TP 40 Bridges and Earth
Tender Package TP40 south section civil works Ishoej to Koege Nord, is a design and build contract that covers the majority of civil works associated with the construction of the new railway line for the South Section of the Copenhagen to Ringsted Rail Line development.
TP 40A earth and construction work stretch from st. 12+300 and ends at st. 22.000.
Bridges and roads on the first part, from Ishoej Stationsvej to Greve Centervej is build under contract TP41, which is planned to finish march 2015 except Greve Centervej witch first finish September 2015. From here TP 40 will have free passage over and under all structures for doing the earthwork.
In this package covers the first 5.7 km earthwork and small fauna passages, and for the last 4.0 Km also bridge structures, as well as roads, fauna passages, retaining walls and embankments. Also a number of roads will have to be either, relocated or reconstructed.
The earthwork on the alignment includes both local earth balances as well as the total earth balance.
To achieve the proposed alignment a combination of structures and engineering solutions will need to be utilised. The key works will include the following components:
— 2 pipe underpass,
— 1 fauna passage,
— 1 fauna passage with pedestrian tunnel,
— 5 pedestrian tunnels,
— 1 pedestrian bridge,
— 1 railway underpasses,
— 9 retaining walls,
— 11 pipes for fauna passages,
— 1 side borrow,
— rail civil works.
TP 40B earth and construction work stretch from st. 22+000 and ends at st. 30.450.
In this package covers bridge structures, as well as roads, fauna passages, retaining walls and embankments. Also a number of roads will have to be either, relocated or reconstructed.
The earthwork on the alignment includes both local earth balances as well as the total earth balance. Special attentions to be paid on the area around Mc Donald, Cementvej and
Taastrupvej, due to large intensity of traffic, which could arise some challenges during construction time.
To achieve the proposed alignment a combination of structures and engineering solutions will need to be utilised. The key works will include the following components:
— 4 fauna passages,
— 1 railway underpasses,
— 4 railway overpasses,
— 1 pedestrian bridge,
— 1 valley crossing bridge,
— 2 retaining walls,
— 11 pipes for fauna passages,
— 2 noise screens,
— rail civil works.
TP40 is to be signed September 2013 and to be handover September 2016.
Further information can be obtained on:
http://uk.bane.dk/visArtikel_eng.asp?artikelID=15492”
Deadline
Fristen for modtagelse af bud var på 2013-03-11.
Indkøbet blev offentliggjort på 2013-01-30.
Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2013-01-30
|
Udbudsbekendtgørelse
|
2013-11-21
|
Bekendtgørelse om indgåede kontrakter
|