TP 10 Bridges and Earth
The contract is planned as a design and build contract with negotiated procedures where the contractor has the full responsibility of the entire alignment, road crossing etc, with the contract boundaries.
This contract includes all construction works as well as earthworks up to sub ballast, on the 3 km long alignment.
There are four large structures on the alignment: construction of road bridge(Brøndbyøstervej) passing over the New Railway and Holbæk Motorway at st. 4+351 / 4+371 to st. 4+780, followed by a railway tunnel under Holbaek Motorway in st. 4+780, passage of Vestvolden and Faestningskanalen at 5+578 to 5+870 and flyover of M3 at 5+807, flyover of exit M21 in 5+900 and several other crossings. Cutting through and relocation of existing baffle walls on both sides of the Holbæk Motorway.
A more detailed scope of work can be seen her:
http://uk.bane.dk/visArtikel_eng.asp?artikelID=15491.
Deadline
Fristen for modtagelse af bud var på 2012-11-12.
Indkøbet blev offentliggjort på 2012-10-02.