TP 50 Bridges and Earthwork west 1
TP 50 earth and construction work stretches from St. 31+152, with the contract boundary being at the southern abutment of S-BRA-07, OP of Lille Syd, and ends at St. 54+200
This package covers the last 23 km of the new line Copenhagen – Ringsted. More about TP50 please notice following link
http://www.bane.dk/visModulbeholder.asp?artikelID=18049
It includes bridge structures, as well as roads, fauna passages, retaining walls and embankments up to and included first layer of sub ballast. Also a number of roads will have to be either, relocated or reconstructed.
The earthwork at the alignment includes both local earth balances as well as total earth balance.
Special attentions should be paid to the crossing of M20 Vestmotorvejen and close to or across the existing main railway line Copenhagen – Ringsted, which could give rise to challenges during construction.
Foundations for the mast of the catenary system are included in this package.
Crossing pipes for railway utilities are included in this package.
The overall earth balance for this tender package has been designed by Banedanmark. The Contractor shall make a detailed design for the earth handling within the contract limit.
Deadline
Fristen for modtagelse af bud var på 2013-09-30.
Indkøbet blev offentliggjort på 2013-08-23.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2013-08-23
|
Udbudsbekendtgørelse
|
2014-06-06
|
Bekendtgørelse om indgåede kontrakter
|