Nationwide contract concerning measuring track geometry on main and side tracks, crossing pieces and overhead wire for Banedanmark. The overhead wires must be measured both dynamic and static. Futhermore the contract concerns data management in terms of data production and processing for debugging and maintenance. The measuring train available for the job has to be highspeed and self-propelled, and the equipment must simultaneously measure both track location and overhead wire

Banedanmark

Nationwide contract concerning measuring track geometry on main and side tracks, crossing pieces and overhead wire for Banedanmark. The overhead wires must be measured both dynamic and static. Futhermore the contract concerns data management in terms of data production and processing for debugging and maintenance. The contract includes measure of track geometry and overhead wire with a self-propelled measuring train. The number of measure campaigns on the main tracks is 4 pr year and 2 campaigns pr year for the sidetracks. The approximately number of measuring days is 35 days for main tracks and 18 days for side tracks per year. Prior to these campaigns, the supplier must conduct 2 test campaigns (track and overhead wire), scheduled for aug-dec 2012 where the relevant measuring train has to be used.

Deadline
Fristen for modtagelse af bud var på 2012-04-12. Indkøbet blev offentliggjort på 2012-03-09.

Leverandører
Følgende leverandører er nævnt i tildelingsbeslutninger eller andre indkøbsdokumenter:
Hvem?

Hvad?

Hvor?

Indkøbshistorik
Dato Dokument
2012-03-09 Udbudsbekendtgørelse
2012-06-08 Bekendtgørelse om indgåede kontrakter