TP 4 Urban Tunnels
Tender Package TP4, Urban Tunnels, is a design and build contract that covers the majority of civil works associated with the construction of the new railway line for the Urban Section of the Copenhagen to Ringsted Rail Line development.
The contract is located between ch.0+100 and ch.4+100, which passes through a built up area of Copenhagen. The nature of the site provides a number of challenges and constraints for the proposed railway alignment such as existing structures, highways, utilities and environmental requirements. As a result the proposed railway alignment varies, both in line and level, along the route in order to provide an efficient and economical design, while at the same time minimising the impact of the scheme on the surrounding area.
To achieve the proposed alignment a combination of structures and engineering solutions will need to be utilised. The key works will include the following components:
- 1 255m of Tunnel Structures
- 1 795m of Trough Structures
- 5No. Emergency Exits with Ramps
- 2no. Pumping Stations with Emergency Exits
- 2No. New Pedestrian Bridges
- 1no. Modified Pedestrian Bridges
- 2No. Railway Bridges
- Changes to existing highways
- MEP and SCADA systems (excluding components directly related to the railway operating systems)
- Rail Civil Works
- Earthworks
Further information can be obtained on:
http://uk.bane.dk/visArtikel_eng.asp?artikelID=15488
Deadline
Fristen for modtagelse af bud var på 2013-03-05.
Indkøbet blev offentliggjort på 2013-01-23.
Hvem?
Hvad?
Hvor?
Indkøbshistorik
Dato |
Dokument |
2013-01-23
|
Udbudsbekendtgørelse
|