Copenhagen area.
The existing Vigerslev substation is situated where the new railway line Copenhagen-Ringsted will run, thus necessitating a new substation. Caused by a high load on the substation and no alternative power supply, the old station must be kept in operation during construction. Both stations must be operating in parallel until all tests on the new station have been concluded.
The work consists of all necessary activities related to the establishment of the new Vigerslev substation including:
— design and build a complete 25 kV railway substation,
— test and commissioning,
— removal, delivery and extension of 25 kV cable system from old substation/railway transformers to new substation.
Optional:
— establishing an additional high voltage feeding cable in public road to a new feeding point between Vigerslev and Hvidovre Fjern stations.
The new substation shall be designed for 1x25 kV 50 Hz AC. It consists of an indoor switchgear of two (2) incoming feeders, eight (8) outgoing feeders and two (2) sectionizing cells, complete with protection and control systems, remote control, low voltage auxiliary systems, batteries etc.
All necessary tests and commissioning are to be included.
All high voltage cables and signaling cables between existing 132/25 kV transformers and existing railway substation shall be exchanged by new cables.
All high voltage feeder cables and signaling cables between existing railway substation and feeder poles shall be relocated to the new railway substation either by new cables or with extension of existing cables.
The existing railway substation shall be in service until the new one are fully tested and put into service. A provisional high voltage cable shall be laid between the two substations to secure redundancy during removal of cables.
Existing railway transformers and demolishing of existing Vigerslev substation are not a part of this contract.

Deadline

Fristen for modtagelse af bud var på 2013-09-20. Indkøbet blev offentliggjort på 2013-08-14.

Leverandører

Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:

Hvem? Hvad? Hvor?
Indkøbshistorik
Dato Dokument
2013-08-14 Udbudsbekendtgørelse
2014-01-07 Bekendtgørelse om indgåede kontrakter
Udbudsbekendtgørelse (2013-08-14)
Objekt
Omfanget af udbuddet
Titel: Arbejder i forbindelse med højspænding
Mængde eller omfang: 3 300 0005 300 000
Bekendtgørelsens metadata
Originalsprog: engelsk 🗣️
Dokumenttype: Udbudsbekendtgørelse
Kontraktens art: Bygge og anlæg
Forordning: Den Europæiske Union
Fælles glossar for offentlige kontrakter (CPV)
Kode: Arbejder i forbindelse med højspænding 📦

Procedure
Procedureform: Begrænset udbud
Bud-type: Indsendelse gældende for alle delaftaler
Kriterier for tildeling
Det økonomisk mest fordelagtige bud

Ordregivende myndighed
Identitet
Land: Danmark 🇩🇰
Type af ordregivende myndighed: Forsyningsvirksomhed
Navn på ordregivende myndighed: Banedanmark
Postadresse: Ringager 4B
Postnummer: 2605
Postby: Broendby
Kontakt
Internetadresse: http://www.bane.dk 🌏
E-mail: nso@bane.dk 📧
Telefon: +45 82340000 📞

Reference
Datoer
Afsendelsesdato: 2013-08-14 📅
Tilbudsfrist: 2013-09-20 📅
Offentliggørelsesdato: 2013-08-17 📅
Identifikatorer
Bekendtgørelsesnummer: 2013/S 159-278439
EUT-S-nummer: 159
Yderligere oplysninger
The new line Copenhagen-Ringsted project intends to invite 4-6 applicants to tender. If there are more than 6 applicants, Banedanmark will undertake prequalification based on references from comparable assignments. The selection will be based on finansial capacity. Description of relevant references for 25 kV cable system in public road, and skills to handle substation for delivery, test and commissioning of railwaypower substation. The preferred referencies are not older than 5-10 years. The tender material will be in english, but Contract Conditions, some background material, including for example geotechnical reports may be in danish. Contractors' technical material must be written in English or Danish. Tenderers must translate tender documentss and other relevant documents themselves. The application can be submitted electronically, on CD/DVD or USB. Tender documents are expected made available about 25.9.2013 IV.3.5) Language(s) in which tenders or requests to participate may be drawn up Official EU language(s): DA, EN, SV Other: Norwigian, Swedish.
Vis mere

Objekt
Omfanget af udbuddet
Kort beskrivelse:
Banedanmark requests the contractor to make a detailed design, delivery and commissioning of a new 25 kV railway substation Vigerslev in the Copenhagen area.
The existing Vigerslev substation is situated where the new railway line Copenhagen-Ringsted will run, thus necessitating a new substation. Caused by a high load on the substation and no alternative power supply, the old station must be kept in operation during construction. Both stations must be operating in parallel until all tests on the new station have been concluded.
Vis mere
The work consists of all necessary activities related to the establishment of the new Vigerslev substation including:
— design and build a complete 25 kV railway substation,
— test and commissioning,
— removal, delivery and extension of 25 kV cable system from old substation/railway transformers to new substation.
Optional:
— establishing an additional high voltage feeding cable in public road to a new feeding point between Vigerslev and Hvidovre Fjern stations.
The new substation shall be designed for 1x25 kV 50 Hz AC. It consists of an indoor switchgear of two (2) incoming feeders, eight (8) outgoing feeders and two (2) sectionizing cells, complete with protection and control systems, remote control, low voltage auxiliary systems, batteries etc.
Vis mere
All necessary tests and commissioning are to be included.
All high voltage cables and signaling cables between existing 132/25 kV transformers and existing railway substation shall be exchanged by new cables.
All high voltage feeder cables and signaling cables between existing railway substation and feeder poles shall be relocated to the new railway substation either by new cables or with extension of existing cables.
The existing railway substation shall be in service until the new one are fully tested and put into service. A provisional high voltage cable shall be laid between the two substations to secure redundancy during removal of cables.
Existing railway transformers and demolishing of existing Vigerslev substation are not a part of this contract.
Anslået værdi uden moms: 3 300 000 💰
5 300 000 💰
Navn på EU-finansieret projekt eller program: TEN_T (Trans-European Transport Network)

Juridiske, økonomiske, finansielle og tekniske oplysninger
Betingelser for deltagelse
Egnethed til at udøve det erhverv:
Registration certificate or other official document for exactly identification of the applicant.
If the applicant is a consortium or joint venture, dokumentaion is required for each participant.
Økonomisk og finansiel stilling:
Annual Reports for the 3 last years. If they are are available on a homepage, a link is sufficient.
If the applicant is a consortium or joint venture, Annual Reports for 3 years are required for each participant.
Teknisk og faglig kompetence:
Description of relevant references for delivery, test and commissioning of railwaypower substation. Description of relevant references for 25 kV cable system in public road. The preferred referencies are not older than 5-10 years.
Kontraktens udførelse
Krav om deponering og sikkerhedsstillelse: Guaranties will be required in accordance to ABT 93 § 6.
De vigtigste finansieringsbetingelser og betalingsordninger og/eller henvisning til de relevante bestemmelser, der regulerer dem: The contractor will be paid monthly for executed works.
Den juridiske form, som den sammenslutning af økonomiske aktører, der skal have kontrakten, skal have: No special legal form will be required.
Andre særlige vilkår: ABT 93 and Banedanmark addenda and corrigenda.

Procedure
Sprog
Sprog: dansk 🗣️
engelsk 🗣️
+ 1 mere svensk 🗣️

Ordregivende myndighed
Kontakt
Enhed: Contract Manager Niels Sørensen
E-mail: kfst@kfst.dk 📧

Reference
Datoer
Startdato: 2013-12-17 📅
Slutdato: 2015-06-15 📅

Supplerende oplysninger
Gennemgå organ
Navn: The Complaints Board for Public
Postadresse: Dahlerups Pakhus, Langelinie Alle 17
Postby: Copenhagen
Postnummer: 2100
Land: Danmark 🇩🇰
E-mail: klfu@erst.dk 📧
Telefon: +45 35291000 📞
Tjeneste, hvorfra der kan indhentes oplysninger om klageproceduren
Navn: The Danish Competion Authority
Postadresse: Carl Jacobsens Vej 35
Postby: Valby
Postnummer: 2500
Telefon: +45 417150000 📞
Kilde: OJS 2013/S 159-278439 (2013-08-14)
Bekendtgørelse om indgåede kontrakter (2014-01-07)
Objekt
Omfanget af udbuddet
Den samlede værdi af udbuddet: 15 774 449 💰
Bekendtgørelsens metadata
Dokumenttype: Bekendtgørelse om indgåede kontrakter

Procedure
Bud-type: Finder ikke anvendelse

Ordregivende myndighed
Identitet
Postadresse: Ringager 4 B

Reference
Datoer
Afsendelsesdato: 2014-01-07 📅
Offentliggørelsesdato: 2014-01-09 📅
Identifikatorer
Bekendtgørelsesnummer: 2014/S 006-007096
Henviser til bekendtgørelse: 2013/S 159-278439
EUT-S-nummer: 6

Ordregivende myndighed
Identitet
Nationalt registreringsnummer: Dk
Kontakt
E-mail: klfu@erst.dk 📧
Kilde: OJS 2014/S 006-007096 (2014-01-07)